How much does electrical work cost in Sacramento County? The usual electrical & panel job filed with Sacramento County is $3,800, from 4,027 priced permits (October 2023 through September 2026); the middle half of firms file between $3,000 and $4,650. A filed value is what the contractor wrote on the permit, not a quote or the final bill.
The usual electrical & panel job filed with Sacramento County is $3,800, from 4,027 priced permits, October 2023 through September 2026. The middle half of firms usually file between $3,000 and $4,650. Half of jobs were filed for less, half for more. A filed value is what the contractor wrote on the permit, not a quote or the final bill. An electrical & panel permit here usually takes 56 days from issue to final inspection. How long permits take →
Approximately, from each firm's own spread: every firm's range of filed values, weighted by its 4,027 priced permits across 922 firms, pooled into one. Half of Sacramento County (unincorporated) electrical & panel permits were filed between $2,500 and $5,000.
| Percentile | Filed value | Reads as |
|---|---|---|
| 10th | $1,300 | 1 in 10 permits filed below |
| 25th | $2,500 | 1 in 4 filed below |
| 50th | $3,800 | the middle permit |
| 75th | $5,000 | 1 in 4 filed above |
| 90th | $7,600 | 1 in 10 filed above |
Top 10 by permits in the last 12 months. Usual is each firm's middle filed value; middle half is the range its middle half of jobs were filed in. Busy is not the same as careful: pick what you value to build a list.
| Firm | Permits | Last 12 mo | Usual | Middle half | Finished |
|---|---|---|---|---|---|
| Cooper Electric | 150 | 101 | $4,000 | $4,000 | 50.7% |
| Bell Brother's Heating and Air Inc | 95 | 86 | $5,000 | $5,000 | 8 of 9 |
| TNT Electric Co | 95 | 61 | $4,863 | $4,225–$5,357 | 92.3% |
| Bonney Plumbing LLC | 171 | 58 | $7,828 | $6,889–$9,358 | 80.2% |
| Tak Broadband CA LLC | 51 | 51 | $630 | $630 | — |
| Gubrud's Electrical Contracting Inc | 82 | 36 | $2,000 | $2,000–$2,500 | 77.2% |
| High End Electric | 89 | 27 | $4,000 | $3,500–$4,925 | 90.9% |
| Ample Electric Inc | 41 | 24 | $1,400 | $1,300–$4,850 | 71.6% |
| Sagan Electric | 40 | 21 | $3,500 | $3,000–$4,462 | 95.4% |
| On-Time Air Conditioning & Heating LLC | 59 | 20 | $5,000 | $4,407–$9,448 | 70.2% |
Line your quote up against the file. In Sacramento County (unincorporated), 1 in 10 electrical & panel filed values sit under $1,300, the middle half between $2,500 and $5,000, and 1 in 10 over $7,600.
Sacramento County files the fewest electrical & panel permits in November (60 against an average month of 100) and the most in September (132). If you can choose, ask for quotes in a quiet month. We have no prices by month, so this is about crews' schedules, not a discount. When each trade is busiest in Sacramento County →
Source: Sacramento County building permits on single-family, duplex and townhouse homes in the unincorporated county (the County's Accela permit layer). The window is October 2023 through September 2026; a permit filed after that isn't here yet.
Usual is the middle permit: half were filed for less, half for more. Only permits with a filed value count; a value of $0 or none is left out.
The spread is approximate: we keep seven points of each firm's own range of filed values, not every permit, and pool them.
Nobody paid to be on this page and nobody can. How the records work in Sacramento County (unincorporated) →
Electrical & Panel cost in other cities: Nashville Orlando Cleveland Pittsburgh Miami Colorado Springs Honolulu Boulder Saint Paul Arlington, VA Cambridge Somerville Cary Mesa Naperville Cape Coral Palo Alto Denton Burlington, VT Seattle Medford Elk Grove Wheaton, IL Marin County (unincorporated) Citrus Heights, CA