Contractor Records
Home › Tigard › ZIP 97140

Building permits in 97140, the City of Tigard

Data through September 2026 · updated 20 Oct 2026

283 building permits were issued in ZIP code 97140 by the City of Tigard Building Division, October 2024 through September 2026: 5% of the 5,978 in the City of Tigard, the 3rd busiest ZIP code. Plumbing permits lead with 117. 92 permits in the last 12 months (Oct 2025–Sep 2026), 52% fewer than the 191 in the 12 months before. Permits from a city that runs its own permit office are not counted.

283permits in 97140
92last 12 months
82%for homes
Sep 2026records through

Permits in 97140 by kind of work

Share here is the part of the 283 permits in 97140; citywide is the same for all of the City of Tigard.

Kind of workPermitsShare hereCitywide
Plumbing11741%20%
New homes8530%5%
HVAC4014%25%
Electrical176%30%
Solar93%5%
Garages, sheds & shade structures1under 1%under 1%
Other145%12%

Download this table (CSV)

Permits in 97140 by year

Permits issued in each calendar year of the window.

YearMonthsPermitsPer year
2024 (from October)350200
202512170170
2026 (through September)96384

Download this table (CSV)

How permits in 97140 finish

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

Measure97140Citywide
Permits issued Oct 2024–Sep 20251913,107
Finished90.1%71.2%
Expired8.9%23.8%

Download this table (CSV)

How these numbers are made

Source: City of Tigard, TigardMaps Permitting: All Permits (ArcGIS layer), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Tigard issues inside the city limits only. King City, Beaverton, Lake Oswego, Durham and unincorporated Washington County (such as Bull Mountain outside the city) have their own permit offices and are not in this file.

  • The city's permit layer names no contractor, so there are no contractor lists, rankings or firm pages for Tigard.
  • The layer marks a permit closed but gives no final inspection date, so these pages show which permits finished but not how long they took.
  • Plumbing, mechanical and electrical permits are separate from the building permit for the same job, so one job can count several times.
  • The value is the valuation on the permit, which sets the fee. Trade permits carry none. It is not a final cost.
  • Planning and land-use cases, right-of-way and utility permits, erosion control and code-compliance cases are left out.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Building permits in 97140, the City of Tigard", https://contractorrecords.com/tigard/zip/97140, data through September 2026, from the City of Tigard Building Division building-permit records.

Link to a table: By kind of work · By year · How permits finish.

Download the tables (CSV): Permits in 97140 by kind of work · Permits in 97140 by year · Permits in 97140: finished and days to final.

Common questions

  • How many building permits were issued in 97140?283 permits issued by the city in ZIP code 97140, October 2024 through September 2026: 117 plumbing, 85 new homes, 40 HVAC. 92 were in the last 12 months.
  • What is built most in 97140?Plumbing: 117 of the 283 permits (41%), against 20% citywide.
  • Who did the work in 97140?The city's file doesn't name contractors, so we can't say. Ask a contractor for the permit numbers of past jobs and check them with the city.