Florida Building Code 9th Edition: what changes for reroofs, windows and new homes on permits from 31 December 2026

Florida's 9th Edition (2026) Building Code takes effect on 31 December 2026, so any permit submitted in 2027 is reviewed under it (Miami-Dade). The residential volume is based on the 2024 International Residential Code; for the work homeowners hire most, it changes reroof details (drip edge fastened at 4 inches on center statewide, a 110 mph test for hip and ridge shingles), door ratings under overhangs, smoke and CO alarm rules, and tightens the energy code's performance path by just over 10% (Florida Building Commission). Roofing is the trade it reaches most often: Orlando issued 9,818 roofing permits and Miami 6,585 over October 2023 to September 2026.

By Contractor Records · data through October 17, 2026

The date and the cut-off

What Rule Source
Effective date 31 December 2026 Miami-Dade, ICC-NTA
Which permits All applications and plans submitted on or after that date Miami-Dade
Miami-Dade online portal Submissions after 4 p.m. on 30 December 2026 must comply Miami-Dade
Base model code 2024 IRC, with Florida amendments Florida Building Commission
Electrical 2023 National Electrical Code ICC-NTA

Miami-Dade also says applications filed before 30 December 2026 that expire can get an extension if requested in writing within 180 days of expiry, showing the application was pursued in good faith.

What changes for work on an existing home

From the Commission's analysis of changes for the Residential volume:

Section Change Job it touches
R905.2.8.5 Drip edge mechanically fastened at 4 inches on center throughout the state Shingle reroof
R905.2.6.2 Hip and ridge shingles: new wind test at 110 mph, or a prescriptive roof-cement method Shingle reroof
R908.3 Recover exception 2 revised to allow only the upper roof covering or system to be removed Roof-over jobs
R909 New section on roof coatings Flat and low-slope roofs
R803.3 Pipes, conduit and cables below the roof deck need 1½ inches of clearance Reroof over attic runs
R609.3 Doors relying on the overhang exception need a Limited Water (LW) rating Door replacement
R609.4 Garage door design pressures from ASCE 7 LRFD may be multiplied by 0.6 Garage doors
P2801.9 Water heaters must meet NSF 372, weighted average lead 0.25% or less Water heater swap
R311.7.6 No landing needed on exterior stairs of three or fewer risers to grade from a deck, porch or patio (if not the required exit) Decks
R314.3, R314.3.1 Smoke alarms in attached garages and rooms open to a sleeping loft; none within 10 feet of a cooking appliance (6 feet by exception) Remodels that trigger alarms
R315.1.1 Battery-only CO alarms need a nonreplaceable battery lasting at least 10 years Remodels that trigger alarms

What changes in the energy code

From DBPR's summary of significant energy changes:

Section 8th Edition (2023) 9th Edition (2026)
R405.3, performance path Maximum total e-Ratio 0.95 0.85 ("just over 10%" stricter)
R405.5.3.4, window SHGC in proposed design 0.50 0.40 (overhang exception of 4 feet kept)
R403.3.3, duct testing Exception for performance compliance Exception removed; ducts tested unless entirely inside the thermal envelope
R407, prescriptive path Not stated in the summary At least 10 credits from at least two measures; 5 more for homes over 5,000 sq ft
R403.1.2, thermostats Programmable Smart thermostats added as an option

These mostly reach new homes and additions; Cape Coral issued 3,254 new-home permits from January 2025 to September 2026.

What it means for hiring

  1. Quotes written in 2026 for 2027 work. A roofer's quote drawn up before the change may not include the 4-inch drip edge spacing or the hip and ridge test. Ask whether the price is to the 9th Edition.
  2. Submit date decides. If a job is ready before 30 December 2026, ask whether the contractor will file before then; after, it is the new code.
  3. Check the record. On the compare pages, Miami roofing permits reach final 97.5% of the time and Cape Coral's 98.4%.

Permits in the three Florida cities we cover

City Roofing permits Usual roof job value Usual days to final Window and door permits
Miami 6,585 $16,250 38 4,921
Orlando 9,818 $11,015 27 —
Cape Coral 2,018 $17,200 39 4,787

Orlando does not split out window and door permits in our data. Cape Coral's window covers January 2025 to September 2026; Miami and Orlando cover October 2023 to September 2026.

Check it yourself in five minutes

Read the Commission's Residential analysis of changes for your job type, then ask your contractor whether the quote and the permit will be to the 9th Edition.

What this page does not cover

The Commission's analysis is a summary; the code text decides. Miami-Dade's portal cut-off applies to Miami-Dade; other counties and cities set their own. Our permit data shows when permits were filed and finished, not which edition applied.

How we know this

Effective date and cut-off are quoted from Miami-Dade County's 9th Edition notice and the ICC National Training Academy's adoption note; residential and energy changes from the Florida Building Commission's Analysis of Changes (Residential) and DBPR's summary of significant energy changes, all read 26 October 2026. Permit counts are from the City of Miami, City of Orlando and City of Cape Coral open permit data over the window on each compare page.

Numbers come from City of Miami building permits (since 2014); City of Orlando building permits for one- and two-family homes; City of Cape Coral building permits (the city's open permit table starts January 2025), data through October 17, 2026. Nobody paid to be on this page and nobody can.

See every Miami roofer by permit record →

Questions

  • When does the Florida Building Code 9th Edition take effect?

    31 December 2026. Miami-Dade County says all permit applications and plans submitted on or after that date must comply with the new edition, and that online submissions after 4 p.m. on 30 December 2026 must also comply.

  • What is the 9th Edition based on?

    The Florida Building Commission's analysis says the 9th Edition (2026) Florida Building Code, Residential is based on the 2024 International Residential Code with Florida amendments. The ICC National Training Academy lists the 2023 National Electrical Code alongside it.

  • What changes for a reroof?

    Drip edge must be mechanically fastened at 4 inches on center throughout the state (R905.2.8.5), hip and ridge shingles get a wind test at 110 mph (R905.2.6.2), recovering rules change in R908.3, and a new section R909 covers roof coatings.

  • Do I need new smoke alarms under the 9th Edition?

    For work that triggers alarms under R314, smoke alarms are now required in attached garages and rooms open to a sleeping loft, may not go within 10 feet of a permanently installed cooking appliance (6 feet by exception), and battery-only CO alarms need a sealed battery of at least 10 years.

  • How many roofing permits does Miami issue?

    Miami issued 6,585 roofing permits from October 2023 to September 2026, to 908 firms; the usual filed job value was $16,250.