Contractor Records
Home › Miami Beach › Fences & walls

Fence and wall permits in the City of Miami Beach, FL

Data through September 2026 · updated 20 Oct 2026

537 fence and wall permits were issued in the City of Miami Beach, October 2024 through September 2026: about 268 a year and 3% of all permits. 266 fence and wall permits in the last 12 months (Oct 2025–Sep 2026), about the same as the 271 in the 12 months before. The busiest month is April. The usual one took 98 days from issue to the city's final. 33140 has the most, 236.

537permits issued
266last 12 months
Aprbusiest month
98days, usual issue to final
74%finished
Sep 2026records through

Fence and wall permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 23Oct2024Nov 2024: 25Dec 2024: 22Jan 2025: 19Jan2025Feb 2025: 27Mar 2025: 26Apr 2025: 35May 2025: 15Jun 2025: 21Jul 2025: 17JulAug 2025: 26Sep 2025: 15Oct 2025: 28Nov 2025: 13Dec 2025: 22Jan 2026: 26Jan2026Feb 2026: 17Mar 2026: 20Apr 2026: 21May 2026: 28Jun 2026: 20Jul 2026: 22JulAug 2026: 29Sep 2026: 20
The same numbers as a table
MonthPermits
Oct 202423
Nov 202425
Dec 202422
Jan 202519
Feb 202527
Mar 202526
Apr 202535
May 202515
Jun 202521
Jul 202517
Aug 202526
Sep 202515
Oct 202528
Nov 202513
Dec 202522
Jan 202626
Feb 202617
Mar 202620
Apr 202621
May 202628
Jun 202620
Jul 202622
Aug 202629
Sep 202620

Download this table (CSV)

When fence and wall permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (125), September the quietest (78). A busy month at the permit counter usually means a longer wait for a contractor.

January: 101 (100 = an average month)February: 98 (100 = an average month)March: 103 (100 = an average month)April: 125 (100 = an average month)125May: 96 (100 = an average month)June: 92 (100 = an average month)July: 87 (100 = an average month)August: 123 (100 = an average month)September: 78 (100 = an average month)October: 114 (100 = an average month)November: 85 (100 = an average month)December: 98 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January101
February98
March103
April125
May96
June92
July87
August123
September78
October114
November85
December98

Download this table (CSV)

How long a fence and wall permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 199 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025271
Finished73.8%
Expired9.6%
Usual days, issue to final98
Middle half, days43–200

Download this table (CSV)

ZIP codes with the most fence and wall permits

Counted at the property's ZIP code. Share is the part of the city's 537 fence and wall permits.

ZIP codePermitsShare
3314023644%
3313916731%
3314113225%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Building - Residential - Fence35266%
Building - Commercial - Fence13926%
Building Sub Permit Residential Fence407%
Building Sub Permit Commercial Fence61%

Download this table (CSV)

Nearby permit data

Fence and wall permits for other places in South Florida. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Miami Beach Civic Access (EnerGov) public permit search, read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Miami Beach Building Department issues inside the city limits only. The City of Miami, Surfside, Bal Harbour and unincorporated Miami-Dade County run their own permit offices and are not in this file.

  • The city's public permit search names no contractor, so there are no contractor lists, rankings or firm pages for Miami Beach.
  • The search rows carry no job value, so we show no costs.
  • Trade work on a larger job is often filed as its own sub-permit (electrical, plumbing, mechanical), so one job can count several times.
  • Homes are permits the city files as single-family or duplex work, plus interior work inside a single condominium unit. Work on a whole condominium building is filed as commercial and is not counted as homes.
  • Revisions, certificates of occupancy, parking-space rentals, roll-off dumpsters, special events and right-of-way permits are left out.
  • A final date is the date the permit was finaled or closed.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Fence and wall permits in the City of Miami Beach, FL", https://contractorrecords.com/miami-beach/fence-permits, data through September 2026, from the City of Miami Beach Building Department building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): Fences & walls permits by month · Fences & walls permits by calendar month (index) · Fences & walls permits: days to final · Fences & walls permits by ZIP code · Fences & walls permits by permit type.

Common questions

  • How many fence and wall permits does Miami Beach issue a year?About 268 a year in the City of Miami Beach: 537 permits issued October 2024 through September 2026, 266 of them in the last 12 months.
  • How long does a fence and wall permit take in Miami Beach?The usual one took 98 days from issue to the city's final inspection, and the middle half took 43 to 200 days (199 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Miami Beach file the most fence and wall permits?April (125 against an average month of 100); September is the quietest (78). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most fence and wall permits in Miami Beach?33140, with 236 of the 537 (44%); then 33139 (167).