Solar permits in Charlotte and the rest of Mecklenburg County, NC

Data through September 2026 · updated 26 Oct 2026

507 solar permits were issued in Charlotte and the rest of Mecklenburg County, June 2025 through September 2026: about 380 a year and under 1% of all permits. The busiest month is October. The usual one took 52 days from issue to the county's final. 28205 has the most, 38.

507permits issued
340last 12 months
Octbusiest month
52days, usual issue to final
83%finished
$32,400usual declared value
Sep 2026records through

Solar permits by month

Permits issued each month, June 2025 through September 2026.

Jun 2025: 28Jun2025Jul 2025: 46JulAug 2025: 43Sep 2025: 50Oct 2025: 57Nov 2025: 37Dec 2025: 32Jan 2026: 25Jan2026Feb 2026: 20Mar 2026: 22Apr 2026: 35May 2026: 31Jun 2026: 25Jul 2026: 24JulAug 2026: 20Sep 2026: 12
The same numbers as a table
MonthPermits
Jun 202528
Jul 202546
Aug 202543
Sep 202550
Oct 202557
Nov 202537
Dec 202532
Jan 202625
Feb 202620
Mar 202622
Apr 202635
May 202631
Jun 202625
Jul 202624
Aug 202620
Sep 202612

Download this table (CSV)

When solar permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (180), February the quietest (63). A busy month at the permit counter usually means a longer wait for a contractor.

January: 79 (100 = an average month)February: 63 (100 = an average month)March: 69 (100 = an average month)April: 110 (100 = an average month)May: 98 (100 = an average month)June: 84 (100 = an average month)July: 110 (100 = an average month)August: 99 (100 = an average month)September: 98 (100 = an average month)October: 180 (100 = an average month)180November: 117 (100 = an average month)December: 101 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January79
February63
March69
April110
May98
June84
July110
August99
September98
October180
November117
December101

Download this table (CSV)

How long a solar permit takes

Permits issued Jun 2025–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 133 with a final date.

MeasureValue
Permits issued Jun 2025–Sep 2025167
Finished82.6%
Expired15.6%
Usual days, issue to final52
Middle half, days34–87

Download this table (CSV)

What a solar permit is declared at

The value written on the permit at application, from 505 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$32,400
Middle half$21,000–$40,958

Download this table (CSV)

ZIP codes with the most solar permits

Counted at the property's ZIP code. Share is the part of the county's 507 solar permits.

ZIP codePermitsShare
28205387%
28227377%
28278347%
28216326%
28036316%
28215306%
28269306%
28277265%
28214255%
28226245%

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
SolarPV - 434 - RES ACCESSORY BLDG (ADD, ALTERATION, REPAIR, REPLACE)48596%
SolarPV - 434 - RES DWELLING (ADD, ALTERATION, REPAIR, REPLACE)92%
Alteration - 434 - RES DWELLING (ADD, ALTERATION, REPAIR, REPLACE)71%
434 - Res Dwelling (Alteration, Repair, Replace)4under 1%
Addition - 434 - RES DWELLING (ADD, ALTERATION, REPAIR, REPLACE)2under 1%

Download this table (CSV)

How Mecklenburg County compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Solar permits for other places in Charlotte. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Mecklenburg County GIS, AccelaAllPermits FeatureServer layer 0, with the older BuildingPermits layer for permits still issued in the old system, read 26 Oct 2026. We count permits issued June 2025 through September 2026; denied and withdrawn permits are left out.

Building and trade permits that Mecklenburg County Code Enforcement issued anywhere in the county: Charlotte, the towns of Huntersville, Cornelius, Matthews, Mint Hill, Davidson and Pineville, and unincorporated land. The county issues building, electrical, mechanical and plumbing permits for every town, so this one file covers them all. Fire, sign and site-work permits count as other.

  • The county's file names no contractor, so there are no contractor lists, rankings or firm pages for Mecklenburg County or Charlotte.
  • The county moved its permits to a new system (Accela) in spring 2025. The window starts in June 2025, once the new system's file was filling at its usual rate, so it covers 16 months and there is no comparison with the 12 months before. Permits still issued under the old system for older projects come from the county's older building permit layer and are counted too.
  • Electrical, mechanical (HVAC) and plumbing permits are only in the new system's file. Each new home gets its own electrical, mechanical and plumbing permits, and those count under those trades. Monthly plumbing and electrical counts keep rising through early 2026 as projects started under the old system finish.
  • The new system files an equipment changeout as an umbrella record with separate mechanical, electrical or plumbing permits under it; we count the trade permits, not the umbrella record.
  • The kind of work comes from the county's type of work and census building code; roofing, solar, pools, additions and decks are picked out of residential alteration permits by their descriptions.
  • Job value is the building cost the applicant declared on the permit; most trade permits have none. A final date is the county's completion date.
  • Apartment, condo and hotel buildings count as other, not as homes. Cancelled, withdrawn and replaced permits are not counted.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Solar permits in Charlotte and the rest of Mecklenburg County, NC", https://contractorrecords.com/mecklenburg-county/solar-permits, data through September 2026, from Mecklenburg County Code Enforcement building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Solar permits by month · Solar permits by calendar month (index) · Solar permits: days to final · Solar permits: declared value · Solar permits by ZIP code · Solar permits by permit type.

Common questions

  • How many solar permits does Mecklenburg County issue a year?About 380 a year in Charlotte and the rest of Mecklenburg County: 507 permits issued June 2025 through September 2026, 340 of them in the last 12 months.
  • How long does a solar permit take in Mecklenburg County?The usual one took 52 days from issue to the county's final inspection, and the middle half took 34 to 87 days (133 permits issued Jun 2025–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Mecklenburg County file the most solar permits?October (180 against an average month of 100); February is the quietest (63). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most solar permits in Mecklenburg County?28205, with 38 of the 507 (7%); then 28227 (37).