New home permits in unincorporated Alachua County, FL

Data through September 2026 · updated 20 Oct 2026

834 new home permits were issued in unincorporated Alachua County, October 2024 through September 2026: about 417 a year and 5% of all permits. 487 new home permits in the last 12 months (Oct 2025–Sep 2026), 40% more than the 347 in the 12 months before. The busiest month is August. The usual one took 194 days from issue to the county's final. 32669 has the most, 193.

834permits issued
487last 12 months
Augbusiest month
194days, usual issue to final
86%finished
Sep 2026records through

New home permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 31Oct2024Nov 2024: 37Dec 2024: 30Jan 2025: 36Jan2025Feb 2025: 24Mar 2025: 30Apr 2025: 30May 2025: 23Jun 2025: 32Jul 2025: 23JulAug 2025: 37Sep 2025: 14Oct 2025: 35Nov 2025: 31Dec 2025: 52Jan 2026: 33Jan2026Feb 2026: 62Mar 2026: 39Apr 2026: 36May 2026: 23Jun 2026: 35Jul 2026: 67JulAug 2026: 55Sep 2026: 19
The same numbers as a table
MonthPermits
Oct 202431
Nov 202437
Dec 202430
Jan 202536
Feb 202524
Mar 202530
Apr 202530
May 202523
Jun 202532
Jul 202523
Aug 202537
Sep 202514
Oct 202535
Nov 202531
Dec 202552
Jan 202633
Feb 202662
Mar 202639
Apr 202636
May 202623
Jun 202635
Jul 202667
Aug 202655
Sep 202619

Download this table (CSV)

When new home permits are filed

By calendar month, 100 = an average month (the thin line). August is the busiest (132), September the quietest (47). A busy month at the permit counter usually means a longer wait for a contractor.

January: 99 (100 = an average month)February: 124 (100 = an average month)March: 99 (100 = an average month)April: 95 (100 = an average month)May: 66 (100 = an average month)June: 96 (100 = an average month)July: 129 (100 = an average month)August: 132 (100 = an average month)132September: 47 (100 = an average month)October: 95 (100 = an average month)November: 98 (100 = an average month)December: 118 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January99
February124
March99
April95
May66
June96
July129
August132
September47
October95
November98
December118

Download this table (CSV)

How long a new home permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 296 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025347
Finished85.9%
Expired3.5%
Usual days, issue to final194
Middle half, days132–267

Download this table (CSV)

ZIP codes with the most new home permits

Counted at the property's ZIP code. Share is the part of the county's 834 new home permits.

ZIP codePermitsShare
3266919323%
3260615719%
3260815619%
32618617%
32615567%
32640415%
32609283%
32607273%
32667253%
32641243%

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Building Permit / New Construction69483%
Building Permit / Manufactured Home (HUD)13516%
Building Permit / Modular Structure5under 1%

Download this table (CSV)

How Alachua County compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

New home permits for other places in Gainesville. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Alachua County Growth Management, CitizenServe building permits (ArcGIS: BuildingPermitsCS), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the Alachua County Building Division issues for unincorporated land only, plus the small towns that contract with the county for building services. Gainesville, Alachua, High Springs and Newberry run their own permit offices and are not in this file; Gainesville has its own page on this site.

  • The county's file lists the company that pulled each permit, but this page shows permit counts only: there are no contractor lists, rankings or firm pages for this county.
  • The file has no declared job value, so we show no costs.
  • A final date is the county's close date on a permit marked Closed, Complete or Finaled. Permits closed after expiring or closed administratively count as expired.
  • The file has no homes-versus-other flag, so a permit counts as a home when its parcel's Florida property-use code is residential (single-family, mobile home, condo or small multifamily). The ZIP code also comes from the parcel.
  • Window and door replacements are counted under remodels and repairs.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "New home permits in unincorporated Alachua County, FL", https://contractorrecords.com/alachua-county/new-home-permits, data through September 2026, from Alachua County Growth Management building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): New homes permits by month · New homes permits by calendar month (index) · New homes permits: days to final · New homes permits by ZIP code · New homes permits by permit type.

Common questions

  • How many new home permits does Alachua County issue a year?About 417 a year in unincorporated Alachua County: 834 permits issued October 2024 through September 2026, 487 of them in the last 12 months.
  • How long does a new home permit take in Alachua County?The usual one took 194 days from issue to the county's final inspection, and the middle half took 132 to 267 days (296 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Alachua County file the most new home permits?August (132 against an average month of 100); September is the quietest (47). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most new home permits in Alachua County?32669, with 193 of the 834 (23%); then 32606 (157).