Garage, shed and shade structure permits in Charlotte and the rest of Mecklenburg County, NC

Data through September 2026 · updated 26 Oct 2026

1,551 garage, shed and shade structure permits were issued in Charlotte and the rest of Mecklenburg County, June 2025 through September 2026: about 1,163 a year and 1% of all permits. The busiest month is April. The usual one took 113 days from issue to the county's final. 28078 has the most, 141.

1,551permits issued
1,179last 12 months
Aprbusiest month
113days, usual issue to final
73%finished
$22,000usual declared value
Sep 2026records through

Garage, shed and shade structure permits by month

Permits issued each month, June 2025 through September 2026.

Jun 2025: 91Jun2025Jul 2025: 81JulAug 2025: 82Sep 2025: 118Oct 2025: 114Nov 2025: 75Dec 2025: 82Jan 2026: 83Jan2026Feb 2026: 72Mar 2026: 92Apr 2026: 117May 2026: 96Jun 2026: 134Jul 2026: 119JulAug 2026: 97Sep 2026: 98
The same numbers as a table
MonthPermits
Jun 202591
Jul 202581
Aug 202582
Sep 2025118
Oct 2025114
Nov 202575
Dec 202582
Jan 202683
Feb 202672
Mar 202692
Apr 2026117
May 202696
Jun 2026134
Jul 2026119
Aug 202697
Sep 202698

Download this table (CSV)

When garage, shed and shade structure permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (121), February the quietest (74). A busy month at the permit counter usually means a longer wait for a contractor.

January: 86 (100 = an average month)February: 74 (100 = an average month)March: 95 (100 = an average month)April: 121 (100 = an average month)121May: 99 (100 = an average month)June: 116 (100 = an average month)July: 103 (100 = an average month)August: 92 (100 = an average month)September: 111 (100 = an average month)October: 118 (100 = an average month)November: 77 (100 = an average month)December: 85 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January86
February74
March95
April121
May99
June116
July103
August92
September111
October118
November77
December85

Download this table (CSV)

How long a garage, shed and shade structure permit takes

Permits issued Jun 2025–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 232 with a final date.

MeasureValue
Permits issued Jun 2025–Sep 2025372
Finished73.4%
Expired7.0%
Usual days, issue to final113
Middle half, days42–216

Download this table (CSV)

What a garage, shed and shade structure permit is declared at

The value written on the permit at application, from 1,546 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$22,000
Middle half$10,300–$59,788

Download this table (CSV)

ZIP codes with the most garage, shed and shade structure permits

Counted at the property's ZIP code. Share is the part of the county's 1,551 garage, shed and shade structure permits.

ZIP codePermitsShare
280781419%
280311188%
282141057%
28211986%
28226946%
28227916%
28277866%
28269795%
28205765%
28210725%

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Accessory - 328 - RESIDENTIAL - NEW ACCESSORY BLDG (SHEDS, BARNS)51533%
Alteration - 434 - RES DWELLING (ADD, ALTERATION, REPAIR, REPLACE)36924%
434 - Res Dwelling (Alteration, Repair, Replace)17111%
Accessory - 329 - RESIDENTIAL NEW STRUCTURES - NOT BLDGS (POOL, RETAINING WALL)1298%
434 - Res Accessory Bldg (Add, Alteration, Repair, Replace)805%
328 - Residential - New Accessory Bldg (sheds, barns)624%
Addition - 438 - RESIDENTIAL GARAGES / CARPORTS(ATTACHED OR DETACHED)604%
438 - Residential Garages / Carports(attached or detached)513%
Accessory - 329 - STRUCTURES OTHER THAN BUILDINGS(PIERS, POOLS, SIGNS, ETC)322%
329 - Residential New Structures - not bldgs (pool, retaining wall)242%

Download this table (CSV)

Nearby permit data

Garage, shed and shade structure permits for other places in Charlotte. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Mecklenburg County GIS, AccelaAllPermits FeatureServer layer 0, with the older BuildingPermits layer for permits still issued in the old system, read 26 Oct 2026. We count permits issued June 2025 through September 2026; denied and withdrawn permits are left out.

Building and trade permits that Mecklenburg County Code Enforcement issued anywhere in the county: Charlotte, the towns of Huntersville, Cornelius, Matthews, Mint Hill, Davidson and Pineville, and unincorporated land. The county issues building, electrical, mechanical and plumbing permits for every town, so this one file covers them all. Fire, sign and site-work permits count as other.

  • The county's file names no contractor, so there are no contractor lists, rankings or firm pages for Mecklenburg County or Charlotte.
  • The county moved its permits to a new system (Accela) in spring 2025. The window starts in June 2025, once the new system's file was filling at its usual rate, so it covers 16 months and there is no comparison with the 12 months before. Permits still issued under the old system for older projects come from the county's older building permit layer and are counted too.
  • Electrical, mechanical (HVAC) and plumbing permits are only in the new system's file. Each new home gets its own electrical, mechanical and plumbing permits, and those count under those trades. Monthly plumbing and electrical counts keep rising through early 2026 as projects started under the old system finish.
  • The new system files an equipment changeout as an umbrella record with separate mechanical, electrical or plumbing permits under it; we count the trade permits, not the umbrella record.
  • The kind of work comes from the county's type of work and census building code; roofing, solar, pools, additions and decks are picked out of residential alteration permits by their descriptions.
  • Job value is the building cost the applicant declared on the permit; most trade permits have none. A final date is the county's completion date.
  • Apartment, condo and hotel buildings count as other, not as homes. Cancelled, withdrawn and replaced permits are not counted.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Garage, shed and shade structure permits in Charlotte and the rest of Mecklenburg County, NC", https://contractorrecords.com/mecklenburg-county/accessory-permits, data through September 2026, from Mecklenburg County Code Enforcement building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Garages, sheds & shade structures permits by month · Garages, sheds & shade structures permits by calendar month (index) · Garages, sheds & shade structures permits: days to final · Garages, sheds & shade structures permits: declared value · Garages, sheds & shade structures permits by ZIP code · Garages, sheds & shade structures permits by permit type.

Common questions

  • How many garage, shed and shade structure permits does Mecklenburg County issue a year?About 1,163 a year in Charlotte and the rest of Mecklenburg County: 1,551 permits issued June 2025 through September 2026, 1,179 of them in the last 12 months.
  • How long does a garage, shed and shade structure permit take in Mecklenburg County?The usual one took 113 days from issue to the county's final inspection, and the middle half took 42 to 216 days (232 permits issued Jun 2025–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Mecklenburg County file the most garage, shed and shade structure permits?April (121 against an average month of 100); February is the quietest (74). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most garage, shed and shade structure permits in Mecklenburg County?28078, with 141 of the 1,551 (9%); then 28031 (118).