Contractor Records
Home › Miami Beach › Pools & spas

Pool and spa permits in the City of Miami Beach, FL

Data through September 2026 · updated 20 Oct 2026

289 pool and spa permits were issued in the City of Miami Beach, October 2024 through September 2026: about 144 a year and 1% of all permits. 139 pool and spa permits in the last 12 months (Oct 2025–Sep 2026), 7% fewer than the 150 in the 12 months before. The busiest month is January. The usual one took 325 days from issue to the city's final. 33140 has the most, 136.

289permits issued
139last 12 months
Janbusiest month
325days, usual issue to final
52%finished
Sep 2026records through

Pool and spa permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 15Oct2024Nov 2024: 12Dec 2024: 17Jan 2025: 18Jan2025Feb 2025: 12Mar 2025: 7Apr 2025: 14May 2025: 13Jun 2025: 15Jul 2025: 5JulAug 2025: 9Sep 2025: 13Oct 2025: 11Nov 2025: 15Dec 2025: 10Jan 2026: 18Jan2026Feb 2026: 12Mar 2026: 11Apr 2026: 10May 2026: 20Jun 2026: 11Jul 2026: 4JulAug 2026: 8Sep 2026: 9
The same numbers as a table
MonthPermits
Oct 202415
Nov 202412
Dec 202417
Jan 202518
Feb 202512
Mar 20257
Apr 202514
May 202513
Jun 202515
Jul 20255
Aug 20259
Sep 202513
Oct 202511
Nov 202515
Dec 202510
Jan 202618
Feb 202612
Mar 202611
Apr 202610
May 202620
Jun 202611
Jul 20264
Aug 20268
Sep 20269

Download this table (CSV)

When pool and spa permits are filed

By calendar month, 100 = an average month (the thin line). January is the busiest (149), July the quietest (37). A busy month at the permit counter usually means a longer wait for a contractor.

January: 149 (100 = an average month)149February: 100 (100 = an average month)March: 75 (100 = an average month)April: 100 (100 = an average month)May: 137 (100 = an average month)June: 108 (100 = an average month)July: 37 (100 = an average month)August: 71 (100 = an average month)September: 91 (100 = an average month)October: 108 (100 = an average month)November: 112 (100 = an average month)December: 112 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January149
February100
March75
April100
May137
June108
July37
August71
September91
October108
November112
December112

Download this table (CSV)

How long a pool and spa permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 78 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025150
Finished52.0%
Expired8.0%
Usual days, issue to final325
Middle half, days152–463

Download this table (CSV)

ZIP codes with the most pool and spa permits

Counted at the property's ZIP code. Share is the part of the city's 289 pool and spa permits.

ZIP codePermitsShare
3314013647%
331397827%
331417526%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential (Single-Family) - New Pool20471%
Commercial Buildings (Including Condo) - Pool - Alteration4415%
Commercial Buildings (Including Condo) - New Pool228%
Residential (Single-Family) - Pool Alteration197%

Download this table (CSV)

Nearby permit data

Pool and spa permits for other places in South Florida. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Miami Beach Civic Access (EnerGov) public permit search, read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Miami Beach Building Department issues inside the city limits only. The City of Miami, Surfside, Bal Harbour and unincorporated Miami-Dade County run their own permit offices and are not in this file.

  • The city's public permit search names no contractor, so there are no contractor lists, rankings or firm pages for Miami Beach.
  • The search rows carry no job value, so we show no costs.
  • Trade work on a larger job is often filed as its own sub-permit (electrical, plumbing, mechanical), so one job can count several times.
  • Homes are permits the city files as single-family or duplex work, plus interior work inside a single condominium unit. Work on a whole condominium building is filed as commercial and is not counted as homes.
  • Revisions, certificates of occupancy, parking-space rentals, roll-off dumpsters, special events and right-of-way permits are left out.
  • A final date is the date the permit was finaled or closed.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Pool and spa permits in the City of Miami Beach, FL", https://contractorrecords.com/miami-beach/pool-permits, data through September 2026, from the City of Miami Beach Building Department building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): Pools & spas permits by month · Pools & spas permits by calendar month (index) · Pools & spas permits: days to final · Pools & spas permits by ZIP code · Pools & spas permits by permit type.

Common questions

  • How many pool and spa permits does Miami Beach issue a year?About 144 a year in the City of Miami Beach: 289 permits issued October 2024 through September 2026, 139 of them in the last 12 months.
  • How long does a pool and spa permit take in Miami Beach?The usual one took 325 days from issue to the city's final inspection, and the middle half took 152 to 463 days (78 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Miami Beach file the most pool and spa permits?January (149 against an average month of 100); July is the quietest (37). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most pool and spa permits in Miami Beach?33140, with 136 of the 289 (47%); then 33139 (78).