Contractor Records
Home › Wichita › Garages, sheds & shade structures

Garage, shed and shade structure permits in the City of Wichita, KS

Data through September 2026 · updated 19 Oct 2026

367 garage, shed and shade structure permits were issued in the City of Wichita, October 2024 through September 2026: about 184 a year and under 1% of all permits. 215 garage, shed and shade structure permits in the last 12 months (Oct 2025–Sep 2026), 41% more than the 152 in the 12 months before. The busiest month is April. 67204 has the most, 55.

367permits issued
215last 12 months
Aprbusiest month
95%finished
$18,000usual declared value
Sep 2026records through

Garage, shed and shade structure permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 19Oct2024Nov 2024: 11Dec 2024: 6Jan 2025: 1Jan2025Feb 2025: 8Mar 2025: 11Apr 2025: 25May 2025: 15Jun 2025: 16Jul 2025: 12JulAug 2025: 16Sep 2025: 12Oct 2025: 10Nov 2025: 15Dec 2025: 9Jan 2026: 8Jan2026Feb 2026: 13Mar 2026: 22Apr 2026: 26May 2026: 21Jun 2026: 25Jul 2026: 23JulAug 2026: 23Sep 2026: 20
The same numbers as a table
MonthPermits
Oct 202419
Nov 202411
Dec 20246
Jan 20251
Feb 20258
Mar 202511
Apr 202525
May 202515
Jun 202516
Jul 202512
Aug 202516
Sep 202512
Oct 202510
Nov 202515
Dec 20259
Jan 20268
Feb 202613
Mar 202622
Apr 202626
May 202621
Jun 202625
Jul 202623
Aug 202623
Sep 202620

Download this table (CSV)

When garage, shed and shade structure permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (167), January the quietest (29). A busy month at the permit counter usually means a longer wait for a contractor.

January: 29 (100 = an average month)February: 69 (100 = an average month)March: 108 (100 = an average month)April: 167 (100 = an average month)167May: 118 (100 = an average month)June: 134 (100 = an average month)July: 114 (100 = an average month)August: 128 (100 = an average month)September: 105 (100 = an average month)October: 95 (100 = an average month)November: 85 (100 = an average month)December: 49 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January29
February69
March108
April167
May118
June134
July114
August128
September105
October95
November85
December49

Download this table (CSV)

How many garage, shed and shade structure permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025152
Finished95.4%
Expired0.7%

Download this table (CSV)

What a garage, shed and shade structure permit is declared at

The value written on the permit at application, from 359 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$18,000
Middle half$9,500–$35,000

Download this table (CSV)

ZIP codes with the most garage, shed and shade structure permits

Counted at the property's ZIP code. Share is the part of the city's 367 garage, shed and shade structure permits.

ZIP codePermitsShare
672045515%
67217339%
67212339%
67203247%
67208216%
67214205%
67213195%
67209185%
67235144%
67230134%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Building (Det Garage)18350%
Building (Shed)4813%
Building (Pole Barn)4813%
Building (Carport)4412%
Building (Gazeb)216%
Building (Poolhouse)164%
Location (Shed)72%

Download this table (CSV)

How these numbers are made

Source: City of Wichita GIS: MABCD Permits SDE (MISC/MABCD MapServer layer 1), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the Metropolitan Area Building and Construction Department (MABCD) issues for property inside the City of Wichita: building, roofing and siding, electrical, mechanical, plumbing and sewer, demolition (wrecking), manufactured-home, sign and fire-system permits. MABCD also issues permits for unincorporated Sedgwick County and several small cities (Maize, Goddard, Mulvane and others); those are in the same file but not counted here. Plan review applications, well permits and flood-plain permits are not counted.

  • The file names no contractor, so there are no contractor lists, rankings or firm pages for Wichita.
  • The file has no issue date, so permits are dated by their application date; applications MABCD had not yet issued are left out.
  • The file has no final inspection date, so we show no time to final. A permit counts as finished when MABCD marks it closed.
  • Roofing permits roughly tripled from September 2025 and stayed high into 2026; the file does not say why.
  • The declared value is filled on building and most roofing permits; electrical, mechanical and plumbing permits carry no job value.
  • Homes are permits whose occupancy is a one- or two-family dwelling or a home's garage, shed or other accessory building; apartment buildings count as other.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Garage, shed and shade structure permits in the City of Wichita, KS", https://contractorrecords.com/wichita/accessory-permits, data through September 2026, from Metropolitan Area Building and Construction Department (City of Wichita and Sedgwick County) building-permit records.

Link to a table: By month · Season · How many get finished · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Garages, sheds & shade structures permits by month · Garages, sheds & shade structures permits by calendar month (index) · Garages, sheds & shade structures permits: finished share · Garages, sheds & shade structures permits: declared value · Garages, sheds & shade structures permits by ZIP code · Garages, sheds & shade structures permits by permit type.

Common questions

  • How many garage, shed and shade structure permits does Wichita issue a year?About 184 a year in the City of Wichita: 367 permits issued October 2024 through September 2026, 215 of them in the last 12 months.
  • When do people in Wichita file the most garage, shed and shade structure permits?April (167 against an average month of 100); January is the quietest (29). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most garage, shed and shade structure permits in Wichita?67204, with 55 of the 367 (15%); then 67217 (33).