4,748 building permits issued in the City of Tempe, October 2024 through September 2026: about 2,374 a year. The biggest kind of work is electrical, with 979. 2,466 permits in the last 12 months (Oct 2025–Sep 2026), 8% more than the 2,282 in the 12 months before. 62% were permits for homes. The busiest month for permits is April.

4,748permits issued
2,466last 12 months
+8%vs the 12 months before
62%for homes
Aprbusiest month
Sep 2026records through

By kind of work

Permits issued October 2024 through September 2026. Last 12 months is Oct 2025–Sep 2026; the 12 months before is Oct 2024–Sep 2025. Homes is the share issued as residential permits. Busiest month is the calendar month with the most permits on average.

Kind of workPermitsShareLast 12 mo12 mo beforeChangeHomesBusiest month
Electrical97921%536443+21%80%October
Remodels & repairs86018%463397+17%100%April
Plumbing52711%254273−7%66%August
Solar3618%164197−17%94%October
Additions1513%8368+22%100%May
Pools & spas1213%4774−36%91%April
Garages, sheds & shade structures1012%5942+40%100%September
ADUs & casitas1012%7130+137%100%June
Other1,25826%652606+8%0%September

Fewer than 100 permits, so no row: new homes (94), demolition (85), HVAC (71), roofing (20), fences & walls (19).

Download this table (CSV)

By year

Permits issued in each calendar year of the window. Per year scales a part year to 12 months.

YearMonthsPermitsPer year
2024 (from October)35402,160
2025122,3802,380
2026 (through September)91,8282,437

Download this table (CSV)

By month

Permits issued each month, October 2024 through September 2026. The tallest bar is the busiest month on file.

Oct 2024: 206Oct2024Nov 2024: 158Dec 2024: 176Jan 2025: 208Jan2025Feb 2025: 228Mar 2025: 194Apr 2025: 222May 2025: 196Jun 2025: 184Jul 2025: 168JulAug 2025: 181Sep 2025: 161Oct 2025: 223Nov 2025: 208Dec 2025: 207Jan 2026: 174Jan2026Feb 2026: 160Mar 2026: 215Apr 2026: 245May 2026: 183Jun 2026: 207Jul 2026: 194JulAug 2026: 223Sep 2026: 227
The same numbers as a table
MonthPermits
Oct 2024206
Nov 2024158
Dec 2024176
Jan 2025208
Feb 2025228
Mar 2025194
Apr 2025222
May 2025196
Jun 2025184
Jul 2025168
Aug 2025181
Sep 2025161
Oct 2025223
Nov 2025208
Dec 2025207
Jan 2026174
Feb 2026160
Mar 2026215
Apr 2026245
May 2026183
Jun 2026207
Jul 2026194
Aug 2026223
Sep 2026227

Download this table (CSV)

When each kind of work is filed

Permits by calendar month, 100 = an average month (the thin line), October 2024 through September 2026. Kinds of work do not all peak together. Each month is counted twice (once a year), so one unusual month still moves these numbers.

Electrical

979 permits · busiest October, quietest August

January: 99 (100 = an average month)February: 96 (100 = an average month)March: 107 (100 = an average month)April: 112 (100 = an average month)May: 104 (100 = an average month)June: 93 (100 = an average month)July: 94 (100 = an average month)August: 87 (100 = an average month)September: 92 (100 = an average month)October: 113 (100 = an average month)113November: 93 (100 = an average month)December: 110 (100 = an average month)JFMAMJJASOND

Remodels & repairs

860 permits · busiest April, quietest July

January: 95 (100 = an average month)February: 114 (100 = an average month)March: 98 (100 = an average month)April: 152 (100 = an average month)152May: 112 (100 = an average month)June: 89 (100 = an average month)July: 78 (100 = an average month)August: 95 (100 = an average month)September: 84 (100 = an average month)October: 95 (100 = an average month)November: 103 (100 = an average month)December: 85 (100 = an average month)JFMAMJJASOND

Plumbing

527 permits · busiest August, quietest September

January: 114 (100 = an average month)February: 80 (100 = an average month)March: 109 (100 = an average month)April: 116 (100 = an average month)May: 80 (100 = an average month)June: 91 (100 = an average month)July: 105 (100 = an average month)August: 130 (100 = an average month)130September: 77 (100 = an average month)October: 107 (100 = an average month)November: 82 (100 = an average month)December: 109 (100 = an average month)JFMAMJJASOND

Solar

361 permits · busiest October, quietest January

January: 66 (100 = an average month)February: 66 (100 = an average month)March: 90 (100 = an average month)April: 116 (100 = an average month)May: 120 (100 = an average month)June: 76 (100 = an average month)July: 93 (100 = an average month)August: 110 (100 = an average month)September: 116 (100 = an average month)October: 123 (100 = an average month)123November: 100 (100 = an average month)December: 123 (100 = an average month)JFMAMJJASOND

Additions

151 permits · busiest May, quietest October

January: 127 (100 = an average month)February: 48 (100 = an average month)March: 111 (100 = an average month)April: 119 (100 = an average month)May: 159 (100 = an average month)159June: 79 (100 = an average month)July: 135 (100 = an average month)August: 135 (100 = an average month)September: 72 (100 = an average month)October: 40 (100 = an average month)November: 79 (100 = an average month)December: 95 (100 = an average month)JFMAMJJASOND

Pools & spas

121 permits · busiest April, quietest August

January: 89 (100 = an average month)February: 109 (100 = an average month)March: 79 (100 = an average month)April: 188 (100 = an average month)188May: 119 (100 = an average month)June: 109 (100 = an average month)July: 99 (100 = an average month)August: 40 (100 = an average month)September: 99 (100 = an average month)October: 79 (100 = an average month)November: 109 (100 = an average month)December: 79 (100 = an average month)JFMAMJJASOND

Garages, sheds & shade structures

101 permits · busiest September, quietest May

January: 107 (100 = an average month)February: 95 (100 = an average month)March: 95 (100 = an average month)April: 83 (100 = an average month)May: 36 (100 = an average month)June: 83 (100 = an average month)July: 71 (100 = an average month)August: 48 (100 = an average month)September: 214 (100 = an average month)214October: 178 (100 = an average month)November: 95 (100 = an average month)December: 95 (100 = an average month)JFMAMJJASOND

ADUs & casitas

101 permits · busiest June, quietest May

January: 59 (100 = an average month)February: 119 (100 = an average month)March: 166 (100 = an average month)April: 83 (100 = an average month)May: 48 (100 = an average month)June: 190 (100 = an average month)190July: 154 (100 = an average month)August: 119 (100 = an average month)September: 83 (100 = an average month)October: 71 (100 = an average month)November: 59 (100 = an average month)December: 48 (100 = an average month)JFMAMJJASOND
The same numbers as a table
Kind of workJanFebMarAprMayJunJulAugSepOctNovDec
Electrical99961071121049394879211393110
Remodels & repairs9511498152112897895849510385
Plumbing1148010911680911051307710782109
Solar6666901161207693110116123100123
Additions127481111191597913513572407995
Pools & spas89109791881191099940997910979
Garages, sheds & shade structures107959583368371482141789595
ADUs & casitas59119166834819015411983715948

Download this table (CSV)

Homes and everything else

How the city classed each permit. Other covers commercial buildings, signs, towers and similar work.

Permit classPermitsShareLast 12 mo
Homes (residential)2,92462%1,512
Other1,82438%954

Download this table (CSV)

How many permits get finished

Permits issued Oct 2024–Sep 2025, so each has had at least 12 months to reach a final. Finished means the city recorded a final inspection or marked it complete; expired means it lapsed without one.

StatusPermitsShare
Finished1,63171.5%
Still open33914.9%
Expired31213.7%

How long each kind of permit takes →

Download this table (CSV)

By ZIP code

The 6 ZIP codes with the most permits, counted at the property's ZIP code. A ZIP code can cross into a city that runs its own permit office; only the city's permits are counted.

ZIP codePermitsShareTop kind of work
852821,41230%Electrical (362)
852811,03522%Electrical (213)
8528394620%Remodels & repairs (256)
8528481217%Electrical (154)
8528853011%Electrical (73)
850401under 1%Solar (1)

All 5 ZIP codes with 250+ permits →

Download this table (CSV)

How Tempe compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Permit statistics for other places in Phoenix. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Tempe Open Data, Permits Issued by Building Safety (BLDS layer from Accela), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, trade, pool, sign and demolition permits the City of Tempe Building Safety Division issues inside the city limits only. Phoenix, Mesa, Chandler, Scottsdale and unincorporated Maricopa County run their own permit offices and are not in this file. The city's engineering permits (water and sewer, drainage, paving, grading) are left out.

  • The city's open permit file leaves the contractor field blank on building permits, so there are no contractor lists, rankings or firm pages for Tempe.
  • The value is the estimated project cost on the permit; electrical, plumbing and mechanical permits are filed as no-value permits and carry none. It is not a final cost.
  • Kinds of work come from the permit's federal building class; general residential alterations and miscellaneous permits are sorted into trades by keywords in the work description.
  • Few roof replacements appear in the file, so roofing has no page of its own.
  • A final date is the date the city recorded the permit as completed. Permits marked Final, Finaled, CofO Issued or Closed count as finished; some of them carry no completed date and add no days.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "The City of Tempe, AZ building permit statistics", https://contractorrecords.com/tempe/permit-statistics, data through September 2026, from the City of Tempe Building Safety Division building-permit records.

Link to a table: By kind of work · By year · By month · When each kind of work is filed · Homes and everything else · How many get finished · By ZIP code.

Download the tables (CSV): Permits by kind of work · Permits by year · Permits by month · Permits by calendar month (index) · Homes and other permits · Finished, open and expired · Permits by ZIP code.

Common questions

  • How many building permits does Tempe issue a year?About 2,374 a year in the City of Tempe: 4,748 permits over 24 months, October 2024 through September 2026. 2,466 permits in the last 12 months (Oct 2025–Sep 2026), 8% more than the 2,282 in the 12 months before.
  • Are building permits up or down in Tempe?2,466 permits in the last 12 months (Oct 2025–Sep 2026), 8% more than the 2,282 in the 12 months before. Electrical permits grew most (443 to 536); solar permits fell most (197 to 164).
  • What is the busiest month for permits in Tempe?April, counting every kind of work (118 against an average month of 100). July is the quietest (91). Each kind of work has its own season; the charts above show them.
  • What share of Tempe permits are for homes?62%: 2,924 of the 4,748 permits issued October 2024 through September 2026 were residential permits.