Data through September 2026 · updated 19 Oct 2026
5,956 HVAC permits were issued in the City of Wichita, October 2024 through September 2026: about 2,978 a year and 11% of all permits. 3,018 HVAC permits in the last 12 months (Oct 2025–Sep 2026), 3% more than the 2,938 in the 12 months before. The busiest month is July. 67212 has the most, 669.
Permits issued each month, October 2024 through September 2026.
| Month | Permits |
|---|---|
| Oct 2024 | 225 |
| Nov 2024 | 191 |
| Dec 2024 | 173 |
| Jan 2025 | 179 |
| Feb 2025 | 165 |
| Mar 2025 | 225 |
| Apr 2025 | 280 |
| May 2025 | 303 |
| Jun 2025 | 326 |
| Jul 2025 | 364 |
| Aug 2025 | 296 |
| Sep 2025 | 211 |
| Oct 2025 | 202 |
| Nov 2025 | 166 |
| Dec 2025 | 147 |
| Jan 2026 | 147 |
| Feb 2026 | 173 |
| Mar 2026 | 249 |
| Apr 2026 | 321 |
| May 2026 | 301 |
| Jun 2026 | 321 |
| Jul 2026 | 383 |
| Aug 2026 | 311 |
| Sep 2026 | 297 |
By calendar month, 100 = an average month (the thin line). July is the busiest (151), December the quietest (64). A busy month at the permit counter usually means a longer wait for a contractor.
| Month | Index |
|---|---|
| January | 66 |
| February | 68 |
| March | 96 |
| April | 121 |
| May | 122 |
| June | 130 |
| July | 151 |
| August | 122 |
| September | 102 |
| October | 86 |
| November | 72 |
| December | 64 |
Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.
| Measure | Value |
|---|---|
| Permits issued Oct 2024–Sep 2025 | 2,938 |
| Finished | 99.4% |
| Expired | 0.2% |
Counted at the property's ZIP code. Share is the part of the city's 5,956 HVAC permits.
How the city filed these permits. We group its types into kinds of work; this is the split.
| Permit type | Permits | Share |
|---|---|---|
| Mechanical (Repair) | 4,246 | 71% |
| Mechanical (Remodel) | 1,283 | 22% |
| Mechanical (New) | 317 | 5% |
| Mechanical (Tenant Fin) | 71 | 1% |
| Mechanical (Addition) | 39 | under 1% |
Roofing (18,740)Plumbing (11,195)Electrical (8,393)Remodels & repairs (2,775)New homes (2,446)Additions (869)Garages, sheds & shade structures (367)Demolition (271)
From our cross-city data studies: the same measure, read the same way, for every city we cover.
Source: City of Wichita GIS: MABCD Permits SDE (MISC/MABCD MapServer layer 1), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.
Permits the Metropolitan Area Building and Construction Department (MABCD) issues for property inside the City of Wichita: building, roofing and siding, electrical, mechanical, plumbing and sewer, demolition (wrecking), manufactured-home, sign and fire-system permits. MABCD also issues permits for unincorporated Sedgwick County and several small cities (Maize, Goddard, Mulvane and others); those are in the same file but not counted here. Plan review applications, well permits and flood-plain permits are not counted.
Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →
Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:
Contractor Records, "HVAC permits in the City of Wichita, KS", https://contractorrecords.com/wichita/hvac-permits, data through September 2026, from Metropolitan Area Building and Construction Department (City of Wichita and Sedgwick County) building-permit records.Link to a table: By month · Season · How many get finished · By ZIP code · Permit types.
Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index) · HVAC permits: finished share · HVAC permits by ZIP code · HVAC permits by permit type.