Roofing permits in the City of Centennial, CO

Data through September 2026 · updated 20 Oct 2026

2,544 roofing permits were issued in the City of Centennial, October 2024 through September 2026: about 1,272 a year and 19% of all permits. 872 roofing permits in the last 12 months (Oct 2025–Sep 2026), 48% fewer than the 1,672 in the 12 months before. The busiest month is October. The usual one took 37 days from issue to the city's final. 80015 has the most, 921.

2,544permits issued
872last 12 months
Octbusiest month
37days, usual issue to final
88%finished
$13,800usual declared value
Sep 2026records through

Roofing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 329Oct2024Nov 2024: 321Dec 2024: 98Jan 2025: 72Jan2025Feb 2025: 74Mar 2025: 112Apr 2025: 145May 2025: 124Jun 2025: 113Jul 2025: 103JulAug 2025: 89Sep 2025: 92Oct 2025: 76Nov 2025: 64Dec 2025: 30Jan 2026: 29Jan2026Feb 2026: 51Mar 2026: 63Apr 2026: 52May 2026: 60Jun 2026: 78Jul 2026: 60JulAug 2026: 127Sep 2026: 182
The same numbers as a table
MonthPermits
Oct 2024329
Nov 2024321
Dec 202498
Jan 202572
Feb 202574
Mar 2025112
Apr 2025145
May 2025124
Jun 2025113
Jul 2025103
Aug 202589
Sep 202592
Oct 202576
Nov 202564
Dec 202530
Jan 202629
Feb 202651
Mar 202663
Apr 202652
May 202660
Jun 202678
Jul 202660
Aug 2026127
Sep 2026182

Download this table (CSV)

When roofing permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (191), January the quietest (48). A busy month at the permit counter usually means a longer wait for a contractor.

January: 48 (100 = an average month)February: 59 (100 = an average month)March: 83 (100 = an average month)April: 93 (100 = an average month)May: 87 (100 = an average month)June: 90 (100 = an average month)July: 77 (100 = an average month)August: 102 (100 = an average month)September: 129 (100 = an average month)October: 191 (100 = an average month)191November: 182 (100 = an average month)December: 60 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January48
February59
March83
April93
May87
June90
July77
August102
September129
October191
November182
December60

Download this table (CSV)

How long a roofing permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 1,470 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20251,672
Finished88.0%
Expired11.7%
Usual days, issue to final37
Middle half, days19–91

Download this table (CSV)

What a roofing permit is declared at

The value written on the permit at application, from 2,544 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$13,800
Middle half$9,889–$19,282

Download this table (CSV)

ZIP codes with the most roofing permits

Counted at the property's ZIP code. Share is the part of the city's 2,544 roofing permits.

ZIP codePermitsShare
8001592136%
8012248519%
8001633213%
8011131412%
8011225110%
801212419%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Roof/Re-roof2,53199%
Misc13under 1%

Download this table (CSV)

How Centennial compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Roofing permits for other places in Denver and Boulder. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Centennial ArcGIS Server, EPL_Permit (EnerGov permit table), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, trade, fence and sign permits the City of Centennial issues inside the city limits only. Homes with a Centennial mailing address in unincorporated Arapahoe County, and the neighbouring cities of Greenwood Village, Littleton, Englewood, Lone Tree and Aurora, get their permits elsewhere and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Centennial.
  • The value is the valuation declared on the permit, which sets the fee. Many over-the-counter home permits list none or a nominal figure, so values are a guide, not a cost.
  • Hailstorms drive roofing: a storm season can double a month's permits, so roofing counts swing from year to year.
  • The city's broad 'Misc' class (EV circuits, sewer repairs, furnace swaps, siding) is sorted into trades from the short work description; anything left is a remodel or repair.
  • Homes are permits the city files as residential. Multi-family buildings and commercial work count as other.
  • A final date is the date the permit was finaled. Right-of-way, temporary use and development permits are left out.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Roofing permits in the City of Centennial, CO", https://contractorrecords.com/centennial/roofing-permits, data through September 2026, from the City of Centennial Building Services building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Roofing permits by month · Roofing permits by calendar month (index) · Roofing permits: days to final · Roofing permits: declared value · Roofing permits by ZIP code · Roofing permits by permit type.

Common questions

  • How many roofing permits does Centennial issue a year?About 1,272 a year in the City of Centennial: 2,544 permits issued October 2024 through September 2026, 872 of them in the last 12 months.
  • How long does a roofing permit take in Centennial?The usual one took 37 days from issue to the city's final inspection, and the middle half took 19 to 91 days (1,470 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Centennial file the most roofing permits?October (191 against an average month of 100); January is the quietest (48). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most roofing permits in Centennial?80015, with 921 of the 2,544 (36%); then 80122 (485).