Electrical permits in Richmond, CA

Data through April 2025 · updated 21 Oct 2026

1,176 electrical permits were issued in Richmond, May 2023 through April 2025: about 588 a year and 17% of all permits. 585 electrical permits in the last 12 months on file (May 2024–Apr 2025), about the same as the 591 in the 12 months before. The busiest month is May. The usual one took 69 days from issue to the city's final. 94801 has the most, 419.

1,176permits issued
585last 12 months on file
Maybusiest month
69days, usual issue to final
76%finished
$4,500usual declared value
Apr 2025records through

Electrical permits by month

Permits issued each month, May 2023 through April 2025.

May 2023: 63May2023Jun 2023: 39Jul 2023: 40JulAug 2023: 54Sep 2023: 39Oct 2023: 49Nov 2023: 43Dec 2023: 40Jan 2024: 64Jan2024Feb 2024: 42Mar 2024: 60Apr 2024: 58May 2024: 53Jun 2024: 28Jul 2024: 48JulAug 2024: 60Sep 2024: 56Oct 2024: 63Nov 2024: 40Dec 2024: 40Jan 2025: 51Jan2025Feb 2025: 57Mar 2025: 46Apr 2025: 43
The same numbers as a table
MonthPermits
May 202363
Jun 202339
Jul 202340
Aug 202354
Sep 202339
Oct 202349
Nov 202343
Dec 202340
Jan 202464
Feb 202442
Mar 202460
Apr 202458
May 202453
Jun 202428
Jul 202448
Aug 202460
Sep 202456
Oct 202463
Nov 202440
Dec 202440
Jan 202551
Feb 202557
Mar 202546
Apr 202543

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). May is the busiest (118), June the quietest (68). A busy month at the permit counter usually means a longer wait for a contractor.

January: 117 (100 = an average month)February: 101 (100 = an average month)March: 108 (100 = an average month)April: 103 (100 = an average month)May: 118 (100 = an average month)118June: 68 (100 = an average month)July: 90 (100 = an average month)August: 116 (100 = an average month)September: 97 (100 = an average month)October: 114 (100 = an average month)November: 85 (100 = an average month)December: 82 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January117
February101
March108
April103
May118
June68
July90
August116
September97
October114
November85
December82

Download this table (CSV)

How long an electrical permit takes

Permits issued May 2023–Apr 2024, at least 12 months before the file ends. Usual days is the middle permit among the 448 with a final date.

MeasureValue
Permits issued May 2023–Apr 2024591
Finished76.0%
Expired10.8%
Usual days, issue to final69
Middle half, days28–148

Download this table (CSV)

What an electrical permit is declared at

The value written on the permit at application, from 1,170 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$4,500
Middle half$2,500–$8,000

Download this table (CSV)

ZIP codes with the most electrical permits

Counted at the property's ZIP code. Share is the part of the city's 1,176 electrical permits.

ZIP codePermitsShare
9480141936%
9480440134%
9480513812%
948031089%
948061079%
945302under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
BLD ELC RESIDENTIAL: SERVICE UPGRADE46840%
BLD ELC RESIDENTIAL: REWIRE/REPAIR958%
BLD ELC RESIDENTIAL: ELEC VEH SUP EQUIP797%
BLD ELC RESIDENTIAL: SERVICE REPAIR756%
BLD ELC INDUSTRIAL: ELC EQUIP NEW484%
BLD ELC INDUSTRIAL: ELC EQUIP UPGRADE484%
BLD ELC INDUSTRIAL: ELC TEMP POWER424%
BLD ELC INDUSTRIAL: EQUIP NEW363%
BLD ELC RESIDENTIAL: POWER WALL BATTERY STORAGE333%
BLD ELC INDUSTRIAL: TEMP POWER303%

Download this table (CSV)

How Richmond compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Electrical permits for other places in the Bay Area. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Transparent Richmond, PermitTrak (Socrata dataset qg2r-652v), read 21 Oct 2026. We count permits issued May 2023 through April 2025; denied and withdrawn permits are left out.

Building and trade permits the City of Richmond issued inside the city limits, including SolarAPP+ solar permits; a few city parcels carry an El Sobrante or San Pablo mailing address. Encroachment, fire, wastewater, rent-control and business permits, plan-check records and revisions of earlier permits are left out. Unincorporated North Richmond and El Sobrante are permitted by Contra Costa County and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Richmond.
  • The city's published file holds no building permit issued after April 2025, although it is still updated for other permit kinds, so these pages end with April 2025.
  • Finished means the city's status is Finaled or Closed; a final date comes from the city's finaled date. Expired permits lapsed without a final inspection; cancelled permits are not counted.
  • The value is the job value declared on the permit.
  • Homes are the permits the city files as residential (building, electrical, plumbing and mechanical) plus SolarAPP+ rooftop solar permits.
  • Solar battery (Powerwall) permits without panels count as electrical; seismic retrofits and alteration or repair permits count as remodels.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in Richmond, CA", https://contractorrecords.com/richmond-ca/electrical-permits, data through April 2025, from City of Richmond Building Services building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: days to final · Electrical permits: declared value · Electrical permits by ZIP code · Electrical permits by permit type.

Common questions

  • How many electrical permits does Richmond issue a year?About 588 a year in Richmond: 1,176 permits issued May 2023 through April 2025, 585 of them in the last 12 months on file (to April 2025).
  • How long does an electrical permit take in Richmond?The usual one took 69 days from issue to the city's final inspection, and the middle half took 28 to 148 days (448 permits issued May 2023–Apr 2024 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Richmond file the most electrical permits?May (118 against an average month of 100); June is the quietest (68). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most electrical permits in Richmond?94801, with 419 of the 1,176 (36%); then 94804 (401).