Demolition permits in Charlotte and the rest of Mecklenburg County, NC

Data through September 2026 · updated 26 Oct 2026

1,500 demolition permits were issued in Charlotte and the rest of Mecklenburg County, June 2025 through September 2026: about 1,125 a year and 1% of all permits. The busiest month is September. The usual one took 59 days from issue to the county's final. 28205 has the most, 140.

1,500permits issued
1,126last 12 months
Sepbusiest month
59days, usual issue to final
70%finished
$11,075usual declared value
Sep 2026records through

Demolition permits by month

Permits issued each month, June 2025 through September 2026.

Jun 2025: 69Jun2025Jul 2025: 107JulAug 2025: 106Sep 2025: 92Oct 2025: 67Nov 2025: 47Dec 2025: 71Jan 2026: 82Jan2026Feb 2026: 71Mar 2026: 84Apr 2026: 113May 2026: 113Jun 2026: 127Jul 2026: 108JulAug 2026: 100Sep 2026: 143
The same numbers as a table
MonthPermits
Jun 202569
Jul 2025107
Aug 2025106
Sep 202592
Oct 202567
Nov 202547
Dec 202571
Jan 202682
Feb 202671
Mar 202684
Apr 2026113
May 2026113
Jun 2026127
Jul 2026108
Aug 2026100
Sep 2026143

Download this table (CSV)

When demolition permits are filed

By calendar month, 100 = an average month (the thin line). September is the busiest (125), November the quietest (50). A busy month at the permit counter usually means a longer wait for a contractor.

January: 87 (100 = an average month)February: 76 (100 = an average month)March: 90 (100 = an average month)April: 121 (100 = an average month)May: 121 (100 = an average month)June: 105 (100 = an average month)July: 115 (100 = an average month)August: 110 (100 = an average month)September: 125 (100 = an average month)125October: 71 (100 = an average month)November: 50 (100 = an average month)December: 76 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January87
February76
March90
April121
May121
June105
July115
August110
September125
October71
November50
December76

Download this table (CSV)

How long a demolition permit takes

Permits issued Jun 2025–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 262 with a final date.

MeasureValue
Permits issued Jun 2025–Sep 2025374
Finished70.1%
Expired28.6%
Usual days, issue to final59
Middle half, days25–125

Download this table (CSV)

What a demolition permit is declared at

The value written on the permit at application, from 1,251 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$11,075
Middle half$6,000–$20,000

Download this table (CSV)

ZIP codes with the most demolition permits

Counted at the property's ZIP code. Share is the part of the county's 1,500 demolition permits.

ZIP codePermitsShare
282051409%
282111409%
282081299%
282091228%
28216755%
28214695%
28226594%
28078574%
28210564%
28270564%

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Demolition - 645 - ONE FAMILY90060%
StandaloneBuilding - 649 - COMMERCIAL BLDG OR STRUCTURE - DEMOLITION ENTIRE BLDG1349%
Demolition - 649 - COMMERCIAL BLDG OR STRUCTURE - DEMOLITION ENTIRE BLDG1208%
Demolition - 649 - RESIDENTIAL ACCESSORY STRUCTURE - DEMOLITION ENTIRE BLDG1027%
Demolition - 437 - COMMERCIAL - NO PLAN REVIEW (SMALL CTAC PROJECTS)1017%
Demolition856%
Demolition - 101 - ONE FAMILY DETACHED221%
645 - One Family14under 1%
Demolition - 646 - TWO FAMILY6under 1%
Fire - 649 - COMMERCIAL BLDG OR STRUCTURE - DEMOLITION ENTIRE BLDG6under 1%

Download this table (CSV)

Nearby permit data

Demolition permits for other places in Charlotte. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Mecklenburg County GIS, AccelaAllPermits FeatureServer layer 0, with the older BuildingPermits layer for permits still issued in the old system, read 26 Oct 2026. We count permits issued June 2025 through September 2026; denied and withdrawn permits are left out.

Building and trade permits that Mecklenburg County Code Enforcement issued anywhere in the county: Charlotte, the towns of Huntersville, Cornelius, Matthews, Mint Hill, Davidson and Pineville, and unincorporated land. The county issues building, electrical, mechanical and plumbing permits for every town, so this one file covers them all. Fire, sign and site-work permits count as other.

  • The county's file names no contractor, so there are no contractor lists, rankings or firm pages for Mecklenburg County or Charlotte.
  • The county moved its permits to a new system (Accela) in spring 2025. The window starts in June 2025, once the new system's file was filling at its usual rate, so it covers 16 months and there is no comparison with the 12 months before. Permits still issued under the old system for older projects come from the county's older building permit layer and are counted too.
  • Electrical, mechanical (HVAC) and plumbing permits are only in the new system's file. Each new home gets its own electrical, mechanical and plumbing permits, and those count under those trades. Monthly plumbing and electrical counts keep rising through early 2026 as projects started under the old system finish.
  • The new system files an equipment changeout as an umbrella record with separate mechanical, electrical or plumbing permits under it; we count the trade permits, not the umbrella record.
  • The kind of work comes from the county's type of work and census building code; roofing, solar, pools, additions and decks are picked out of residential alteration permits by their descriptions.
  • Job value is the building cost the applicant declared on the permit; most trade permits have none. A final date is the county's completion date.
  • Apartment, condo and hotel buildings count as other, not as homes. Cancelled, withdrawn and replaced permits are not counted.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Demolition permits in Charlotte and the rest of Mecklenburg County, NC", https://contractorrecords.com/mecklenburg-county/demolition-permits, data through September 2026, from Mecklenburg County Code Enforcement building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Demolition permits by month · Demolition permits by calendar month (index) · Demolition permits: days to final · Demolition permits: declared value · Demolition permits by ZIP code · Demolition permits by permit type.

Common questions

  • How many demolition permits does Mecklenburg County issue a year?About 1,125 a year in Charlotte and the rest of Mecklenburg County: 1,500 permits issued June 2025 through September 2026, 1,126 of them in the last 12 months.
  • How long does a demolition permit take in Mecklenburg County?The usual one took 59 days from issue to the county's final inspection, and the middle half took 25 to 125 days (262 permits issued Jun 2025–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Mecklenburg County file the most demolition permits?September (125 against an average month of 100); November is the quietest (50). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most demolition permits in Mecklenburg County?28205, with 140 of the 1,500 (9%); then 28211 (140).