Data through September 2026 · updated 19 Oct 2026
11,195 plumbing permits were issued in the City of Wichita, October 2024 through September 2026: about 5,598 a year and 21% of all permits. 6,037 plumbing permits in the last 12 months (Oct 2025–Sep 2026), 17% more than the 5,158 in the 12 months before. The busiest month is March. 67212 has the most, 756.
Permits issued each month, October 2024 through September 2026.
| Month | Permits |
|---|---|
| Oct 2024 | 474 |
| Nov 2024 | 331 |
| Dec 2024 | 446 |
| Jan 2025 | 375 |
| Feb 2025 | 441 |
| Mar 2025 | 555 |
| Apr 2025 | 464 |
| May 2025 | 419 |
| Jun 2025 | 410 |
| Jul 2025 | 412 |
| Aug 2025 | 426 |
| Sep 2025 | 405 |
| Oct 2025 | 501 |
| Nov 2025 | 338 |
| Dec 2025 | 460 |
| Jan 2026 | 444 |
| Feb 2026 | 427 |
| Mar 2026 | 585 |
| Apr 2026 | 564 |
| May 2026 | 528 |
| Jun 2026 | 534 |
| Jul 2026 | 591 |
| Aug 2026 | 530 |
| Sep 2026 | 535 |
By calendar month, 100 = an average month (the thin line). March is the busiest (122), November the quietest (72). A busy month at the permit counter usually means a longer wait for a contractor.
| Month | Index |
|---|---|
| January | 88 |
| February | 93 |
| March | 122 |
| April | 110 |
| May | 102 |
| June | 101 |
| July | 108 |
| August | 102 |
| September | 101 |
| October | 105 |
| November | 72 |
| December | 97 |
Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.
| Measure | Value |
|---|---|
| Permits issued Oct 2024–Sep 2025 | 5,158 |
| Finished | 99.9% |
| Expired | 0.0% |
Counted at the property's ZIP code. Share is the part of the city's 11,195 plumbing permits.
How the city filed these permits. We group its types into kinds of work; this is the split.
| Permit type | Permits | Share |
|---|---|---|
| Plumbing (Repair) | 4,130 | 37% |
| Sewer (New) | 3,267 | 29% |
| Sewer (Replace) | 1,121 | 10% |
| Plumbing (New) | 706 | 6% |
| Plumbing (Remodel) | 580 | 5% |
| Sewer (Repair) | 564 | 5% |
| Sewer (Cleanout) | 375 | 3% |
| Sewer (Seal Off) | 207 | 2% |
| Plumbing (Addition) | 84 | under 1% |
| Plumbing (Tenant Fin) | 68 | under 1% |
Roofing (18,740)Electrical (8,393)HVAC (5,956)Remodels & repairs (2,775)New homes (2,446)Additions (869)Garages, sheds & shade structures (367)Demolition (271)
From our cross-city data studies: the same measure, read the same way, for every city we cover.
Source: City of Wichita GIS: MABCD Permits SDE (MISC/MABCD MapServer layer 1), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.
Permits the Metropolitan Area Building and Construction Department (MABCD) issues for property inside the City of Wichita: building, roofing and siding, electrical, mechanical, plumbing and sewer, demolition (wrecking), manufactured-home, sign and fire-system permits. MABCD also issues permits for unincorporated Sedgwick County and several small cities (Maize, Goddard, Mulvane and others); those are in the same file but not counted here. Plan review applications, well permits and flood-plain permits are not counted.
Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →
Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:
Contractor Records, "Plumbing permits in the City of Wichita, KS", https://contractorrecords.com/wichita/plumbing-permits, data through September 2026, from Metropolitan Area Building and Construction Department (City of Wichita and Sedgwick County) building-permit records.Link to a table: By month · Season · How many get finished · By ZIP code · Permit types.
Download the tables (CSV): Plumbing permits by month · Plumbing permits by calendar month (index) · Plumbing permits: finished share · Plumbing permits by ZIP code · Plumbing permits by permit type.