Electrical permits in Culver City, CA

Data through September 2026 · updated 23 Oct 2026

1,622 electrical permits were issued in Culver City, October 2024 through September 2026: about 811 a year and 29% of all permits. 838 electrical permits in the last 12 months (Oct 2025–Sep 2026), 7% more than the 784 in the 12 months before. The busiest month is April. 90230 has the most, 868.

1,622permits issued
838last 12 months
Aprbusiest month
80%finished
Sep 2026records through

Electrical permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 62Oct2024Nov 2024: 59Dec 2024: 74Jan 2025: 66Jan2025Feb 2025: 59Mar 2025: 49Apr 2025: 56May 2025: 63Jun 2025: 75Jul 2025: 71JulAug 2025: 71Sep 2025: 79Oct 2025: 73Nov 2025: 71Dec 2025: 55Jan 2026: 51Jan2026Feb 2026: 80Mar 2026: 73Apr 2026: 107May 2026: 97Jun 2026: 65Jul 2026: 62JulAug 2026: 56Sep 2026: 48
The same numbers as a table
MonthPermits
Oct 202462
Nov 202459
Dec 202474
Jan 202566
Feb 202559
Mar 202549
Apr 202556
May 202563
Jun 202575
Jul 202571
Aug 202571
Sep 202579
Oct 202573
Nov 202571
Dec 202555
Jan 202651
Feb 202680
Mar 202673
Apr 2026107
May 202697
Jun 202665
Jul 202662
Aug 202656
Sep 202648

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (121), January the quietest (87). A busy month at the permit counter usually means a longer wait for a contractor.

January: 87 (100 = an average month)February: 103 (100 = an average month)March: 90 (100 = an average month)April: 121 (100 = an average month)121May: 118 (100 = an average month)June: 104 (100 = an average month)July: 98 (100 = an average month)August: 94 (100 = an average month)September: 94 (100 = an average month)October: 100 (100 = an average month)November: 96 (100 = an average month)December: 95 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January87
February103
March90
April121
May118
June104
July98
August94
September94
October100
November96
December95

Download this table (CSV)

How many electrical permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025784
Finished80.5%

Download this table (CSV)

ZIP codes with the most electrical permits

Counted at the property's ZIP code. Share is the part of the city's 1,622 electrical permits.

ZIP codePermitsShare
9023086854%
9023261038%
900661429%
902561under 1%
902921under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Electrical1,57797%
Electrical - EVSE453%

Download this table (CSV)

How Culver City compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Electrical permits for other places in Los Angeles and the Inland Empire. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Culver City, Accela Building Safety Permits (ArcGIS feature layer), read 23 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, electrical, plumbing, mechanical and demolition permits the City of Culver City issues inside the city limits, including the parts of the city with a Los Angeles (90066) mailing address. Neighboring Los Angeles neighborhoods (Palms, Mar Vista, Del Rey) and unincorporated Ladera Heights get their permits from the City or County of Los Angeles and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Culver City.
  • The file has no issue date. A permit counts once its status reads Issued or Finaled, and it is dated by the day the city opened the record, which for plan-checked work can be weeks or months before the permit was issued. Records opened in the last few months that are still in plan check are not counted yet, so the latest months read low and will rise as those permits are issued.
  • The file has no final date, so we can say how many permits finished but not how long they took. The city does not mark permits expired: one that lapsed without a final still reads Issued and counts as open.
  • The file has no declared job value, so we show no costs.
  • Building permits share one type, so roofing, ADU, new-home, addition and remodel counts, and the homes share, come from keywords in the city's description of the work and are approximate.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in Culver City, CA", https://contractorrecords.com/culver-city/electrical-permits, data through September 2026, from the City of Culver City Building Safety Division building-permit records.

Link to a table: By month · Season · How many get finished · By ZIP code · Permit types.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: finished share · Electrical permits by ZIP code · Electrical permits by permit type.

Common questions

  • How many electrical permits does Culver City issue a year?About 811 a year in Culver City: 1,622 permits issued October 2024 through September 2026, 838 of them in the last 12 months.
  • When do people in Culver City file the most electrical permits?April (121 against an average month of 100); January is the quietest (87). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most electrical permits in Culver City?90230, with 868 of the 1,622 (54%); then 90232 (610).