Contractor Records
Home › Richmond › Plumbing

Plumbing permits in Richmond, CA

Data through April 2025 · updated 21 Oct 2026

726 plumbing permits were issued in Richmond, May 2023 through April 2025: about 363 a year and 11% of all permits. 322 plumbing permits in the last 12 months on file (May 2024–Apr 2025), 20% fewer than the 404 in the 12 months before. The busiest month is June. The usual one took 35 days from issue to the city's final. 94806 has the most, 260.

726permits issued
322last 12 months on file
Junbusiest month
35days, usual issue to final
61%finished
$3,650usual declared value
Apr 2025records through

Plumbing permits by month

Permits issued each month, May 2023 through April 2025.

May 2023: 49May2023Jun 2023: 82Jul 2023: 21JulAug 2023: 58Sep 2023: 24Oct 2023: 13Nov 2023: 25Dec 2023: 12Jan 2024: 24Jan2024Feb 2024: 35Mar 2024: 30Apr 2024: 31May 2024: 17Jun 2024: 7Jul 2024: 42JulAug 2024: 28Sep 2024: 27Oct 2024: 42Nov 2024: 39Dec 2024: 19Jan 2025: 25Jan2025Feb 2025: 26Mar 2025: 29Apr 2025: 21
The same numbers as a table
MonthPermits
May 202349
Jun 202382
Jul 202321
Aug 202358
Sep 202324
Oct 202313
Nov 202325
Dec 202312
Jan 202424
Feb 202435
Mar 202430
Apr 202431
May 202417
Jun 20247
Jul 202442
Aug 202428
Sep 202427
Oct 202442
Nov 202439
Dec 202419
Jan 202525
Feb 202526
Mar 202529
Apr 202521

Download this table (CSV)

When plumbing permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (147), December the quietest (51). A busy month at the permit counter usually means a longer wait for a contractor.

January: 81 (100 = an average month)February: 101 (100 = an average month)March: 98 (100 = an average month)April: 86 (100 = an average month)May: 109 (100 = an average month)June: 147 (100 = an average month)147July: 104 (100 = an average month)August: 142 (100 = an average month)September: 84 (100 = an average month)October: 91 (100 = an average month)November: 106 (100 = an average month)December: 51 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January81
February101
March98
April86
May109
June147
July104
August142
September84
October91
November106
December51

Download this table (CSV)

How long a plumbing permit takes

Permits issued May 2023–Apr 2024, at least 12 months before the file ends. Usual days is the middle permit among the 240 with a final date.

MeasureValue
Permits issued May 2023–Apr 2024404
Finished61.4%
Expired22.8%
Usual days, issue to final35
Middle half, days15–115

Download this table (CSV)

What a plumbing permit is declared at

The value written on the permit at application, from 720 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$3,650
Middle half$2,659–$4,875

Download this table (CSV)

ZIP codes with the most plumbing permits

Counted at the property's ZIP code. Share is the part of the city's 726 plumbing permits.

ZIP codePermitsShare
9480626036%
9480422831%
948039213%
948018812%
94805578%
945301under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
BLD PLM RESIDENTIAL: WATER HEATER REPLACEMENT36450%
BLD PLM COMMERCIAL: WATER HEATER REPLACEMENT13619%
BLD PLM RESIDENTIAL: ALTERATION/REPAIR517%
BLD PLM RESIDENTIAL: GAS SHUT-OFF436%
BLD PLM RESIDENTIAL: WATER PIPE RPL274%
BLD PLM RESIDENTIAL: GAS PIPE REPAIR193%
BLD PLM RESIDENTIAL: SEWER REPLACE162%
BLD PLM RESIDENTIAL: SEWER REPAIR112%
BLD PLM RESIDENTIAL: REPIPE COPPER PIPES101%
BLD PLM RESIDENTIAL: GAS PIPE NEW91%

Download this table (CSV)

How Richmond compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Plumbing permits for other places in the Bay Area. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Transparent Richmond, PermitTrak (Socrata dataset qg2r-652v), read 21 Oct 2026. We count permits issued May 2023 through April 2025; denied and withdrawn permits are left out.

Building and trade permits the City of Richmond issued inside the city limits, including SolarAPP+ solar permits; a few city parcels carry an El Sobrante or San Pablo mailing address. Encroachment, fire, wastewater, rent-control and business permits, plan-check records and revisions of earlier permits are left out. Unincorporated North Richmond and El Sobrante are permitted by Contra Costa County and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Richmond.
  • The city's published file holds no building permit issued after April 2025, although it is still updated for other permit kinds, so these pages end with April 2025.
  • Finished means the city's status is Finaled or Closed; a final date comes from the city's finaled date. Expired permits lapsed without a final inspection; cancelled permits are not counted.
  • The value is the job value declared on the permit.
  • Homes are the permits the city files as residential (building, electrical, plumbing and mechanical) plus SolarAPP+ rooftop solar permits.
  • Solar battery (Powerwall) permits without panels count as electrical; seismic retrofits and alteration or repair permits count as remodels.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Plumbing permits in Richmond, CA", https://contractorrecords.com/richmond-ca/plumbing-permits, data through April 2025, from City of Richmond Building Services building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Plumbing permits by month · Plumbing permits by calendar month (index) · Plumbing permits: days to final · Plumbing permits: declared value · Plumbing permits by ZIP code · Plumbing permits by permit type.

Common questions

  • How many plumbing permits does Richmond issue a year?About 363 a year in Richmond: 726 permits issued May 2023 through April 2025, 322 of them in the last 12 months on file (to April 2025).
  • How long does a plumbing permit take in Richmond?The usual one took 35 days from issue to the city's final inspection, and the middle half took 15 to 115 days (240 permits issued May 2023–Apr 2024 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Richmond file the most plumbing permits?June (147 against an average month of 100); December is the quietest (51). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most plumbing permits in Richmond?94806, with 260 of the 726 (36%); then 94804 (228).