Contractor Records
Home › Mecklenburg County › Remodels & repairs

Remodel and repair permits in Charlotte and the rest of Mecklenburg County, NC

Data through September 2026 · updated 26 Oct 2026

4,506 remodel and repair permits were issued in Charlotte and the rest of Mecklenburg County, June 2025 through September 2026: about 3,380 a year and 3% of all permits. The busiest month is March. The usual one took 87 days from issue to the county's final. 28226 has the most, 419.

4,506permits issued
3,314last 12 months
Marbusiest month
87days, usual issue to final
72%finished
$23,392usual declared value
Sep 2026records through

Remodel and repair permits by month

Permits issued each month, June 2025 through September 2026.

Jun 2025: 274Jun2025Jul 2025: 306JulAug 2025: 296Sep 2025: 316Oct 2025: 302Nov 2025: 253Dec 2025: 237Jan 2026: 270Jan2026Feb 2026: 280Mar 2026: 302Apr 2026: 278May 2026: 259Jun 2026: 303Jul 2026: 269JulAug 2026: 272Sep 2026: 289
The same numbers as a table
MonthPermits
Jun 2025274
Jul 2025306
Aug 2025296
Sep 2025316
Oct 2025302
Nov 2025253
Dec 2025237
Jan 2026270
Feb 2026280
Mar 2026302
Apr 2026278
May 2026259
Jun 2026303
Jul 2026269
Aug 2026272
Sep 2026289

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). March is the busiest (107), December the quietest (84). A busy month at the permit counter usually means a longer wait for a contractor.

January: 96 (100 = an average month)February: 99 (100 = an average month)March: 107 (100 = an average month)107April: 99 (100 = an average month)May: 92 (100 = an average month)June: 102 (100 = an average month)July: 102 (100 = an average month)August: 101 (100 = an average month)September: 107 (100 = an average month)October: 107 (100 = an average month)November: 90 (100 = an average month)December: 84 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January96
February99
March107
April99
May92
June102
July102
August101
September107
October107
November90
December84

Download this table (CSV)

How long a remodel and repair permit takes

Permits issued Jun 2025–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 777 with a final date.

MeasureValue
Permits issued Jun 2025–Sep 20251,192
Finished71.6%
Expired18.9%
Usual days, issue to final87
Middle half, days42–157

Download this table (CSV)

What a remodel and repair permit is declared at

The value written on the permit at application, from 4,470 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$23,392
Middle half$9,675–$48,000

Download this table (CSV)

ZIP codes with the most remodel and repair permits

Counted at the property's ZIP code. Share is the part of the county's 4,506 remodel and repair permits.

ZIP codePermitsShare
282264199%
282774009%
282103458%
282113077%
282702666%
280782546%
282052395%
281052105%
280311954%
282271654%

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Alteration - 434 - RES DWELLING (ADD, ALTERATION, REPAIR, REPLACE)4,12592%
434 - Res Dwelling (Alteration, Repair, Replace)3528%
Alteration - 434 - RES DWELLING - CO REQUIRED (ADD, ALTERATION, REPAIR)6under 1%
StandaloneBuilding - 434 - RES DWELLING (ADD, ALTERATION, REPAIR, REPLACE)6under 1%
Accessory - 434 - RES ACCESSORY BLDG (ADD, ALTERATION, REPAIR, REPLACE)6under 1%
New - 434 - RES DWELLING (ADD, ALTERATION, REPAIR, REPLACE)4under 1%
434 - Res Dwelling - CO required (Add, Alteration, Repair)3under 1%
New - 434 - RES DWELLING - CO REQUIRED (ADD, ALTERATION, REPAIR)2under 1%
Accessory - 434 - RES DWELLING (ADD, ALTERATION, REPAIR, REPLACE)1under 1%
Alteration - 434 - RES ACCESSORY BLDG (ADD, ALTERATION, REPAIR, REPLACE)1under 1%

Download this table (CSV)

How Mecklenburg County compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Remodel and repair permits for other places in Charlotte. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Mecklenburg County GIS, AccelaAllPermits FeatureServer layer 0, with the older BuildingPermits layer for permits still issued in the old system, read 26 Oct 2026. We count permits issued June 2025 through September 2026; denied and withdrawn permits are left out.

Building and trade permits that Mecklenburg County Code Enforcement issued anywhere in the county: Charlotte, the towns of Huntersville, Cornelius, Matthews, Mint Hill, Davidson and Pineville, and unincorporated land. The county issues building, electrical, mechanical and plumbing permits for every town, so this one file covers them all. Fire, sign and site-work permits count as other.

  • The county's file names no contractor, so there are no contractor lists, rankings or firm pages for Mecklenburg County or Charlotte.
  • The county moved its permits to a new system (Accela) in spring 2025. The window starts in June 2025, once the new system's file was filling at its usual rate, so it covers 16 months and there is no comparison with the 12 months before. Permits still issued under the old system for older projects come from the county's older building permit layer and are counted too.
  • Electrical, mechanical (HVAC) and plumbing permits are only in the new system's file. Each new home gets its own electrical, mechanical and plumbing permits, and those count under those trades. Monthly plumbing and electrical counts keep rising through early 2026 as projects started under the old system finish.
  • The new system files an equipment changeout as an umbrella record with separate mechanical, electrical or plumbing permits under it; we count the trade permits, not the umbrella record.
  • The kind of work comes from the county's type of work and census building code; roofing, solar, pools, additions and decks are picked out of residential alteration permits by their descriptions.
  • Job value is the building cost the applicant declared on the permit; most trade permits have none. A final date is the county's completion date.
  • Apartment, condo and hotel buildings count as other, not as homes. Cancelled, withdrawn and replaced permits are not counted.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in Charlotte and the rest of Mecklenburg County, NC", https://contractorrecords.com/mecklenburg-county/remodel-permits, data through September 2026, from Mecklenburg County Code Enforcement building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: days to final · Remodels & repairs permits: declared value · Remodels & repairs permits by ZIP code · Remodels & repairs permits by permit type.

Common questions

  • How many remodel and repair permits does Mecklenburg County issue a year?About 3,380 a year in Charlotte and the rest of Mecklenburg County: 4,506 permits issued June 2025 through September 2026, 3,314 of them in the last 12 months.
  • How long does a remodel and repair permit take in Mecklenburg County?The usual one took 87 days from issue to the county's final inspection, and the middle half took 42 to 157 days (777 permits issued Jun 2025–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Mecklenburg County file the most remodel and repair permits?March (107 against an average month of 100); December is the quietest (84). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most remodel and repair permits in Mecklenburg County?28226, with 419 of the 4,506 (9%); then 28277 (400).