New home permits in the Town of Gilbert, AZ

Data through September 2026 · updated 19 Oct 2026

656 new home permits were issued in the Town of Gilbert, October 2024 through September 2026: about 328 a year and 10% of all permits. 235 new home permits in the last 12 months (Oct 2025–Sep 2026), 44% fewer than the 421 in the 12 months before. The busiest month is June. The usual one took 207 days from issue to the town's final. 85298 has the most, 297.

656permits issued
235last 12 months
Junbusiest month
207days, usual issue to final
80%finished
$253,640usual declared value
Sep 2026records through

New home permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 32Oct2024Nov 2024: 39Dec 2024: 35Jan 2025: 36Jan2025Feb 2025: 44Mar 2025: 55Apr 2025: 30May 2025: 11Jun 2025: 92Jul 2025: 19JulAug 2025: 13Sep 2025: 15Oct 2025: 18Nov 2025: 5Dec 2025: 11Jan 2026: 12Jan2026Feb 2026: 16Mar 2026: 40Apr 2026: 39May 2026: 12Jun 2026: 12Jul 2026: 19JulAug 2026: 21Sep 2026: 30
The same numbers as a table
MonthPermits
Oct 202432
Nov 202439
Dec 202435
Jan 202536
Feb 202544
Mar 202555
Apr 202530
May 202511
Jun 202592
Jul 202519
Aug 202513
Sep 202515
Oct 202518
Nov 20255
Dec 202511
Jan 202612
Feb 202616
Mar 202640
Apr 202639
May 202612
Jun 202612
Jul 202619
Aug 202621
Sep 202630

Download this table (CSV)

When new home permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (190), May the quietest (42). A busy month at the permit counter usually means a longer wait for a contractor.

January: 88 (100 = an average month)February: 110 (100 = an average month)March: 174 (100 = an average month)April: 126 (100 = an average month)May: 42 (100 = an average month)June: 190 (100 = an average month)190July: 70 (100 = an average month)August: 62 (100 = an average month)September: 82 (100 = an average month)October: 91 (100 = an average month)November: 80 (100 = an average month)December: 84 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January88
February110
March174
April126
May42
June190
July70
August62
September82
October91
November80
December84

Download this table (CSV)

How long a new home permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 338 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025421
Finished80.3%
Expired0.0%
Usual days, issue to final207
Middle half, days178–258

Download this table (CSV)

What a new home permit is declared at

The value written on the permit at application, from 656 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$253,640
Middle half$164,392–$454,323

Download this table (CSV)

ZIP codes with the most new home permits

Counted at the property's ZIP code. Share is the part of the town's 656 new home permits.

ZIP codePermitsShare
8529829745%
8529512219%
8529612018%
852976610%
85142335%
85234122%
852336under 1%

Download this table (CSV)

The town's own permit types

How the town filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential Building - Standardized59791%
Residential Building - Custom599%

Download this table (CSV)

How Gilbert compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

New home permits for other places in Phoenix. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Town of Gilbert open data, EnergovPermitData (ArcGIS table), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the Town of Gilbert issues inside the town limits only. Mesa, Chandler, Queen Creek and unincorporated Maricopa County islands next to Gilbert run their own permit offices and are not in this file.

  • The town's open permit file names no contractor, so there are no contractor lists, rankings or firm pages for Gilbert.
  • New homes include production homes built from a builder's standard plan and custom homes.
  • The town files residential additions and alterations together; they are counted as remodels and repairs.
  • The town's file has no roofing or solar work class, so roof replacements are not shown and solar is counted with residential electrical work.
  • Plan changes and deferred submittals (amendments to a permit already issued), standard plan approvals, and traffic and engineering permits are left out.
  • The value is the valuation on the permit, which sets the fee; trade permits often carry none. It is not a final cost.
  • A final date is the date the permit was finaled.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "New home permits in the Town of Gilbert, AZ", https://contractorrecords.com/gilbert/new-home-permits, data through September 2026, from the Town of Gilbert Development Services building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): New homes permits by month · New homes permits by calendar month (index) · New homes permits: days to final · New homes permits: declared value · New homes permits by ZIP code · New homes permits by permit type.

Common questions

  • How many new home permits does Gilbert issue a year?About 328 a year in the Town of Gilbert: 656 permits issued October 2024 through September 2026, 235 of them in the last 12 months.
  • How long does a new home permit take in Gilbert?The usual one took 207 days from issue to the town's final inspection, and the middle half took 178 to 258 days (338 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Gilbert file the most new home permits?June (190 against an average month of 100); May is the quietest (42). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most new home permits in Gilbert?85298, with 297 of the 656 (45%); then 85295 (122).