Roofing permits in Culver City, CA

Data through September 2026 · updated 23 Oct 2026

377 roofing permits were issued in Culver City, October 2024 through September 2026: about 188 a year and 7% of all permits. 211 roofing permits in the last 12 months (Oct 2025–Sep 2026), 27% more than the 166 in the 12 months before. The busiest month is April. 90232 has the most, 179.

377permits issued
211last 12 months
Aprbusiest month
82%finished
Sep 2026records through

Roofing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 18Oct2024Nov 2024: 15Dec 2024: 15Jan 2025: 12Jan2025Feb 2025: 10Mar 2025: 8Apr 2025: 19May 2025: 12Jun 2025: 12Jul 2025: 14JulAug 2025: 11Sep 2025: 20Oct 2025: 22Nov 2025: 12Dec 2025: 14Jan 2026: 8Jan2026Feb 2026: 18Mar 2026: 21Apr 2026: 27May 2026: 15Jun 2026: 22Jul 2026: 16JulAug 2026: 16Sep 2026: 20
The same numbers as a table
MonthPermits
Oct 202418
Nov 202415
Dec 202415
Jan 202512
Feb 202510
Mar 20258
Apr 202519
May 202512
Jun 202512
Jul 202514
Aug 202511
Sep 202520
Oct 202522
Nov 202512
Dec 202514
Jan 20268
Feb 202618
Mar 202621
Apr 202627
May 202615
Jun 202622
Jul 202616
Aug 202616
Sep 202620

Download this table (CSV)

When roofing permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (146), January the quietest (64). A busy month at the permit counter usually means a longer wait for a contractor.

January: 64 (100 = an average month)February: 89 (100 = an average month)March: 92 (100 = an average month)April: 146 (100 = an average month)146May: 86 (100 = an average month)June: 108 (100 = an average month)July: 95 (100 = an average month)August: 86 (100 = an average month)September: 127 (100 = an average month)October: 127 (100 = an average month)November: 86 (100 = an average month)December: 92 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January64
February89
March92
April146
May86
June108
July95
August86
September127
October127
November86
December92

Download this table (CSV)

How many roofing permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025166
Finished82.5%

Download this table (CSV)

ZIP codes with the most roofing permits

Counted at the property's ZIP code. Share is the part of the city's 377 roofing permits.

ZIP codePermitsShare
9023217947%
9023015341%
900664512%

Download this table (CSV)

How Culver City compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Roofing permits for other places in Los Angeles and the Inland Empire. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Culver City, Accela Building Safety Permits (ArcGIS feature layer), read 23 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, electrical, plumbing, mechanical and demolition permits the City of Culver City issues inside the city limits, including the parts of the city with a Los Angeles (90066) mailing address. Neighboring Los Angeles neighborhoods (Palms, Mar Vista, Del Rey) and unincorporated Ladera Heights get their permits from the City or County of Los Angeles and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Culver City.
  • The file has no issue date. A permit counts once its status reads Issued or Finaled, and it is dated by the day the city opened the record, which for plan-checked work can be weeks or months before the permit was issued. Records opened in the last few months that are still in plan check are not counted yet, so the latest months read low and will rise as those permits are issued.
  • The file has no final date, so we can say how many permits finished but not how long they took. The city does not mark permits expired: one that lapsed without a final still reads Issued and counts as open.
  • The file has no declared job value, so we show no costs.
  • Building permits share one type, so roofing, ADU, new-home, addition and remodel counts, and the homes share, come from keywords in the city's description of the work and are approximate.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Roofing permits in Culver City, CA", https://contractorrecords.com/culver-city/roofing-permits, data through September 2026, from the City of Culver City Building Safety Division building-permit records.

Link to a table: By month · Season · How many get finished · By ZIP code.

Download the tables (CSV): Roofing permits by month · Roofing permits by calendar month (index) · Roofing permits: finished share · Roofing permits by ZIP code.

Common questions

  • How many roofing permits does Culver City issue a year?About 188 a year in Culver City: 377 permits issued October 2024 through September 2026, 211 of them in the last 12 months.
  • When do people in Culver City file the most roofing permits?April (146 against an average month of 100); January is the quietest (64). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most roofing permits in Culver City?90232, with 179 of the 377 (47%); then 90230 (153).