Contractor Records
Home › Tempe › Plumbing

Plumbing permits in the City of Tempe, AZ

Data through September 2026 · updated 19 Oct 2026

527 plumbing permits were issued in the City of Tempe, October 2024 through September 2026: about 264 a year and 11% of all permits. 254 plumbing permits in the last 12 months (Oct 2025–Sep 2026), 7% fewer than the 273 in the 12 months before. The busiest month is August. The usual one took 41 days from issue to the city's final. 85282 has the most, 152.

527permits issued
254last 12 months
Augbusiest month
41days, usual issue to final
68%finished
$5,000usual declared value
Sep 2026records through

Plumbing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 20Oct2024Nov 2024: 20Dec 2024: 25Jan 2025: 26Jan2025Feb 2025: 24Mar 2025: 29Apr 2025: 24May 2025: 16Jun 2025: 21Jul 2025: 21JulAug 2025: 31Sep 2025: 16Oct 2025: 27Nov 2025: 16Dec 2025: 23Jan 2026: 24Jan2026Feb 2026: 11Mar 2026: 19Apr 2026: 27May 2026: 19Jun 2026: 19Jul 2026: 25JulAug 2026: 26Sep 2026: 18
The same numbers as a table
MonthPermits
Oct 202420
Nov 202420
Dec 202425
Jan 202526
Feb 202524
Mar 202529
Apr 202524
May 202516
Jun 202521
Jul 202521
Aug 202531
Sep 202516
Oct 202527
Nov 202516
Dec 202523
Jan 202624
Feb 202611
Mar 202619
Apr 202627
May 202619
Jun 202619
Jul 202625
Aug 202626
Sep 202618

Download this table (CSV)

When plumbing permits are filed

By calendar month, 100 = an average month (the thin line). August is the busiest (130), September the quietest (77). A busy month at the permit counter usually means a longer wait for a contractor.

January: 114 (100 = an average month)February: 80 (100 = an average month)March: 109 (100 = an average month)April: 116 (100 = an average month)May: 80 (100 = an average month)June: 91 (100 = an average month)July: 105 (100 = an average month)August: 130 (100 = an average month)130September: 77 (100 = an average month)October: 107 (100 = an average month)November: 82 (100 = an average month)December: 109 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January114
February80
March109
April116
May80
June91
July105
August130
September77
October107
November82
December109

Download this table (CSV)

How long a plumbing permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 138 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025273
Finished68.5%
Expired20.5%
Usual days, issue to final41
Middle half, days14–136

Download this table (CSV)

What a plumbing permit is declared at

The value written on the permit at application, from 518 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$5,000
Middle half$2,000–$15,000

Download this table (CSV)

ZIP codes with the most plumbing permits

Counted at the property's ZIP code. Share is the part of the city's 527 plumbing permits.

ZIP codePermitsShare
8528215229%
8528311321%
8528410620%
8528110219%
852885210%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Plumbing - No Value48792%
Additions or Alterations - Residential214%
Miscellaneous(Barns, Sheds, Tennis Courts, etc.)143%
Residential Addition/Alteration/Remodel3under 1%
Renewal of Existing Permit2under 1%

Download this table (CSV)

How Tempe compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Plumbing permits for other places in Phoenix. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Tempe Open Data, Permits Issued by Building Safety (BLDS layer from Accela), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, trade, pool, sign and demolition permits the City of Tempe Building Safety Division issues inside the city limits only. Phoenix, Mesa, Chandler, Scottsdale and unincorporated Maricopa County run their own permit offices and are not in this file. The city's engineering permits (water and sewer, drainage, paving, grading) are left out.

  • The city's open permit file leaves the contractor field blank on building permits, so there are no contractor lists, rankings or firm pages for Tempe.
  • The value is the estimated project cost on the permit; electrical, plumbing and mechanical permits are filed as no-value permits and carry none. It is not a final cost.
  • Kinds of work come from the permit's federal building class; general residential alterations and miscellaneous permits are sorted into trades by keywords in the work description.
  • Few roof replacements appear in the file, so roofing has no page of its own.
  • A final date is the date the city recorded the permit as completed. Permits marked Final, Finaled, CofO Issued or Closed count as finished; some of them carry no completed date and add no days.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Plumbing permits in the City of Tempe, AZ", https://contractorrecords.com/tempe/plumbing-permits, data through September 2026, from the City of Tempe Building Safety Division building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Plumbing permits by month · Plumbing permits by calendar month (index) · Plumbing permits: days to final · Plumbing permits: declared value · Plumbing permits by ZIP code · Plumbing permits by permit type.

Common questions

  • How many plumbing permits does Tempe issue a year?About 264 a year in the City of Tempe: 527 permits issued October 2024 through September 2026, 254 of them in the last 12 months.
  • How long does a plumbing permit take in Tempe?The usual one took 41 days from issue to the city's final inspection, and the middle half took 14 to 136 days (138 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Tempe file the most plumbing permits?August (130 against an average month of 100); September is the quietest (77). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most plumbing permits in Tempe?85282, with 152 of the 527 (29%); then 85283 (113).