Data through September 2026 · updated 19 Oct 2026
8,393 electrical permits were issued in the City of Wichita, October 2024 through September 2026: about 4,196 a year and 15% of all permits. 4,278 electrical permits in the last 12 months (Oct 2025–Sep 2026), 4% more than the 4,115 in the 12 months before. The busiest month is June. 67203 has the most, 665.
Permits issued each month, October 2024 through September 2026.
| Month | Permits |
|---|---|
| Oct 2024 | 347 |
| Nov 2024 | 352 |
| Dec 2024 | 286 |
| Jan 2025 | 266 |
| Feb 2025 | 234 |
| Mar 2025 | 345 |
| Apr 2025 | 383 |
| May 2025 | 392 |
| Jun 2025 | 461 |
| Jul 2025 | 403 |
| Aug 2025 | 326 |
| Sep 2025 | 320 |
| Oct 2025 | 324 |
| Nov 2025 | 304 |
| Dec 2025 | 297 |
| Jan 2026 | 300 |
| Feb 2026 | 317 |
| Mar 2026 | 396 |
| Apr 2026 | 407 |
| May 2026 | 347 |
| Jun 2026 | 384 |
| Jul 2026 | 372 |
| Aug 2026 | 419 |
| Sep 2026 | 411 |
By calendar month, 100 = an average month (the thin line). June is the busiest (121), February the quietest (79). A busy month at the permit counter usually means a longer wait for a contractor.
| Month | Index |
|---|---|
| January | 81 |
| February | 79 |
| March | 106 |
| April | 113 |
| May | 106 |
| June | 121 |
| July | 111 |
| August | 107 |
| September | 105 |
| October | 96 |
| November | 94 |
| December | 83 |
Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.
| Measure | Value |
|---|---|
| Permits issued Oct 2024–Sep 2025 | 4,115 |
| Finished | 99.6% |
| Expired | 0.0% |
Counted at the property's ZIP code. Share is the part of the city's 8,393 electrical permits.
How the city filed these permits. We group its types into kinds of work; this is the split.
| Permit type | Permits | Share |
|---|---|---|
| Electrical (Repair) | 5,942 | 71% |
| Electrical (Remodel) | 1,083 | 13% |
| Electrical (New) | 962 | 11% |
| Electrical (Addition) | 324 | 4% |
| Electrical (Tenant Fin) | 72 | under 1% |
| Electrical (Bsmt Finsh) | 10 | under 1% |
Roofing (18,740)Plumbing (11,195)HVAC (5,956)Remodels & repairs (2,775)New homes (2,446)Additions (869)Garages, sheds & shade structures (367)Demolition (271)
From our cross-city data studies: the same measure, read the same way, for every city we cover.
Source: City of Wichita GIS: MABCD Permits SDE (MISC/MABCD MapServer layer 1), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.
Permits the Metropolitan Area Building and Construction Department (MABCD) issues for property inside the City of Wichita: building, roofing and siding, electrical, mechanical, plumbing and sewer, demolition (wrecking), manufactured-home, sign and fire-system permits. MABCD also issues permits for unincorporated Sedgwick County and several small cities (Maize, Goddard, Mulvane and others); those are in the same file but not counted here. Plan review applications, well permits and flood-plain permits are not counted.
Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →
Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:
Contractor Records, "Electrical permits in the City of Wichita, KS", https://contractorrecords.com/wichita/electrical-permits, data through September 2026, from Metropolitan Area Building and Construction Department (City of Wichita and Sedgwick County) building-permit records.Link to a table: By month · Season · How many get finished · By ZIP code · Permit types.
Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: finished share · Electrical permits by ZIP code · Electrical permits by permit type.