Plumbing permits in the City of Centennial, CO

Data through September 2026 · updated 20 Oct 2026

2,214 plumbing permits were issued in the City of Centennial, October 2024 through September 2026: about 1,107 a year and 16% of all permits. 1,144 plumbing permits in the last 12 months (Oct 2025–Sep 2026), 7% more than the 1,070 in the 12 months before. The busiest month is January. The usual one took 8 days from issue to the city's final. 80122 has the most, 716.

2,214permits issued
1,144last 12 months
Janbusiest month
8days, usual issue to final
78%finished
$3,463usual declared value
Sep 2026records through

Plumbing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 104Oct2024Nov 2024: 68Dec 2024: 70Jan 2025: 95Jan2025Feb 2025: 88Mar 2025: 102Apr 2025: 81May 2025: 92Jun 2025: 100Jul 2025: 88JulAug 2025: 90Sep 2025: 92Oct 2025: 105Nov 2025: 100Dec 2025: 88Jan 2026: 116Jan2026Feb 2026: 84Mar 2026: 90Apr 2026: 98May 2026: 81Jun 2026: 91Jul 2026: 94JulAug 2026: 84Sep 2026: 113
The same numbers as a table
MonthPermits
Oct 2024104
Nov 202468
Dec 202470
Jan 202595
Feb 202588
Mar 2025102
Apr 202581
May 202592
Jun 2025100
Jul 202588
Aug 202590
Sep 202592
Oct 2025105
Nov 2025100
Dec 202588
Jan 2026116
Feb 202684
Mar 202690
Apr 202698
May 202681
Jun 202691
Jul 202694
Aug 202684
Sep 2026113

Download this table (CSV)

When plumbing permits are filed

By calendar month, 100 = an average month (the thin line). January is the busiest (114), December the quietest (86). A busy month at the permit counter usually means a longer wait for a contractor.

January: 114 (100 = an average month)114February: 93 (100 = an average month)March: 104 (100 = an average month)April: 97 (100 = an average month)May: 94 (100 = an average month)June: 104 (100 = an average month)July: 99 (100 = an average month)August: 94 (100 = an average month)September: 111 (100 = an average month)October: 113 (100 = an average month)November: 91 (100 = an average month)December: 86 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January114
February93
March104
April97
May94
June104
July99
August94
September111
October113
November91
December86

Download this table (CSV)

How long a plumbing permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 832 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20251,070
Finished77.8%
Expired22.0%
Usual days, issue to final8
Middle half, days3–29

Download this table (CSV)

What a plumbing permit is declared at

The value written on the permit at application, from 2,213 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$3,463
Middle half$2,310–$5,506

Download this table (CSV)

ZIP codes with the most plumbing permits

Counted at the property's ZIP code. Share is the part of the city's 2,214 plumbing permits.

ZIP codePermitsShare
8012271632%
8011254525%
8001535216%
8012135016%
801111497%
800161025%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Water Heater1,06948%
Misc73033%
Sewer Line Repair31914%
AC/Water Heater/Furnace392%
Tankless Water Heater311%
Gas Line261%

Download this table (CSV)

How Centennial compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Plumbing permits for other places in Denver and Boulder. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Centennial ArcGIS Server, EPL_Permit (EnerGov permit table), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, trade, fence and sign permits the City of Centennial issues inside the city limits only. Homes with a Centennial mailing address in unincorporated Arapahoe County, and the neighbouring cities of Greenwood Village, Littleton, Englewood, Lone Tree and Aurora, get their permits elsewhere and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Centennial.
  • The value is the valuation declared on the permit, which sets the fee. Many over-the-counter home permits list none or a nominal figure, so values are a guide, not a cost.
  • Hailstorms drive roofing: a storm season can double a month's permits, so roofing counts swing from year to year.
  • The city's broad 'Misc' class (EV circuits, sewer repairs, furnace swaps, siding) is sorted into trades from the short work description; anything left is a remodel or repair.
  • Homes are permits the city files as residential. Multi-family buildings and commercial work count as other.
  • A final date is the date the permit was finaled. Right-of-way, temporary use and development permits are left out.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Plumbing permits in the City of Centennial, CO", https://contractorrecords.com/centennial/plumbing-permits, data through September 2026, from the City of Centennial Building Services building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Plumbing permits by month · Plumbing permits by calendar month (index) · Plumbing permits: days to final · Plumbing permits: declared value · Plumbing permits by ZIP code · Plumbing permits by permit type.

Common questions

  • How many plumbing permits does Centennial issue a year?About 1,107 a year in the City of Centennial: 2,214 permits issued October 2024 through September 2026, 1,144 of them in the last 12 months.
  • How long does a plumbing permit take in Centennial?The usual one took 8 days from issue to the city's final inspection, and the middle half took 3 to 29 days (832 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Centennial file the most plumbing permits?January (114 against an average month of 100); December is the quietest (86). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most plumbing permits in Centennial?80122, with 716 of the 2,214 (32%); then 80112 (545).