Electrical permits in the City of Tempe, AZ

Data through September 2026 · updated 19 Oct 2026

979 electrical permits were issued in the City of Tempe, October 2024 through September 2026: about 490 a year and 21% of all permits. 536 electrical permits in the last 12 months (Oct 2025–Sep 2026), 21% more than the 443 in the 12 months before. The busiest month is October. The usual one took 30 days from issue to the city's final. 85282 has the most, 362.

979permits issued
536last 12 months
Octbusiest month
30days, usual issue to final
66%finished
$3,900usual declared value
Sep 2026records through

Electrical permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 33Oct2024Nov 2024: 30Dec 2024: 38Jan 2025: 42Jan2025Feb 2025: 44Mar 2025: 42Apr 2025: 46May 2025: 36Jun 2025: 39Jul 2025: 34JulAug 2025: 28Sep 2025: 31Oct 2025: 59Nov 2025: 46Dec 2025: 52Jan 2026: 39Jan2026Feb 2026: 34Mar 2026: 45Apr 2026: 45May 2026: 49Jun 2026: 37Jul 2026: 43JulAug 2026: 43Sep 2026: 44
The same numbers as a table
MonthPermits
Oct 202433
Nov 202430
Dec 202438
Jan 202542
Feb 202544
Mar 202542
Apr 202546
May 202536
Jun 202539
Jul 202534
Aug 202528
Sep 202531
Oct 202559
Nov 202546
Dec 202552
Jan 202639
Feb 202634
Mar 202645
Apr 202645
May 202649
Jun 202637
Jul 202643
Aug 202643
Sep 202644

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (113), August the quietest (87). A busy month at the permit counter usually means a longer wait for a contractor.

January: 99 (100 = an average month)February: 96 (100 = an average month)March: 107 (100 = an average month)April: 112 (100 = an average month)May: 104 (100 = an average month)June: 93 (100 = an average month)July: 94 (100 = an average month)August: 87 (100 = an average month)September: 92 (100 = an average month)October: 113 (100 = an average month)113November: 93 (100 = an average month)December: 110 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January99
February96
March107
April112
May104
June93
July94
August87
September92
October113
November93
December110

Download this table (CSV)

How long an electrical permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 222 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025443
Finished66.4%
Expired20.5%
Usual days, issue to final30
Middle half, days13–83

Download this table (CSV)

What an electrical permit is declared at

The value written on the permit at application, from 952 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$3,900
Middle half$2,500–$6,525

Download this table (CSV)

ZIP codes with the most electrical permits

Counted at the property's ZIP code. Share is the part of the city's 979 electrical permits.

ZIP codePermitsShare
8528236237%
8528121322%
8528317518%
8528415416%
85288737%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Electrical - No Value94396%
Additions or Alterations - Residential182%
Miscellaneous(Barns, Sheds, Tennis Courts, etc.)121%
Residential Addition/Alteration/Remodel3under 1%
Renewal of Existing Permit2under 1%
New Single Family Residential1under 1%

Download this table (CSV)

How Tempe compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Electrical permits for other places in Phoenix. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Tempe Open Data, Permits Issued by Building Safety (BLDS layer from Accela), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, trade, pool, sign and demolition permits the City of Tempe Building Safety Division issues inside the city limits only. Phoenix, Mesa, Chandler, Scottsdale and unincorporated Maricopa County run their own permit offices and are not in this file. The city's engineering permits (water and sewer, drainage, paving, grading) are left out.

  • The city's open permit file leaves the contractor field blank on building permits, so there are no contractor lists, rankings or firm pages for Tempe.
  • The value is the estimated project cost on the permit; electrical, plumbing and mechanical permits are filed as no-value permits and carry none. It is not a final cost.
  • Kinds of work come from the permit's federal building class; general residential alterations and miscellaneous permits are sorted into trades by keywords in the work description.
  • Few roof replacements appear in the file, so roofing has no page of its own.
  • A final date is the date the city recorded the permit as completed. Permits marked Final, Finaled, CofO Issued or Closed count as finished; some of them carry no completed date and add no days.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in the City of Tempe, AZ", https://contractorrecords.com/tempe/electrical-permits, data through September 2026, from the City of Tempe Building Safety Division building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: days to final · Electrical permits: declared value · Electrical permits by ZIP code · Electrical permits by permit type.

Common questions

  • How many electrical permits does Tempe issue a year?About 490 a year in the City of Tempe: 979 permits issued October 2024 through September 2026, 536 of them in the last 12 months.
  • How long does an electrical permit take in Tempe?The usual one took 30 days from issue to the city's final inspection, and the middle half took 13 to 83 days (222 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Tempe file the most electrical permits?October (113 against an average month of 100); August is the quietest (87). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most electrical permits in Tempe?85282, with 362 of the 979 (37%); then 85281 (213).