Data through April 2025 · updated 21 Oct 2026

1,054 roofing permits were issued in Richmond, May 2023 through April 2025: about 527 a year and 16% of all permits. 525 roofing permits in the last 12 months on file (May 2024–Apr 2025), about the same as the 529 in the 12 months before. The busiest month is August. The usual one took 31 days from issue to the city's final. 94804 has the most, 424.

1,054permits issued
525last 12 months on file
Augbusiest month
31days, usual issue to final
86%finished
$14,750usual declared value
Apr 2025records through

Roofing permits by month

Permits issued each month, May 2023 through April 2025.

May 2023: 49May2023Jun 2023: 42Jul 2023: 43JulAug 2023: 73Sep 2023: 52Oct 2023: 55Nov 2023: 35Dec 2023: 23Jan 2024: 32Jan2024Feb 2024: 33Mar 2024: 35Apr 2024: 57May 2024: 39Jun 2024: 34Jul 2024: 40JulAug 2024: 59Sep 2024: 58Oct 2024: 51Nov 2024: 27Dec 2024: 26Jan 2025: 59Jan2025Feb 2025: 45Mar 2025: 47Apr 2025: 40
The same numbers as a table
MonthPermits
May 202349
Jun 202342
Jul 202343
Aug 202373
Sep 202352
Oct 202355
Nov 202335
Dec 202323
Jan 202432
Feb 202433
Mar 202435
Apr 202457
May 202439
Jun 202434
Jul 202440
Aug 202459
Sep 202458
Oct 202451
Nov 202427
Dec 202426
Jan 202559
Feb 202545
Mar 202547
Apr 202540

Download this table (CSV)

When roofing permits are filed

By calendar month, 100 = an average month (the thin line). August is the busiest (150), December the quietest (56). A busy month at the permit counter usually means a longer wait for a contractor.

January: 104 (100 = an average month)February: 89 (100 = an average month)March: 93 (100 = an average month)April: 110 (100 = an average month)May: 100 (100 = an average month)June: 87 (100 = an average month)July: 94 (100 = an average month)August: 150 (100 = an average month)150September: 125 (100 = an average month)October: 121 (100 = an average month)November: 71 (100 = an average month)December: 56 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January104
February89
March93
April110
May100
June87
July94
August150
September125
October121
November71
December56

Download this table (CSV)

How long a roofing permit takes

Permits issued May 2023–Apr 2024, at least 12 months before the file ends. Usual days is the middle permit among the 455 with a final date.

MeasureValue
Permits issued May 2023–Apr 2024529
Finished86.4%
Expired8.5%
Usual days, issue to final31
Middle half, days16–77

Download this table (CSV)

What a roofing permit is declared at

The value written on the permit at application, from 1,053 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$14,750
Middle half$10,800–$18,425

Download this table (CSV)

ZIP codes with the most roofing permits

Counted at the property's ZIP code. Share is the part of the city's 1,054 roofing permits.

ZIP codePermitsShare
9480442440%
9480119318%
9480517717%
9480316416%
94806969%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
BLD RESIDENTIAL: REROOF97092%
BLD COMMERCIAL: REROOF727%
BLD INDUSTRIAL: REROOF121%

Download this table (CSV)

How Richmond compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Roofing permits for other places in the Bay Area. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Transparent Richmond, PermitTrak (Socrata dataset qg2r-652v), read 21 Oct 2026. We count permits issued May 2023 through April 2025; denied and withdrawn permits are left out.

Building and trade permits the City of Richmond issued inside the city limits, including SolarAPP+ solar permits; a few city parcels carry an El Sobrante or San Pablo mailing address. Encroachment, fire, wastewater, rent-control and business permits, plan-check records and revisions of earlier permits are left out. Unincorporated North Richmond and El Sobrante are permitted by Contra Costa County and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Richmond.
  • The city's published file holds no building permit issued after April 2025, although it is still updated for other permit kinds, so these pages end with April 2025.
  • Finished means the city's status is Finaled or Closed; a final date comes from the city's finaled date. Expired permits lapsed without a final inspection; cancelled permits are not counted.
  • The value is the job value declared on the permit.
  • Homes are the permits the city files as residential (building, electrical, plumbing and mechanical) plus SolarAPP+ rooftop solar permits.
  • Solar battery (Powerwall) permits without panels count as electrical; seismic retrofits and alteration or repair permits count as remodels.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Roofing permits in Richmond, CA", https://contractorrecords.com/richmond-ca/roofing-permits, data through April 2025, from City of Richmond Building Services building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Roofing permits by month · Roofing permits by calendar month (index) · Roofing permits: days to final · Roofing permits: declared value · Roofing permits by ZIP code · Roofing permits by permit type.

Common questions

  • How many roofing permits does Richmond issue a year?About 527 a year in Richmond: 1,054 permits issued May 2023 through April 2025, 525 of them in the last 12 months on file (to April 2025).
  • How long does a roofing permit take in Richmond?The usual one took 31 days from issue to the city's final inspection, and the middle half took 16 to 77 days (455 permits issued May 2023–Apr 2024 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Richmond file the most roofing permits?August (150 against an average month of 100); December is the quietest (56). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most roofing permits in Richmond?94804, with 424 of the 1,054 (40%); then 94801 (193).