Electrical permits in the City of Miami Beach, FL

Data through September 2026 · updated 20 Oct 2026

4,032 electrical permits were issued in the City of Miami Beach, October 2024 through September 2026: about 2,016 a year and 20% of all permits. 1,978 electrical permits in the last 12 months (Oct 2025–Sep 2026), 4% fewer than the 2,054 in the 12 months before. The busiest month is March. The usual one took 132 days from issue to the city's final. 33139 has the most, 1,885.

4,032permits issued
1,978last 12 months
Marbusiest month
132days, usual issue to final
79%finished
Sep 2026records through

Electrical permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 194Oct2024Nov 2024: 144Dec 2024: 157Jan 2025: 157Jan2025Feb 2025: 143Mar 2025: 196Apr 2025: 183May 2025: 159Jun 2025: 173Jul 2025: 179JulAug 2025: 183Sep 2025: 186Oct 2025: 175Nov 2025: 148Dec 2025: 141Jan 2026: 159Jan2026Feb 2026: 187Mar 2026: 187Apr 2026: 132May 2026: 147Jun 2026: 160Jul 2026: 182JulAug 2026: 196Sep 2026: 164
The same numbers as a table
MonthPermits
Oct 2024194
Nov 2024144
Dec 2024157
Jan 2025157
Feb 2025143
Mar 2025196
Apr 2025183
May 2025159
Jun 2025173
Jul 2025179
Aug 2025183
Sep 2025186
Oct 2025175
Nov 2025148
Dec 2025141
Jan 2026159
Feb 2026187
Mar 2026187
Apr 2026132
May 2026147
Jun 2026160
Jul 2026182
Aug 2026196
Sep 2026164

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). March is the busiest (114), November the quietest (87). A busy month at the permit counter usually means a longer wait for a contractor.

January: 94 (100 = an average month)February: 98 (100 = an average month)March: 114 (100 = an average month)114April: 94 (100 = an average month)May: 91 (100 = an average month)June: 99 (100 = an average month)July: 107 (100 = an average month)August: 113 (100 = an average month)September: 104 (100 = an average month)October: 110 (100 = an average month)November: 87 (100 = an average month)December: 89 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January94
February98
March114
April94
May91
June99
July107
August113
September104
October110
November87
December89

Download this table (CSV)

How long an electrical permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 1,611 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20252,054
Finished78.8%
Expired4.4%
Usual days, issue to final132
Middle half, days50–247

Download this table (CSV)

ZIP codes with the most electrical permits

Counted at the property's ZIP code. Share is the part of the city's 4,032 electrical permits.

ZIP codePermitsShare
331391,88547%
331401,32233%
3314179520%
3310913under 1%
331542under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Sub-Permit- Commercial - Electrical - New Installations (including condominiums)78019%
Electrical Sub-Permit Commercial General Primary Sub Permit56414%
Sub-Permit- Commercial - Electrical - Alterations (including condominiums)46211%
Sub-Permit- Residential - Electrical - New Installations (single family or duplex)39910%
Electrical - Commercial - Alteration39510%
Electrical Sub-Permit Residential General Primary Sub Permit2165%
Electrical - Commercial - Low Voltage2105%
Electrical - Commercial - New2065%
Electrical - Residential - Temp Power1704%
Electrical - Commercial - Temp Power962%

Download this table (CSV)

How Miami Beach compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Electrical permits for other places in South Florida. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Miami Beach Civic Access (EnerGov) public permit search, read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Miami Beach Building Department issues inside the city limits only. The City of Miami, Surfside, Bal Harbour and unincorporated Miami-Dade County run their own permit offices and are not in this file.

  • The city's public permit search names no contractor, so there are no contractor lists, rankings or firm pages for Miami Beach.
  • The search rows carry no job value, so we show no costs.
  • Trade work on a larger job is often filed as its own sub-permit (electrical, plumbing, mechanical), so one job can count several times.
  • Homes are permits the city files as single-family or duplex work, plus interior work inside a single condominium unit. Work on a whole condominium building is filed as commercial and is not counted as homes.
  • Revisions, certificates of occupancy, parking-space rentals, roll-off dumpsters, special events and right-of-way permits are left out.
  • A final date is the date the permit was finaled or closed.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in the City of Miami Beach, FL", https://contractorrecords.com/miami-beach/electrical-permits, data through September 2026, from the City of Miami Beach Building Department building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: days to final · Electrical permits by ZIP code · Electrical permits by permit type.

Common questions

  • How many electrical permits does Miami Beach issue a year?About 2,016 a year in the City of Miami Beach: 4,032 permits issued October 2024 through September 2026, 1,978 of them in the last 12 months.
  • How long does an electrical permit take in Miami Beach?The usual one took 132 days from issue to the city's final inspection, and the middle half took 50 to 247 days (1,611 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Miami Beach file the most electrical permits?March (114 against an average month of 100); November is the quietest (87). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most electrical permits in Miami Beach?33139, with 1,885 of the 4,032 (47%); then 33140 (1,322).