Data through September 2026 · updated 19 Oct 2026

309 garage, shed and shade structure permits were issued in the Town of Gilbert, October 2024 through September 2026: about 154 a year and 5% of all permits. 157 garage, shed and shade structure permits in the last 12 months (Oct 2025–Sep 2026), 3% more than the 152 in the 12 months before. The busiest month is June. The usual one took 189 days from issue to the town's final. 85298 has the most, 85.

309permits issued
157last 12 months
Junbusiest month
189days, usual issue to final
64%finished
$36,450usual declared value
Sep 2026records through

Garage, shed and shade structure permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 14Oct2024Nov 2024: 15Dec 2024: 12Jan 2025: 15Jan2025Feb 2025: 10Mar 2025: 12Apr 2025: 12May 2025: 15Jun 2025: 11Jul 2025: 11JulAug 2025: 10Sep 2025: 15Oct 2025: 13Nov 2025: 8Dec 2025: 17Jan 2026: 7Jan2026Feb 2026: 12Mar 2026: 16Apr 2026: 11May 2026: 9Jun 2026: 19Jul 2026: 17JulAug 2026: 15Sep 2026: 13
The same numbers as a table
MonthPermits
Oct 202414
Nov 202415
Dec 202412
Jan 202515
Feb 202510
Mar 202512
Apr 202512
May 202515
Jun 202511
Jul 202511
Aug 202510
Sep 202515
Oct 202513
Nov 20258
Dec 202517
Jan 20267
Feb 202612
Mar 202616
Apr 202611
May 20269
Jun 202619
Jul 202617
Aug 202615
Sep 202613

Download this table (CSV)

When garage, shed and shade structure permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (117), January the quietest (85). A busy month at the permit counter usually means a longer wait for a contractor.

January: 85 (100 = an average month)February: 85 (100 = an average month)March: 109 (100 = an average month)April: 89 (100 = an average month)May: 93 (100 = an average month)June: 117 (100 = an average month)117July: 109 (100 = an average month)August: 97 (100 = an average month)September: 109 (100 = an average month)October: 105 (100 = an average month)November: 89 (100 = an average month)December: 113 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January85
February85
March109
April89
May93
June117
July109
August97
September109
October105
November89
December113

Download this table (CSV)

How long a garage, shed and shade structure permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 97 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025152
Finished63.8%
Expired0.0%
Usual days, issue to final189
Middle half, days77–279

Download this table (CSV)

What a garage, shed and shade structure permit is declared at

The value written on the permit at application, from 302 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$36,450
Middle half$13,770–$87,758

Download this table (CSV)

ZIP codes with the most garage, shed and shade structure permits

Counted at the property's ZIP code. Share is the part of the town's 309 garage, shed and shade structure permits.

ZIP codePermitsShare
852988528%
852976621%
852346521%
852963511%
85295237%
85233196%
85142165%

Download this table (CSV)

The town's own permit types

How the town filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential Accessory Structure - New28592%
Residential Accessory Structure - Addition/Alteration248%

Download this table (CSV)

Nearby permit data

Garage, shed and shade structure permits for other places in Phoenix. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Town of Gilbert open data, EnergovPermitData (ArcGIS table), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the Town of Gilbert issues inside the town limits only. Mesa, Chandler, Queen Creek and unincorporated Maricopa County islands next to Gilbert run their own permit offices and are not in this file.

  • The town's open permit file names no contractor, so there are no contractor lists, rankings or firm pages for Gilbert.
  • New homes include production homes built from a builder's standard plan and custom homes.
  • The town files residential additions and alterations together; they are counted as remodels and repairs.
  • The town's file has no roofing or solar work class, so roof replacements are not shown and solar is counted with residential electrical work.
  • Plan changes and deferred submittals (amendments to a permit already issued), standard plan approvals, and traffic and engineering permits are left out.
  • The value is the valuation on the permit, which sets the fee; trade permits often carry none. It is not a final cost.
  • A final date is the date the permit was finaled.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Garage, shed and shade structure permits in the Town of Gilbert, AZ", https://contractorrecords.com/gilbert/accessory-permits, data through September 2026, from the Town of Gilbert Development Services building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Garages, sheds & shade structures permits by month · Garages, sheds & shade structures permits by calendar month (index) · Garages, sheds & shade structures permits: days to final · Garages, sheds & shade structures permits: declared value · Garages, sheds & shade structures permits by ZIP code · Garages, sheds & shade structures permits by permit type.

Common questions

  • How many garage, shed and shade structure permits does Gilbert issue a year?About 154 a year in the Town of Gilbert: 309 permits issued October 2024 through September 2026, 157 of them in the last 12 months.
  • How long does a garage, shed and shade structure permit take in Gilbert?The usual one took 189 days from issue to the town's final inspection, and the middle half took 77 to 279 days (97 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Gilbert file the most garage, shed and shade structure permits?June (117 against an average month of 100); January is the quietest (85). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most garage, shed and shade structure permits in Gilbert?85298, with 85 of the 309 (28%); then 85297 (66).