Contractor Records
Home › Culver City › Remodels & repairs

Remodel and repair permits in Culver City, CA

Data through September 2026 · updated 23 Oct 2026

245 remodel and repair permits were issued in Culver City, October 2024 through September 2026: about 122 a year and 4% of all permits. 101 remodel and repair permits in the last 12 months (Oct 2025–Sep 2026), 30% fewer than the 144 in the 12 months before. The busiest month is January. 90230 has the most, 142.

245permits issued
101last 12 months
Janbusiest month
74%finished
Sep 2026records through

Remodel and repair permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 13Oct2024Nov 2024: 11Dec 2024: 12Jan 2025: 16Jan2025Feb 2025: 12Mar 2025: 12Apr 2025: 11May 2025: 10Jun 2025: 9Jul 2025: 14JulAug 2025: 12Sep 2025: 12Oct 2025: 9Nov 2025: 7Dec 2025: 15Jan 2026: 11Jan2026Feb 2026: 10Mar 2026: 10Apr 2026: 4May 2026: 6Jun 2026: 6Jul 2026: 10JulAug 2026: 8Sep 2026: 5
The same numbers as a table
MonthPermits
Oct 202413
Nov 202411
Dec 202412
Jan 202516
Feb 202512
Mar 202512
Apr 202511
May 202510
Jun 20259
Jul 202514
Aug 202512
Sep 202512
Oct 20259
Nov 20257
Dec 202515
Jan 202611
Feb 202610
Mar 202610
Apr 20264
May 20266
Jun 20266
Jul 202610
Aug 20268
Sep 20265

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). January is the busiest (132), April the quietest (73). A busy month at the permit counter usually means a longer wait for a contractor.

January: 132 (100 = an average month)132February: 108 (100 = an average month)March: 108 (100 = an average month)April: 73 (100 = an average month)May: 78 (100 = an average month)June: 73 (100 = an average month)July: 118 (100 = an average month)August: 98 (100 = an average month)September: 83 (100 = an average month)October: 108 (100 = an average month)November: 88 (100 = an average month)December: 132 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January132
February108
March108
April73
May78
June73
July118
August98
September83
October108
November88
December132

Download this table (CSV)

How many remodel and repair permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025144
Finished73.6%

Download this table (CSV)

ZIP codes with the most remodel and repair permits

Counted at the property's ZIP code. Share is the part of the city's 245 remodel and repair permits.

ZIP codePermitsShare
9023014258%
902328033%
90066239%

Download this table (CSV)

How Culver City compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Remodel and repair permits for other places in Los Angeles and the Inland Empire. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Culver City, Accela Building Safety Permits (ArcGIS feature layer), read 23 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, electrical, plumbing, mechanical and demolition permits the City of Culver City issues inside the city limits, including the parts of the city with a Los Angeles (90066) mailing address. Neighboring Los Angeles neighborhoods (Palms, Mar Vista, Del Rey) and unincorporated Ladera Heights get their permits from the City or County of Los Angeles and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Culver City.
  • The file has no issue date. A permit counts once its status reads Issued or Finaled, and it is dated by the day the city opened the record, which for plan-checked work can be weeks or months before the permit was issued. Records opened in the last few months that are still in plan check are not counted yet, so the latest months read low and will rise as those permits are issued.
  • The file has no final date, so we can say how many permits finished but not how long they took. The city does not mark permits expired: one that lapsed without a final still reads Issued and counts as open.
  • The file has no declared job value, so we show no costs.
  • Building permits share one type, so roofing, ADU, new-home, addition and remodel counts, and the homes share, come from keywords in the city's description of the work and are approximate.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in Culver City, CA", https://contractorrecords.com/culver-city/remodel-permits, data through September 2026, from the City of Culver City Building Safety Division building-permit records.

Link to a table: By month · Season · How many get finished · By ZIP code.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: finished share · Remodels & repairs permits by ZIP code.

Common questions

  • How many remodel and repair permits does Culver City issue a year?About 122 a year in Culver City: 245 permits issued October 2024 through September 2026, 101 of them in the last 12 months.
  • When do people in Culver City file the most remodel and repair permits?January (132 against an average month of 100); April is the quietest (73). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most remodel and repair permits in Culver City?90230, with 142 of the 245 (58%); then 90232 (80).