Electrical permits in the Town of Gilbert, AZ

Data through September 2026 · updated 19 Oct 2026

1,487 electrical permits were issued in the Town of Gilbert, October 2024 through September 2026: about 744 a year and 22% of all permits. 762 electrical permits in the last 12 months (Oct 2025–Sep 2026), 5% more than the 725 in the 12 months before. The busiest month is August. The usual one took 32 days from issue to the town's final. 85234 has the most, 333.

1,487permits issued
762last 12 months
Augbusiest month
32days, usual issue to final
86%finished
Sep 2026records through

Electrical permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 49Oct2024Nov 2024: 48Dec 2024: 63Jan 2025: 58Jan2025Feb 2025: 59Mar 2025: 61Apr 2025: 54May 2025: 55Jun 2025: 66Jul 2025: 48JulAug 2025: 80Sep 2025: 84Oct 2025: 94Nov 2025: 64Dec 2025: 65Jan 2026: 34Jan2026Feb 2026: 36Mar 2026: 65Apr 2026: 75May 2026: 66Jun 2026: 74Jul 2026: 63JulAug 2026: 75Sep 2026: 51
The same numbers as a table
MonthPermits
Oct 202449
Nov 202448
Dec 202463
Jan 202558
Feb 202559
Mar 202561
Apr 202554
May 202555
Jun 202566
Jul 202548
Aug 202580
Sep 202584
Oct 202594
Nov 202564
Dec 202565
Jan 202634
Feb 202636
Mar 202665
Apr 202675
May 202666
Jun 202674
Jul 202663
Aug 202675
Sep 202651

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). August is the busiest (125), January the quietest (74). A busy month at the permit counter usually means a longer wait for a contractor.

January: 74 (100 = an average month)February: 77 (100 = an average month)March: 102 (100 = an average month)April: 104 (100 = an average month)May: 98 (100 = an average month)June: 113 (100 = an average month)July: 90 (100 = an average month)August: 125 (100 = an average month)125September: 109 (100 = an average month)October: 115 (100 = an average month)November: 90 (100 = an average month)December: 103 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January74
February77
March102
April104
May98
June113
July90
August125
September109
October115
November90
December103

Download this table (CSV)

How long an electrical permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 626 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025725
Finished86.3%
Expired0.0%
Usual days, issue to final32
Middle half, days13–65

Download this table (CSV)

ZIP codes with the most electrical permits

Counted at the property's ZIP code. Share is the part of the town's 1,487 electrical permits.

ZIP codePermitsShare
8523433322%
8529827118%
8523324216%
8529621715%
8529520614%
8529719913%
85142181%
852121under 1%

Download this table (CSV)

The town's own permit types

How the town filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential Trades/Fire/Misc - Electrical1,33990%
Commercial Trades/Fire/Misc - Electrical1329%
Residential Trades/Fire/Misc - Emergency/Backup Power Systems161%

Download this table (CSV)

How Gilbert compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Electrical permits for other places in Phoenix. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Town of Gilbert open data, EnergovPermitData (ArcGIS table), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the Town of Gilbert issues inside the town limits only. Mesa, Chandler, Queen Creek and unincorporated Maricopa County islands next to Gilbert run their own permit offices and are not in this file.

  • The town's open permit file names no contractor, so there are no contractor lists, rankings or firm pages for Gilbert.
  • New homes include production homes built from a builder's standard plan and custom homes.
  • The town files residential additions and alterations together; they are counted as remodels and repairs.
  • The town's file has no roofing or solar work class, so roof replacements are not shown and solar is counted with residential electrical work.
  • Plan changes and deferred submittals (amendments to a permit already issued), standard plan approvals, and traffic and engineering permits are left out.
  • The value is the valuation on the permit, which sets the fee; trade permits often carry none. It is not a final cost.
  • A final date is the date the permit was finaled.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in the Town of Gilbert, AZ", https://contractorrecords.com/gilbert/electrical-permits, data through September 2026, from the Town of Gilbert Development Services building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: days to final · Electrical permits by ZIP code · Electrical permits by permit type.

Common questions

  • How many electrical permits does Gilbert issue a year?About 744 a year in the Town of Gilbert: 1,487 permits issued October 2024 through September 2026, 762 of them in the last 12 months.
  • How long does an electrical permit take in Gilbert?The usual one took 32 days from issue to the town's final inspection, and the middle half took 13 to 65 days (626 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Gilbert file the most electrical permits?August (125 against an average month of 100); January is the quietest (74). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most electrical permits in Gilbert?85234, with 333 of the 1,487 (22%); then 85298 (271).