Contractor Records
Home › Centennial › ZIP 80015

Building permits in 80015, the City of Centennial

Data through September 2026 · updated 20 Oct 2026

2,807 building permits were issued in ZIP code 80015 by the City of Centennial Building Services, October 2024 through September 2026: 21% of the 13,474 in the City of Centennial, the 3rd busiest ZIP code. Roofing permits lead with 921. 1,229 permits in the last 12 months (Oct 2025–Sep 2026), 22% fewer than the 1,578 in the 12 months before. Permits from a city that runs its own permit office are not counted.

2,807permits in 80015
1,229last 12 months
95%for homes
35days, usual issue to final
Sep 2026records through

Permits in 80015 by kind of work

Share here is the part of the 2,807 permits in 80015; citywide is the same for all of the City of Centennial.

Kind of workPermitsShare hereCitywide
Roofing92133%19%
Remodels & repairs63823%23%
HVAC41515%15%
Plumbing35213%16%
Electrical2138%9%
Solar1054%3%
Garages, sheds & shade structures381%2%
Fences & walls291%2%
Demolition6under 1%under 1%
Additions3under 1%under 1%
Pools & spas3under 1%under 1%
Other843%8%

Download this table (CSV)

Permits in 80015 by year

Permits issued in each calendar year of the window.

YearMonthsPermitsPer year
2024 (from October)35222,088
2025121,3361,336
2026 (through September)99491,265

Download this table (CSV)

How permits in 80015 finish

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

Measure80015Citywide
Permits issued Oct 2024–Sep 20251,5787,105
Finished81.9%82.6%
Expired17.6%16.2%
Usual days, issue to final3536

Download this table (CSV)

How these numbers are made

Source: City of Centennial ArcGIS Server, EPL_Permit (EnerGov permit table), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, trade, fence and sign permits the City of Centennial issues inside the city limits only. Homes with a Centennial mailing address in unincorporated Arapahoe County, and the neighbouring cities of Greenwood Village, Littleton, Englewood, Lone Tree and Aurora, get their permits elsewhere and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Centennial.
  • The value is the valuation declared on the permit, which sets the fee. Many over-the-counter home permits list none or a nominal figure, so values are a guide, not a cost.
  • Hailstorms drive roofing: a storm season can double a month's permits, so roofing counts swing from year to year.
  • The city's broad 'Misc' class (EV circuits, sewer repairs, furnace swaps, siding) is sorted into trades from the short work description; anything left is a remodel or repair.
  • Homes are permits the city files as residential. Multi-family buildings and commercial work count as other.
  • A final date is the date the permit was finaled. Right-of-way, temporary use and development permits are left out.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Building permits in 80015, the City of Centennial", https://contractorrecords.com/centennial/zip/80015, data through September 2026, from the City of Centennial Building Services building-permit records.

Link to a table: By kind of work · By year · How permits finish.

Download the tables (CSV): Permits in 80015 by kind of work · Permits in 80015 by year · Permits in 80015: finished and days to final.

Common questions

  • How many building permits were issued in 80015?2,807 permits issued by the city in ZIP code 80015, October 2024 through September 2026: 921 roofing, 638 remodels & repairs, 415 HVAC. 1,229 were in the last 12 months.
  • What is built most in 80015?Roofing: 921 of the 2,807 permits (33%), against 19% citywide.
  • How long does a permit take in 80015?The usual permit issued here Oct 2024–Sep 2025 took 35 days from issue to final (1,291 permits with a final date), against 36 days citywide.
  • Who did the work in 80015?The city's file doesn't name contractors, so we can't say. Ask a contractor for the permit numbers of past jobs and check them with the city.