Contractor Records
Home › Citrus Heights, CA › Electrical & Panel cost

Electrical Work Cost in Citrus Heights, CA: what the permits say

How much does electrical work cost in Citrus Heights, CA? The usual electrical & panel job filed with Citrus Heights, CA is $3,000, from 1,437 priced permits (October 2023 through September 2026); the middle half of firms file between $2,500 and $4,500. A filed value is what the contractor wrote on the permit, not a quote or the final bill.

$3,000usual filed value
$2,500–$4,500middle half of firms' usual jobs
1,437priced permits (99% of 1,445)
344firms on file
54days, permit issue to final
Sep 2026records through

How much does electrical work cost in Citrus Heights, CA?

The usual electrical & panel job filed with Citrus Heights, CA is $3,000, from 1,437 priced permits, October 2023 through September 2026. The middle half of firms usually file between $2,500 and $4,500. Half of jobs were filed for less, half for more. A filed value is what the contractor wrote on the permit, not a quote or the final bill. An electrical & panel permit here usually takes 54 days from issue to final inspection. How long permits take →

What the spread looks like

Approximately, from each firm's own spread: every firm's range of filed values, weighted by its 1,437 priced permits across 342 firms, pooled into one. Half of Citrus Heights, CA electrical & panel permits were filed between $1,500 and $4,500.

PercentileFiled valueReads as
10th$1,3001 in 10 permits filed below
25th$1,5001 in 4 filed below
50th$3,000the middle permit
75th$4,5001 in 4 filed above
90th$6,7001 in 10 filed above

Busiest firms and what they usually charge

Top 10 by permits in the last 12 months. Usual is each firm's middle filed value; middle half is the range its middle half of jobs were filed in. Busy is not the same as careful: pick what you value to build a list.

FirmPermitsLast 12 moUsualMiddle halfFinished
Hobbs Electric Inc dba Electric Connection179176$1,287$1,287–$10,300—
Precision Electric Service Inc6160$1,000$1,000—
Norcal Wired Electrical Services4534$2,000$2,00084.6%
TNT Electric Co4531$4,684$4,000–$5,01271.2%
Cooper Electric2621$3,500$3,000–$4,0003 of 5
Dirk Helder Electric17520$1,500$1,500–$2,00024.8%
Bell Brothers Heating and Air Inc dba ABC Cooling1716$5,000$5,000—
Grounded Electric3015$3,888$1,750–$4,90087.4%
Grid Plus Electric2711$3,200$3,20091.6%
Hagan Electric179$5,350$4,700–$6,3508 of 8

Why filed values run low or high

  • The 10 busiest firms usually file $1,500; the 319 firms with fewer than 10 permits usually file $3,500.
  • One permit type covers small and large jobs: 1 in 10 electrical & panel permits is filed under $1,300 and 1 in 10 over $6,700, 5 times as much.
  • 99.4% of the 1,445 permits carry a value; the 8 without one are left out of every figure here.

Is your quote normal? Compare it with 1,437 filed values

Line your quote up against the file. In Citrus Heights, CA, 1 in 10 electrical & panel filed values sit under $1,300, the middle half between $1,500 and $4,500, and 1 in 10 over $6,700.

  • $8,700Above $6,700: higher than 9 in 10 filed values for this work in Citrus Heights, CA.
  • $3,000Right at the usual $3,000: in the middle of the file.
  • $900Below $1,300: lower than 9 in 10. Ask what the quote leaves out.

When to schedule electrical work in Citrus Heights, CA

Citrus Heights, CA files the fewest electrical & panel permits in December (60 against an average month of 100) and the most in June (158). If you can choose, ask for quotes in a quiet month. We have no prices by month, so this is about crews' schedules, not a discount. When each trade is busiest in Citrus Heights, CA →

How these numbers are made

Source: City of Citrus Heights building permits on homes (the city's issued-permits layer). The window is October 2023 through September 2026; a permit filed after that isn't here yet.

Usual is the middle permit: half were filed for less, half for more. Only permits with a filed value count; a value of $0 or none is left out.

The spread is approximate: we keep seven points of each firm's own range of filed values, not every permit, and pool them.

Nobody paid to be on this page and nobody can. How the records work in Citrus Heights, CA →

Common questions

  • How many quotes should I get for an electrical & panel job in Citrus Heights, CA?At least three. In the permit record the middle half of Citrus Heights, CA electrical & panel firms usually file between $2,500 and $4,500 a job, so two ordinary firms can sit 1.8 times apart and both be normal for Citrus Heights, CA. A third quote shows which one is the outlier. Filed values are what contractors wrote on permits, not quotes, so use them to judge the spread, not to price your own job.
  • What range is normal for electrical & panel jobs in Citrus Heights, CA?Half of permits were filed between $1,500 and $4,500; 8 in 10 between $1,300 and $6,700. These are approximate, pooled from each firm's own spread.
  • How much do electricians charge in Citrus Heights, CA?The usual electrical & panel job is filed at $3,000; the middle half of firms usually file between $2,500 and $4,500. The 10 firms with the most permits in the last 12 months usually file $1,500, less than the usual. See every firm's usual job →
  • How many electrical & panel firms work in Citrus Heights, CA?344 firms appear on the file; 182 pulled at least one permit in the last 12 months.
  • Where does this data come from?City of Citrus Heights building permits on homes (the city's issued-permits layer), read October 2026. How the records work in Citrus Heights, CA →

Electrical & Panel cost in other cities: Nashville Orlando Cleveland Pittsburgh Miami Colorado Springs Honolulu Boulder Saint Paul Arlington, VA Cambridge Somerville Cary Mesa Naperville Cape Coral Palo Alto Denton Burlington, VT Medford Elk Grove Wheaton, IL Marin County (unincorporated) Sacramento County (unincorporated)

Other job costs in Citrus Heights, CA: HVAC · Roofing · Water Heater · Remodel, Addition & Repair · Plumbing & Sewer · Solar & Battery · Windows & Doors · Patio Cover, Deck & Accessory Structure