973 roofing permits were issued in unincorporated Riverside County, October 2024 through September 2026: about 486 a year and 4% of all permits. 486 roofing permits in the last 12 months (Oct 2025–Sep 2026), about the same as the 487 in the 12 months before. The busiest month is October. The usual one took 37 days from issue to the county's final.

973permits issued
486last 12 months
Octbusiest month
37days, usual issue to final
64%finished
Sep 2026records through

Roofing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 74Oct2024Nov 2024: 33Dec 2024: 28Jan 2025: 33Jan2025Feb 2025: 29Mar 2025: 48Apr 2025: 58May 2025: 38Jun 2025: 32Jul 2025: 46JulAug 2025: 41Sep 2025: 27Oct 2025: 44Nov 2025: 35Dec 2025: 37Jan 2026: 29Jan2026Feb 2026: 41Mar 2026: 44Apr 2026: 57May 2026: 45Jun 2026: 42Jul 2026: 37JulAug 2026: 33Sep 2026: 42
The same numbers as a table
MonthPermits
Oct 202474
Nov 202433
Dec 202428
Jan 202533
Feb 202529
Mar 202548
Apr 202558
May 202538
Jun 202532
Jul 202546
Aug 202541
Sep 202527
Oct 202544
Nov 202535
Dec 202537
Jan 202629
Feb 202641
Mar 202644
Apr 202657
May 202645
Jun 202642
Jul 202637
Aug 202633
Sep 202642

Download this table (CSV)

When roofing permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (146), January the quietest (76). A busy month at the permit counter usually means a longer wait for a contractor.

January: 76 (100 = an average month)February: 86 (100 = an average month)March: 113 (100 = an average month)April: 142 (100 = an average month)May: 102 (100 = an average month)June: 91 (100 = an average month)July: 102 (100 = an average month)August: 91 (100 = an average month)September: 85 (100 = an average month)October: 146 (100 = an average month)146November: 84 (100 = an average month)December: 80 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January76
February86
March113
April142
May102
June91
July102
August91
September85
October146
November84
December80

Download this table (CSV)

How long a roofing permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 312 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025487
Finished64.1%
Expired35.1%
Usual days, issue to final37
Middle half, days23–95

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Roofing And/Or Deck Replacement91094%
Installation/Replacement Commercial596%
Structure Alteration Commercial3under 1%
Other Construction1under 1%

Download this table (CSV)

How Riverside County compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Roofing permits for other places in Los Angeles and the Inland Empire. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Riverside County GIS Open Data, PLUS_ACTIVITIES (Public Land Use System), Building department records, read 23 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits Riverside County Building and Safety issues for unincorporated land only: places such as Thermal, Mecca, Winchester, French Valley, Mead Valley, Anza, Aguanga, Temescal Valley and the Temecula wine country. Riverside, Moreno Valley, Corona, Temecula, Murrieta, Palm Springs and the county's other incorporated cities (28 in all) run their own permit offices and are not in this file. Blythe permits, which the county keeps under their own permit type, are left out too.

  • The county's file names no contractor, so there are no contractor lists, rankings or firm pages for Riverside County.
  • The file has no declared job value, so we show no costs.
  • The file gives a parcel number but no ZIP code, so there are no ZIP code pages.
  • Tract builders file one permit per house, so a new subdivision shows as many new-home permits, often with a matching repeat-production wall permit for each lot.
  • Battery storage permits are counted as electrical; rooftop and ground-mount solar as solar.
  • A final date is the county's completed date on a permit marked Final. Administratively closed permits count as expired.
  • Grading, hourly inspection, agricultural fee-only and legacy converted records are left out.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Roofing permits in unincorporated Riverside County, CA", https://contractorrecords.com/riverside-county/roofing-permits, data through September 2026, from Riverside County Building and Safety building-permit records.

Link to a table: By month · Season · Days to final · Permit types.

Download the tables (CSV): Roofing permits by month · Roofing permits by calendar month (index) · Roofing permits: days to final · Roofing permits by permit type.

Common questions

  • How many roofing permits does Riverside County issue a year?About 486 a year in unincorporated Riverside County: 973 permits issued October 2024 through September 2026, 486 of them in the last 12 months.
  • How long does a roofing permit take in Riverside County?The usual one took 37 days from issue to the county's final inspection, and the middle half took 23 to 95 days (312 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.