Contractor Records
Home › Centennial › Solar

Solar permits in the City of Centennial, CO

Data through September 2026 · updated 20 Oct 2026

396 solar permits were issued in the City of Centennial, October 2024 through September 2026: about 198 a year and 3% of all permits. 122 solar permits in the last 12 months (Oct 2025–Sep 2026), 55% fewer than the 274 in the 12 months before. The busiest month is October. The usual one took 62 days from issue to the city's final. 80122 has the most, 107.

396permits issued
122last 12 months
Octbusiest month
62days, usual issue to final
92%finished
$13,634usual declared value
Sep 2026records through

Solar permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 37Oct2024Nov 2024: 21Dec 2024: 24Jan 2025: 20Jan2025Feb 2025: 13Mar 2025: 19Apr 2025: 19May 2025: 21Jun 2025: 20Jul 2025: 30JulAug 2025: 27Sep 2025: 23Oct 2025: 21Nov 2025: 8Dec 2025: 5Jan 2026: 4Jan2026Feb 2026: 9Mar 2026: 8Apr 2026: 10May 2026: 11Jun 2026: 8Jul 2026: 16JulAug 2026: 11Sep 2026: 11
The same numbers as a table
MonthPermits
Oct 202437
Nov 202421
Dec 202424
Jan 202520
Feb 202513
Mar 202519
Apr 202519
May 202521
Jun 202520
Jul 202530
Aug 202527
Sep 202523
Oct 202521
Nov 20258
Dec 20255
Jan 20264
Feb 20269
Mar 20268
Apr 202610
May 202611
Jun 20268
Jul 202616
Aug 202611
Sep 202611

Download this table (CSV)

When solar permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (176), February the quietest (67). A busy month at the permit counter usually means a longer wait for a contractor.

January: 73 (100 = an average month)February: 67 (100 = an average month)March: 82 (100 = an average month)April: 88 (100 = an average month)May: 97 (100 = an average month)June: 85 (100 = an average month)July: 139 (100 = an average month)August: 115 (100 = an average month)September: 103 (100 = an average month)October: 176 (100 = an average month)176November: 88 (100 = an average month)December: 88 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January73
February67
March82
April88
May97
June85
July139
August115
September103
October176
November88
December88

Download this table (CSV)

How long a solar permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 251 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025274
Finished91.6%
Expired7.7%
Usual days, issue to final62
Middle half, days36–106

Download this table (CSV)

What a solar permit is declared at

The value written on the permit at application, from 396 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$13,634
Middle half$4,214–$24,688

Download this table (CSV)

ZIP codes with the most solar permits

Counted at the property's ZIP code. Share is the part of the city's 396 solar permits.

ZIP codePermitsShare
8012210727%
8001510527%
801127318%
801215614%
800163810%
80111174%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Renewable Energy28572%
Misc11128%

Download this table (CSV)

How Centennial compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Solar permits for other places in Denver and Boulder. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Centennial ArcGIS Server, EPL_Permit (EnerGov permit table), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, trade, fence and sign permits the City of Centennial issues inside the city limits only. Homes with a Centennial mailing address in unincorporated Arapahoe County, and the neighbouring cities of Greenwood Village, Littleton, Englewood, Lone Tree and Aurora, get their permits elsewhere and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Centennial.
  • The value is the valuation declared on the permit, which sets the fee. Many over-the-counter home permits list none or a nominal figure, so values are a guide, not a cost.
  • Hailstorms drive roofing: a storm season can double a month's permits, so roofing counts swing from year to year.
  • The city's broad 'Misc' class (EV circuits, sewer repairs, furnace swaps, siding) is sorted into trades from the short work description; anything left is a remodel or repair.
  • Homes are permits the city files as residential. Multi-family buildings and commercial work count as other.
  • A final date is the date the permit was finaled. Right-of-way, temporary use and development permits are left out.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Solar permits in the City of Centennial, CO", https://contractorrecords.com/centennial/solar-permits, data through September 2026, from the City of Centennial Building Services building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Solar permits by month · Solar permits by calendar month (index) · Solar permits: days to final · Solar permits: declared value · Solar permits by ZIP code · Solar permits by permit type.

Common questions

  • How many solar permits does Centennial issue a year?About 198 a year in the City of Centennial: 396 permits issued October 2024 through September 2026, 122 of them in the last 12 months.
  • How long does a solar permit take in Centennial?The usual one took 62 days from issue to the city's final inspection, and the middle half took 36 to 106 days (251 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Centennial file the most solar permits?October (176 against an average month of 100); February is the quietest (67). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most solar permits in Centennial?80122, with 107 of the 396 (27%); then 80015 (105).