Solar permits in the City of Tempe, AZ

Data through September 2026 · updated 19 Oct 2026

361 solar permits were issued in the City of Tempe, October 2024 through September 2026: about 180 a year and 8% of all permits. 164 solar permits in the last 12 months (Oct 2025–Sep 2026), 17% fewer than the 197 in the 12 months before. The busiest month is October. The usual one took 44 days from issue to the city's final. 85282 has the most, 132.

361permits issued
164last 12 months
Octbusiest month
44days, usual issue to final
90%finished
$19,250usual declared value
Sep 2026records through

Solar permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 17Oct2024Nov 2024: 16Dec 2024: 19Jan 2025: 11Jan2025Feb 2025: 15Mar 2025: 10Apr 2025: 18May 2025: 22Jun 2025: 12Jul 2025: 17JulAug 2025: 19Sep 2025: 21Oct 2025: 20Nov 2025: 14Dec 2025: 18Jan 2026: 9Jan2026Feb 2026: 5Mar 2026: 17Apr 2026: 17May 2026: 14Jun 2026: 11Jul 2026: 11JulAug 2026: 14Sep 2026: 14
The same numbers as a table
MonthPermits
Oct 202417
Nov 202416
Dec 202419
Jan 202511
Feb 202515
Mar 202510
Apr 202518
May 202522
Jun 202512
Jul 202517
Aug 202519
Sep 202521
Oct 202520
Nov 202514
Dec 202518
Jan 20269
Feb 20265
Mar 202617
Apr 202617
May 202614
Jun 202611
Jul 202611
Aug 202614
Sep 202614

Download this table (CSV)

When solar permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (123), January the quietest (66). A busy month at the permit counter usually means a longer wait for a contractor.

January: 66 (100 = an average month)February: 66 (100 = an average month)March: 90 (100 = an average month)April: 116 (100 = an average month)May: 120 (100 = an average month)June: 76 (100 = an average month)July: 93 (100 = an average month)August: 110 (100 = an average month)September: 116 (100 = an average month)October: 123 (100 = an average month)123November: 100 (100 = an average month)December: 123 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January66
February66
March90
April116
May120
June76
July93
August110
September116
October123
November100
December123

Download this table (CSV)

How long a solar permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 173 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025197
Finished89.8%
Expired6.1%
Usual days, issue to final44
Middle half, days27–70

Download this table (CSV)

What a solar permit is declared at

The value written on the permit at application, from 357 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$19,250
Middle half$15,000–$29,300

Download this table (CSV)

ZIP codes with the most solar permits

Counted at the property's ZIP code. Share is the part of the city's 361 solar permits.

ZIP codePermitsShare
8528213237%
8528310329%
852847019%
85281329%
85288226%
850401under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Photovoltaic Residential30885%
Electrical - No Value298%
Photovoltaic Commercial175%
Renewal of Existing Permit41%
Additions or Alterations - Residential1under 1%
Other Renewable Green Energy Equipment Commercial1under 1%
Miscellaneous(Barns, Sheds, Tennis Courts, etc.)1under 1%

Download this table (CSV)

How Tempe compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Solar permits for other places in Phoenix. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Tempe Open Data, Permits Issued by Building Safety (BLDS layer from Accela), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, trade, pool, sign and demolition permits the City of Tempe Building Safety Division issues inside the city limits only. Phoenix, Mesa, Chandler, Scottsdale and unincorporated Maricopa County run their own permit offices and are not in this file. The city's engineering permits (water and sewer, drainage, paving, grading) are left out.

  • The city's open permit file leaves the contractor field blank on building permits, so there are no contractor lists, rankings or firm pages for Tempe.
  • The value is the estimated project cost on the permit; electrical, plumbing and mechanical permits are filed as no-value permits and carry none. It is not a final cost.
  • Kinds of work come from the permit's federal building class; general residential alterations and miscellaneous permits are sorted into trades by keywords in the work description.
  • Few roof replacements appear in the file, so roofing has no page of its own.
  • A final date is the date the city recorded the permit as completed. Permits marked Final, Finaled, CofO Issued or Closed count as finished; some of them carry no completed date and add no days.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Solar permits in the City of Tempe, AZ", https://contractorrecords.com/tempe/solar-permits, data through September 2026, from the City of Tempe Building Safety Division building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Solar permits by month · Solar permits by calendar month (index) · Solar permits: days to final · Solar permits: declared value · Solar permits by ZIP code · Solar permits by permit type.

Common questions

  • How many solar permits does Tempe issue a year?About 180 a year in the City of Tempe: 361 permits issued October 2024 through September 2026, 164 of them in the last 12 months.
  • How long does a solar permit take in Tempe?The usual one took 44 days from issue to the city's final inspection, and the middle half took 27 to 70 days (173 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Tempe file the most solar permits?October (123 against an average month of 100); January is the quietest (66). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most solar permits in Tempe?85282, with 132 of the 361 (37%); then 85283 (103).