Electrical Work Cost in Marin County (unincorporated), CA: what the permits say

How much does electrical work cost in Marin County? The usual electrical job filed with Marin County is $4,000, from 1,459 priced permits (October 2023 through September 2026); the middle half of firms file between $3,250 and $5,500. A filed value is what the contractor wrote on the permit, not a quote or the final bill.

$4,000usual filed value
$3,250–$5,500middle half of firms' usual jobs
1,459priced permits (100% of 1,464)
315firms on file
124days, permit issue to final
Sep 2026records through

How much does electrical work cost in Marin County?

The usual electrical job filed with Marin County is $4,000, from 1,459 priced permits, October 2023 through September 2026. The middle half of firms usually file between $3,250 and $5,500. Half of jobs were filed for less, half for more. A filed value is what the contractor wrote on the permit, not a quote or the final bill. An electrical permit here usually takes 124 days from issue to final inspection. How long permits take →

What the spread looks like

Approximately, from each firm's own spread: every firm's range of filed values, weighted by its 1,459 priced permits across 313 firms, pooled into one. Half of Marin County (unincorporated) electrical permits were filed between $3,000 and $6,400.

PercentileFiled valueReads as
10th$2,0001 in 10 permits filed below
25th$3,0001 in 4 filed below
50th$4,000the middle permit
75th$6,4001 in 4 filed above
90th$10,0001 in 10 filed above

By home value

Firms split into thirds by the usual value of the homes they work on, with each third's usual filed value weighted by permits. Home values: Marin County assessed land and improvement values from MarinMap parcels (Proposition 13 values, which usually sit well below market value). Under Proposition 13 a home bought decades ago can carry a value far below what it would sell for today, so treat the home-value matching and the price-versus-similar-jobs comparison as rough.

Firms working onUsual home valueUsual filed valueFirmsPermits
Lower thirdunder $946,764$3,500104549
Middle third$946,764–$1,458,480$5,200104713
Upper third$1,475,034 and up$4,000104199

Busiest firms and what they usually charge

Top 10 by permits in the last 12 months. Usual is each firm's middle filed value; middle half is the range its middle half of jobs were filed in. Busy is not the same as careful: pick what you value to build a list.

FirmPermitsLast 12 moUsualMiddle halfFinished
Divine Electric Inc257128$5,200$3,550–$7,00053.0%
Talley Electric Service10898$2,500$2,250–$4,25056.3%
Ernest Ongaro & Sons Inc7320$3,500$2,800–$4,50068.7%
Rocky Hill Electric Inc3114$8,942$6,608–$10,62979.3%
Ace Wiring Electric Inc2513$6,000$5,300–$7,44090.8%
Auto Charge Electric Inc3112$5,800$4,950–$6,60085.2%
Platinum Waves Electric1110$4,300$2,325–$4,300—
Integrity Electric Inc289$6,750$4,500–$8,00072.7%
A K A Electric Inc1137$3,500$3,50069.8%
Rake Electric146$3,000$2,625–$4,0008 of 9

Why filed values run low or high

  • The 10 busiest firms usually file $5,200; the 285 firms with fewer than 10 permits usually file $4,000.
  • Firms working on the most expensive third of homes (usual home value $1,475,034 and up) usually file $4,000, against $3,500 for the least expensive third.
  • One permit type covers small and large jobs: 1 in 10 electrical permits is filed under $2,000 and 1 in 10 over $10,000, 5 times as much.
  • 99.7% of the 1,464 permits carry a value; the 5 without one are left out of every figure here.

Is your quote normal? Compare it with 1,459 filed values

Line your quote up against the file. In Marin County (unincorporated), 1 in 10 electrical filed values sit under $2,000, the middle half between $3,000 and $6,400, and 1 in 10 over $10,000.

  • $13,000Above $10,000: higher than 9 in 10 filed values for this work in Marin County (unincorporated).
  • $4,000Right at the usual $4,000: in the middle of the file.
  • $1,400Below $2,000: lower than 9 in 10. Ask what the quote leaves out.

When to schedule electrical work in Marin County

Marin County files the fewest electrical permits in August (73 against an average month of 100) and the most in January (150). If you can choose, ask for quotes in a quiet month. We have no prices by month, so this is about crews' schedules, not a discount. When each trade is busiest in Marin County →

How these numbers are made

Source: Marin County Community Development Agency building permits on homes in unincorporated Marin (the County's open-data permit and inspection files). The window is October 2023 through September 2026; a permit filed after that isn't here yet.

Usual is the middle permit: half were filed for less, half for more. Only permits with a filed value count; a value of $0 or none is left out.

The spread is approximate: we keep seven points of each firm's own range of filed values, not every permit, and pool them.

Nobody paid to be on this page and nobody can. How the records work in Marin County (unincorporated) →

Common questions

  • How many quotes should I get for an electrical job in Marin County (unincorporated)?At least three. In the permit record the middle half of Marin County (unincorporated) electrical firms usually file between $3,250 and $5,500 a job, so two ordinary firms can sit 1.7 times apart and both be normal for Marin County (unincorporated). A third quote shows which one is the outlier. Filed values are what contractors wrote on permits, not quotes, so use them to judge the spread, not to price your own job.
  • What range is normal for electrical jobs in Marin County (unincorporated)?Half of permits were filed between $3,000 and $6,400; 8 in 10 between $2,000 and $10,000. These are approximate, pooled from each firm's own spread.
  • How much do electricians charge in Marin County?The usual electrical job is filed at $4,000; the middle half of firms usually file between $3,250 and $5,500. The 10 firms with the most permits in the last 12 months usually file $5,200, more than the usual. See every firm's usual job →
  • How much is the electrical permit fee in Marin County?Marin County's published base fee is Electrical only: $202.83 (Marin County Permit Base Fees, read October 2026). These are base fees; the County adds impact fees and taxes, and other approval agencies can charge their own. The fee is separate from the contractor's price.
  • Do bigger houses get bigger bills?In the file, yes for the firms: those working on the upper third of homes by value usually file $4,000, the lower third $3,500. That is firms, not single jobs.
  • Where does this data come from?Marin County Community Development Agency building permits on homes in unincorporated Marin (the County's open-data permit and inspection files), read October 2026. How the records work in Marin County (unincorporated) →

Electrical cost in other cities: Nashville Orlando Cleveland Pittsburgh Miami Colorado Springs Honolulu Boulder Saint Paul Arlington, VA Cambridge Somerville Cary Mesa Naperville Cape Coral Palo Alto Denton Burlington, VT Medford Elk Grove Wheaton, IL Sacramento County (unincorporated) Citrus Heights, CA

Other job costs in Marin County (unincorporated): Roofing · HVAC · Solar & Battery · Kitchen, Bath & Remodel · Windows & Doors · Water Heater · Plumbing & Gas · Foundation & Retaining Wall · EV Charger · Siding & Stucco · Pool & Spa · Decks & Stairs · Addition · ADU