Plumbing permits in the Town of Gilbert, AZ

Data through September 2026 · updated 19 Oct 2026

850 plumbing permits were issued in the Town of Gilbert, October 2024 through September 2026: about 425 a year and 13% of all permits. 455 plumbing permits in the last 12 months (Oct 2025–Sep 2026), 15% more than the 395 in the 12 months before. The busiest month is March. The usual one took 18 days from issue to the town's final. 85298 has the most, 195.

850permits issued
455last 12 months
Marbusiest month
18days, usual issue to final
87%finished
Sep 2026records through

Plumbing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 35Oct2024Nov 2024: 22Dec 2024: 35Jan 2025: 42Jan2025Feb 2025: 36Mar 2025: 42Apr 2025: 35May 2025: 23Jun 2025: 27Jul 2025: 35JulAug 2025: 38Sep 2025: 25Oct 2025: 40Nov 2025: 37Dec 2025: 53Jan 2026: 26Jan2026Feb 2026: 42Mar 2026: 51Apr 2026: 34May 2026: 39Jun 2026: 34Jul 2026: 32JulAug 2026: 38Sep 2026: 29
The same numbers as a table
MonthPermits
Oct 202435
Nov 202422
Dec 202435
Jan 202542
Feb 202536
Mar 202542
Apr 202535
May 202523
Jun 202527
Jul 202535
Aug 202538
Sep 202525
Oct 202540
Nov 202537
Dec 202553
Jan 202626
Feb 202642
Mar 202651
Apr 202634
May 202639
Jun 202634
Jul 202632
Aug 202638
Sep 202629

Download this table (CSV)

When plumbing permits are filed

By calendar month, 100 = an average month (the thin line). March is the busiest (131), September the quietest (76). A busy month at the permit counter usually means a longer wait for a contractor.

January: 96 (100 = an average month)February: 110 (100 = an average month)March: 131 (100 = an average month)131April: 97 (100 = an average month)May: 88 (100 = an average month)June: 86 (100 = an average month)July: 95 (100 = an average month)August: 107 (100 = an average month)September: 76 (100 = an average month)October: 106 (100 = an average month)November: 83 (100 = an average month)December: 124 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January96
February110
March131
April97
May88
June86
July95
August107
September76
October106
November83
December124

Download this table (CSV)

How long a plumbing permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 345 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025395
Finished87.3%
Expired0.0%
Usual days, issue to final18
Middle half, days6–48

Download this table (CSV)

ZIP codes with the most plumbing permits

Counted at the property's ZIP code. Share is the part of the town's 850 plumbing permits.

ZIP codePermitsShare
8529819523%
8529514717%
8523414117%
8529612114%
8529711814%
8523311213%
85142121%
852062under 1%
852122under 1%

Download this table (CSV)

The town's own permit types

How the town filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential Trades/Fire/Misc - Gasline & LPG Tanks37544%
Residential Trades/Fire/Misc - Plumbing31036%
Backflow Assembly Installation - Backflow Assembly Installation12314%
Commercial Trades/Fire/Misc - Plumbing273%
Commercial Trades/Fire/Misc - Gasline & LPG Tanks152%

Download this table (CSV)

How Gilbert compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Plumbing permits for other places in Phoenix. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Town of Gilbert open data, EnergovPermitData (ArcGIS table), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the Town of Gilbert issues inside the town limits only. Mesa, Chandler, Queen Creek and unincorporated Maricopa County islands next to Gilbert run their own permit offices and are not in this file.

  • The town's open permit file names no contractor, so there are no contractor lists, rankings or firm pages for Gilbert.
  • New homes include production homes built from a builder's standard plan and custom homes.
  • The town files residential additions and alterations together; they are counted as remodels and repairs.
  • The town's file has no roofing or solar work class, so roof replacements are not shown and solar is counted with residential electrical work.
  • Plan changes and deferred submittals (amendments to a permit already issued), standard plan approvals, and traffic and engineering permits are left out.
  • The value is the valuation on the permit, which sets the fee; trade permits often carry none. It is not a final cost.
  • A final date is the date the permit was finaled.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Plumbing permits in the Town of Gilbert, AZ", https://contractorrecords.com/gilbert/plumbing-permits, data through September 2026, from the Town of Gilbert Development Services building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): Plumbing permits by month · Plumbing permits by calendar month (index) · Plumbing permits: days to final · Plumbing permits by ZIP code · Plumbing permits by permit type.

Common questions

  • How many plumbing permits does Gilbert issue a year?About 425 a year in the Town of Gilbert: 850 permits issued October 2024 through September 2026, 455 of them in the last 12 months.
  • How long does a plumbing permit take in Gilbert?The usual one took 18 days from issue to the town's final inspection, and the middle half took 6 to 48 days (345 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Gilbert file the most plumbing permits?March (131 against an average month of 100); September is the quietest (76). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most plumbing permits in Gilbert?85298, with 195 of the 850 (23%); then 85295 (147).