HVAC permits in Culver City, CA

Data through September 2026 · updated 23 Oct 2026

883 HVAC permits were issued in Culver City, October 2024 through September 2026: about 442 a year and 16% of all permits. 466 HVAC permits in the last 12 months (Oct 2025–Sep 2026), 12% more than the 417 in the 12 months before. The busiest month is June. 90230 has the most, 410.

883permits issued
466last 12 months
Junbusiest month
74%finished
Sep 2026records through

HVAC permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 41Oct2024Nov 2024: 34Dec 2024: 23Jan 2025: 33Jan2025Feb 2025: 34Mar 2025: 23Apr 2025: 32May 2025: 42Jun 2025: 43Jul 2025: 40JulAug 2025: 36Sep 2025: 36Oct 2025: 33Nov 2025: 48Dec 2025: 35Jan 2026: 36Jan2026Feb 2026: 42Mar 2026: 49Apr 2026: 31May 2026: 32Jun 2026: 44Jul 2026: 38JulAug 2026: 42Sep 2026: 36
The same numbers as a table
MonthPermits
Oct 202441
Nov 202434
Dec 202423
Jan 202533
Feb 202534
Mar 202523
Apr 202532
May 202542
Jun 202543
Jul 202540
Aug 202536
Sep 202536
Oct 202533
Nov 202548
Dec 202535
Jan 202636
Feb 202642
Mar 202649
Apr 202631
May 202632
Jun 202644
Jul 202638
Aug 202642
Sep 202636

Download this table (CSV)

When HVAC permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (118), December the quietest (79). A busy month at the permit counter usually means a longer wait for a contractor.

January: 94 (100 = an average month)February: 103 (100 = an average month)March: 98 (100 = an average month)April: 86 (100 = an average month)May: 101 (100 = an average month)June: 118 (100 = an average month)118July: 106 (100 = an average month)August: 106 (100 = an average month)September: 98 (100 = an average month)October: 101 (100 = an average month)November: 111 (100 = an average month)December: 79 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January94
February103
March98
April86
May101
June118
July106
August106
September98
October101
November111
December79

Download this table (CSV)

How many HVAC permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025417
Finished73.9%

Download this table (CSV)

ZIP codes with the most HVAC permits

Counted at the property's ZIP code. Share is the part of the city's 883 HVAC permits.

ZIP codePermitsShare
9023041046%
9023238443%
900668910%

Download this table (CSV)

How Culver City compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

HVAC permits for other places in Los Angeles and the Inland Empire. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Culver City, Accela Building Safety Permits (ArcGIS feature layer), read 23 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, electrical, plumbing, mechanical and demolition permits the City of Culver City issues inside the city limits, including the parts of the city with a Los Angeles (90066) mailing address. Neighboring Los Angeles neighborhoods (Palms, Mar Vista, Del Rey) and unincorporated Ladera Heights get their permits from the City or County of Los Angeles and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Culver City.
  • The file has no issue date. A permit counts once its status reads Issued or Finaled, and it is dated by the day the city opened the record, which for plan-checked work can be weeks or months before the permit was issued. Records opened in the last few months that are still in plan check are not counted yet, so the latest months read low and will rise as those permits are issued.
  • The file has no final date, so we can say how many permits finished but not how long they took. The city does not mark permits expired: one that lapsed without a final still reads Issued and counts as open.
  • The file has no declared job value, so we show no costs.
  • Building permits share one type, so roofing, ADU, new-home, addition and remodel counts, and the homes share, come from keywords in the city's description of the work and are approximate.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "HVAC permits in Culver City, CA", https://contractorrecords.com/culver-city/hvac-permits, data through September 2026, from the City of Culver City Building Safety Division building-permit records.

Link to a table: By month · Season · How many get finished · By ZIP code.

Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index) · HVAC permits: finished share · HVAC permits by ZIP code.

Common questions

  • How many HVAC permits does Culver City issue a year?About 442 a year in Culver City: 883 permits issued October 2024 through September 2026, 466 of them in the last 12 months.
  • When do people in Culver City file the most HVAC permits?June (118 against an average month of 100); December is the quietest (79). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most HVAC permits in Culver City?90230, with 410 of the 883 (46%); then 90232 (384).