New home permits in the Town of Timnath, CO

Data through December 2024 · updated 21 Oct 2026

614 new home permits were issued in the Town of Timnath, January 2023 through December 2024: about 307 a year and 34% of all permits. 288 new home permits in the last 12 months on file (Jan 2024–Dec 2024), 12% fewer than the 326 in the 12 months before. The busiest month is June. The usual one took 196 days from issue to the town's final. 80547 has the most, 393.

614permits issued
288last 12 months on file
Junbusiest month
196days, usual issue to final
99%finished
$357,356usual declared value
Dec 2024records through

New home permits by month

Permits issued each month, January 2023 through December 2024.

Jan 2023: 13Jan2023Feb 2023: 15Mar 2023: 19Apr 2023: 13May 2023: 22Jun 2023: 27Jul 2023: 27JulAug 2023: 38Sep 2023: 45Oct 2023: 45Nov 2023: 13Dec 2023: 49Jan 2024: 35Jan2024Feb 2024: 30Mar 2024: 32Apr 2024: 27May 2024: 28Jun 2024: 38Jul 2024: 24JulAug 2024: 24Sep 2024: 12Oct 2024: 14Nov 2024: 11Dec 2024: 13
The same numbers as a table
MonthPermits
Jan 202313
Feb 202315
Mar 202319
Apr 202313
May 202322
Jun 202327
Jul 202327
Aug 202338
Sep 202345
Oct 202345
Nov 202313
Dec 202349
Jan 202435
Feb 202430
Mar 202432
Apr 202427
May 202428
Jun 202438
Jul 202424
Aug 202424
Sep 202412
Oct 202414
Nov 202411
Dec 202413

Download this table (CSV)

When new home permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (127), November the quietest (47). A busy month at the permit counter usually means a longer wait for a contractor.

January: 94 (100 = an average month)February: 88 (100 = an average month)March: 100 (100 = an average month)April: 78 (100 = an average month)May: 98 (100 = an average month)June: 127 (100 = an average month)127July: 100 (100 = an average month)August: 121 (100 = an average month)September: 111 (100 = an average month)October: 115 (100 = an average month)November: 47 (100 = an average month)December: 121 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January94
February88
March100
April78
May98
June127
July100
August121
September111
October115
November47
December121

Download this table (CSV)

How long a new home permit takes

Permits issued Jan 2023–Dec 2023, at least 12 months before the file ends. Usual days is the middle permit among the 323 with a final date.

MeasureValue
Permits issued Jan 2023–Dec 2023326
Finished99.1%
Expired0.6%
Usual days, issue to final196
Middle half, days160–241

Download this table (CSV)

What a new home permit is declared at

The value written on the permit at application, from 614 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$357,356
Middle half$274,249–$475,486

Download this table (CSV)

ZIP codes with the most new home permits

Counted at the property's ZIP code. Share is the part of the town's 614 new home permits.

ZIP codePermitsShare
8054739364%
8052422136%

Download this table (CSV)

The town's own permit types

How the town filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Detached Single Family46676%
Attached Single Family14824%

Download this table (CSV)

Most active contractors by permits filed

The contractors named on the most new home permits in the Town of Timnath GIS file, January 2023 through December 2024, with 5 or more each. Share is the part of all 614 new home permits; 100% of them name a contractor we can show. This is volume, not quality: more permits doesn't mean better work. Individuals' names, owner-builders and blanks are left out.

ContractorPermitsShare
Calatlantic Homes/Lennar Homes19832%
Hartford Construction, LLC12120%
Toll Brothers, Inc.7813%
Century Communities, Inc.518%
GH Colorado, LLC dba Brightland Homes447%
Trumark Colorado Homes LLC396%
Richmond American Homes335%
Landmark Construction Solutions, Inc.91%
Brannen Design and Construction Inc6under 1%
J Allen Construction Company5under 1%

Download this table (CSV)

Other kinds of work here

How Timnath compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

New home permits for other places in Northern Colorado. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Town of Timnath GIS, Building Permits 2020 through 2024 (ArcGIS layer BP2020thru2024), with the town's 2025 certificates of completion and occupancy, read 21 Oct 2026. We count permits issued January 2023 through December 2024; denied and withdrawn permits are left out.

Building, trade, roofing, solar, fence and demolition permits issued by the Town of Timnath Building Department for property in the town, east of Fort Collins in Larimer County. Fort Collins, Windsor and unincorporated Larimer County run their own permit offices and are not in this file.

  • The town's permit layer is a one-time export covering 2020 through 2024 (last edited January 2025), and the town publishes no permit list for 2025 or later, so the window ends in December 2024.
  • Statuses are as of the January 2025 export. A permit still in progress then that appears on the town's 2025 list of certificates of completion and occupancy counts as finished on its certificate date.
  • Job values are the valuation on the permit. For new homes this is the town's building valuation, not the sale price.
  • Attached single-family homes (townhomes) count as new homes; a few multi-family buildings count as other.
  • Timnath is a small, fast-growing town: about 900 permits a year, a large share of them new homes in new subdivisions, so a few builders account for many permits.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "New home permits in the Town of Timnath, CO", https://contractorrecords.com/timnath/new-home-permits, data through December 2024, from Town of Timnath Building Department building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types · Most active contractors by permits filed.

Download the tables (CSV): New homes permits by month · New homes permits by calendar month (index) · New homes permits: days to final · New homes permits: declared value · New homes permits by ZIP code · New homes permits by permit type · Most active contractors by permits filed.

Common questions

  • How many new home permits does Timnath issue a year?About 307 a year in the Town of Timnath: 614 permits issued January 2023 through December 2024, 288 of them in the last 12 months on file (to December 2024).
  • How long does a new home permit take in Timnath?The usual one took 196 days from issue to the town's final inspection, and the middle half took 160 to 241 days (323 permits issued Jan 2023–Dec 2023 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Timnath file the most new home permits?June (127 against an average month of 100); November is the quietest (47). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most new home permits in Timnath?80547, with 393 of the 614 (64%); then 80524 (221).