Contractor Records
Home › Corona › Remodels & repairs

Remodel and repair permits in Corona, CA

Data through September 2026 · updated 23 Oct 2026

447 remodel and repair permits were issued in Corona, October 2024 through September 2026: about 224 a year and 6% of all permits. 227 remodel and repair permits in the last 12 months (Oct 2025–Sep 2026), 3% more than the 220 in the 12 months before. The busiest month is June. The usual one took 47 days from issue to the city's final. 92882 has the most, 186.

447permits issued
227last 12 months
Junbusiest month
47days, usual issue to final
81%finished
$8,000usual declared value
Sep 2026records through

Remodel and repair permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 20Oct2024Nov 2024: 25Dec 2024: 13Jan 2025: 15Jan2025Feb 2025: 14Mar 2025: 16Apr 2025: 17May 2025: 18Jun 2025: 22Jul 2025: 21JulAug 2025: 16Sep 2025: 23Oct 2025: 11Nov 2025: 12Dec 2025: 25Jan 2026: 12Jan2026Feb 2026: 21Mar 2026: 24Apr 2026: 24May 2026: 26Jun 2026: 24Jul 2026: 12JulAug 2026: 15Sep 2026: 21
The same numbers as a table
MonthPermits
Oct 202420
Nov 202425
Dec 202413
Jan 202515
Feb 202514
Mar 202516
Apr 202517
May 202518
Jun 202522
Jul 202521
Aug 202516
Sep 202523
Oct 202511
Nov 202512
Dec 202525
Jan 202612
Feb 202621
Mar 202624
Apr 202624
May 202626
Jun 202624
Jul 202612
Aug 202615
Sep 202621

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (123), January the quietest (72). A busy month at the permit counter usually means a longer wait for a contractor.

January: 72 (100 = an average month)February: 94 (100 = an average month)March: 107 (100 = an average month)April: 110 (100 = an average month)May: 118 (100 = an average month)June: 123 (100 = an average month)123July: 89 (100 = an average month)August: 83 (100 = an average month)September: 118 (100 = an average month)October: 83 (100 = an average month)November: 99 (100 = an average month)December: 102 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January72
February94
March107
April110
May118
June123
July89
August83
September118
October83
November99
December102

Download this table (CSV)

How long a remodel and repair permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 179 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025220
Finished81.4%
Usual days, issue to final47
Middle half, days29–91

Download this table (CSV)

What a remodel and repair permit is declared at

The value written on the permit at application, from 426 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$8,000
Middle half$4,700–$19,600

Download this table (CSV)

ZIP codes with the most remodel and repair permits

Counted at the property's ZIP code. Share is the part of the city's 447 remodel and repair permits.

ZIP codePermitsShare
9288218642%
928799922%
928819321%
928804410%
92883245%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Building Residential24054%
Single Family Alteration20746%

Download this table (CSV)

How Corona compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Remodel and repair permits for other places in Los Angeles and the Inland Empire. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: CorStat (City of Corona open data), Building Permits dataset 2agx-camz, read 23 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, electrical, plumbing, mechanical, solar, re-roof, fence, pool and fire-sprinkler permits the City of Corona Building Division issues inside city limits. Unincorporated neighbors such as Temescal Valley, El Cerrito, Home Gardens and Coronita get their permits from Riverside County and are not in this file (they are on the Riverside County pages). Public-works encroachment and utility permits and planning or fire-prevention reviews are not counted.

  • The city's permit file names no contractor, so there are no contractor lists, rankings or firm pages for Corona.
  • The job value is filled on about half of permits: almost always on re-roofs, fences, home additions, ADUs, new homes and commercial work, but most electrical, solar, HVAC and plumbing permits carry $0, which we treat as no value.
  • Solar counts both the city's standard solar permits and those issued through its automated online solar review (listed in the file as Symbium Solar); many include battery storage.
  • A final date is the city's finaled date. A permit marked with a certificate of occupancy counts as finished. Water-heater replacements count as plumbing; fire sprinklers, alarms and signs count as other.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in Corona, CA", https://contractorrecords.com/corona/remodel-permits, data through September 2026, from City of Corona Building Division building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: days to final · Remodels & repairs permits: declared value · Remodels & repairs permits by ZIP code · Remodels & repairs permits by permit type.

Common questions

  • How many remodel and repair permits does Corona issue a year?About 224 a year in Corona: 447 permits issued October 2024 through September 2026, 227 of them in the last 12 months.
  • How long does a remodel and repair permit take in Corona?The usual one took 47 days from issue to the city's final inspection, and the middle half took 29 to 91 days (179 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Corona file the most remodel and repair permits?June (123 against an average month of 100); January is the quietest (72). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most remodel and repair permits in Corona?92882, with 186 of the 447 (42%); then 92879 (99).