Contractor Records
Home › Mecklenburg County › Pools & spas

Pool and spa permits in Charlotte and the rest of Mecklenburg County, NC

Data through September 2026 · updated 26 Oct 2026

1,146 pool and spa permits were issued in Charlotte and the rest of Mecklenburg County, June 2025 through September 2026: about 860 a year and under 1% of all permits. The busiest month is May. The usual one took 236 days from issue to the county's final. 28078 has the most, 144.

1,146permits issued
876last 12 months
Maybusiest month
236days, usual issue to final
73%finished
$105,000usual declared value
Sep 2026records through

Pool and spa permits by month

Permits issued each month, June 2025 through September 2026.

Jun 2025: 52Jun2025Jul 2025: 61JulAug 2025: 89Sep 2025: 68Oct 2025: 73Nov 2025: 48Dec 2025: 70Jan 2026: 46Jan2026Feb 2026: 65Mar 2026: 81Apr 2026: 84May 2026: 85Jun 2026: 85Jul 2026: 77JulAug 2026: 72Sep 2026: 90
The same numbers as a table
MonthPermits
Jun 202552
Jul 202561
Aug 202589
Sep 202568
Oct 202573
Nov 202548
Dec 202570
Jan 202646
Feb 202665
Mar 202681
Apr 202684
May 202685
Jun 202685
Jul 202677
Aug 202672
Sep 202690

Download this table (CSV)

When pool and spa permits are filed

By calendar month, 100 = an average month (the thin line). May is the busiest (119), January the quietest (64). A busy month at the permit counter usually means a longer wait for a contractor.

January: 64 (100 = an average month)February: 91 (100 = an average month)March: 113 (100 = an average month)April: 117 (100 = an average month)May: 119 (100 = an average month)119June: 96 (100 = an average month)July: 96 (100 = an average month)August: 112 (100 = an average month)September: 110 (100 = an average month)October: 102 (100 = an average month)November: 67 (100 = an average month)December: 98 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January64
February91
March113
April117
May119
June96
July96
August112
September110
October102
November67
December98

Download this table (CSV)

How long a pool and spa permit takes

Permits issued Jun 2025–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 197 with a final date.

MeasureValue
Permits issued Jun 2025–Sep 2025270
Finished73.0%
Expired6.7%
Usual days, issue to final236
Middle half, days139–325

Download this table (CSV)

What a pool and spa permit is declared at

The value written on the permit at application, from 1,144 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$105,000
Middle half$75,206–$129,670

Download this table (CSV)

ZIP codes with the most pool and spa permits

Counted at the property's ZIP code. Share is the part of the county's 1,146 pool and spa permits.

ZIP codePermitsShare
2807814413%
2821112511%
280311079%
282261029%
28270908%
28209787%
28036656%
28277646%
28205565%
28227454%

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
PoolSpa - 329 - STRUCTURES OTHER THAN BUILDINGS(PIERS, POOLS, SIGNS, ETC)98786%
Accessory - 328 - RESIDENTIAL - NEW ACCESSORY BLDG (SHEDS, BARNS)504%
329 - Residential New Structures - not bldgs (pool, retaining wall)252%
434 - Res Dwelling (Alteration, Repair, Replace)212%
Addition - 434 - RES DWELLING (ADD, ALTERATION, REPAIR, REPLACE)161%
Alteration - 434 - RES DWELLING (ADD, ALTERATION, REPAIR, REPLACE)161%
Accessory - 329 - RESIDENTIAL NEW STRUCTURES - NOT BLDGS (POOL, RETAINING WALL)9under 1%
329 - Structures other than Buildings(piers, pools, signs, etc)8under 1%
328 - Residential - New Accessory Bldg (sheds, barns)4under 1%
434 - Res Accessory Bldg (Add, Alteration, Repair, Replace)3under 1%

Download this table (CSV)

Nearby permit data

Pool and spa permits for other places in Charlotte. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Mecklenburg County GIS, AccelaAllPermits FeatureServer layer 0, with the older BuildingPermits layer for permits still issued in the old system, read 26 Oct 2026. We count permits issued June 2025 through September 2026; denied and withdrawn permits are left out.

Building and trade permits that Mecklenburg County Code Enforcement issued anywhere in the county: Charlotte, the towns of Huntersville, Cornelius, Matthews, Mint Hill, Davidson and Pineville, and unincorporated land. The county issues building, electrical, mechanical and plumbing permits for every town, so this one file covers them all. Fire, sign and site-work permits count as other.

  • The county's file names no contractor, so there are no contractor lists, rankings or firm pages for Mecklenburg County or Charlotte.
  • The county moved its permits to a new system (Accela) in spring 2025. The window starts in June 2025, once the new system's file was filling at its usual rate, so it covers 16 months and there is no comparison with the 12 months before. Permits still issued under the old system for older projects come from the county's older building permit layer and are counted too.
  • Electrical, mechanical (HVAC) and plumbing permits are only in the new system's file. Each new home gets its own electrical, mechanical and plumbing permits, and those count under those trades. Monthly plumbing and electrical counts keep rising through early 2026 as projects started under the old system finish.
  • The new system files an equipment changeout as an umbrella record with separate mechanical, electrical or plumbing permits under it; we count the trade permits, not the umbrella record.
  • The kind of work comes from the county's type of work and census building code; roofing, solar, pools, additions and decks are picked out of residential alteration permits by their descriptions.
  • Job value is the building cost the applicant declared on the permit; most trade permits have none. A final date is the county's completion date.
  • Apartment, condo and hotel buildings count as other, not as homes. Cancelled, withdrawn and replaced permits are not counted.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Pool and spa permits in Charlotte and the rest of Mecklenburg County, NC", https://contractorrecords.com/mecklenburg-county/pool-permits, data through September 2026, from Mecklenburg County Code Enforcement building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Pools & spas permits by month · Pools & spas permits by calendar month (index) · Pools & spas permits: days to final · Pools & spas permits: declared value · Pools & spas permits by ZIP code · Pools & spas permits by permit type.

Common questions

  • How many pool and spa permits does Mecklenburg County issue a year?About 860 a year in Charlotte and the rest of Mecklenburg County: 1,146 permits issued June 2025 through September 2026, 876 of them in the last 12 months.
  • How long does a pool and spa permit take in Mecklenburg County?The usual one took 236 days from issue to the county's final inspection, and the middle half took 139 to 325 days (197 permits issued Jun 2025–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Mecklenburg County file the most pool and spa permits?May (119 against an average month of 100); January is the quietest (64). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most pool and spa permits in Mecklenburg County?28078, with 144 of the 1,146 (13%); then 28211 (125).