Contractor Records
Home › Miami Beach › ZIP 33141

Building permits in 33141, the City of Miami Beach

Data through September 2026 · updated 20 Oct 2026

4,111 building permits were issued in ZIP code 33141 by the City of Miami Beach Building Department, October 2024 through September 2026: 20% of the 20,401 in the City of Miami Beach, the 3rd busiest ZIP code. Electrical permits lead with 795. 2,120 permits in the last 12 months (Oct 2025–Sep 2026), 6% more than the 1,991 in the 12 months before. Permits from a city that runs its own permit office are not counted.

4,111permits in 33141
2,120last 12 months
40%for homes
111days, usual issue to final
Sep 2026records through

Permits in 33141 by kind of work

Share here is the part of the 4,111 permits in 33141; citywide is the same for all of the City of Miami Beach.

Kind of workPermitsShare hereCitywide
Electrical79519%20%
Plumbing65216%17%
Remodels & repairs55113%13%
HVAC40910%13%
Roofing3067%6%
Fences & walls1323%3%
Demolition1033%2%
Pools & spas752%1%
New homes36under 1%under 1%
Garages, sheds & shade structures19under 1%under 1%
Solar13under 1%under 1%
Additions3under 1%under 1%
Other1,01725%25%

Download this table (CSV)

Permits in 33141 by year

Permits issued in each calendar year of the window.

YearMonthsPermitsPer year
2024 (from October)34831,932
2025121,9901,990
2026 (through September)91,6382,184

Download this table (CSV)

How permits in 33141 finish

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

Measure33141Citywide
Permits issued Oct 2024–Sep 20251,99110,513
Finished79.4%79.0%
Expired4.2%4.8%
Usual days, issue to final111118

Download this table (CSV)

How these numbers are made

Source: City of Miami Beach Civic Access (EnerGov) public permit search, read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Miami Beach Building Department issues inside the city limits only. The City of Miami, Surfside, Bal Harbour and unincorporated Miami-Dade County run their own permit offices and are not in this file.

  • The city's public permit search names no contractor, so there are no contractor lists, rankings or firm pages for Miami Beach.
  • The search rows carry no job value, so we show no costs.
  • Trade work on a larger job is often filed as its own sub-permit (electrical, plumbing, mechanical), so one job can count several times.
  • Homes are permits the city files as single-family or duplex work, plus interior work inside a single condominium unit. Work on a whole condominium building is filed as commercial and is not counted as homes.
  • Revisions, certificates of occupancy, parking-space rentals, roll-off dumpsters, special events and right-of-way permits are left out.
  • A final date is the date the permit was finaled or closed.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Building permits in 33141, the City of Miami Beach", https://contractorrecords.com/miami-beach/zip/33141, data through September 2026, from the City of Miami Beach Building Department building-permit records.

Link to a table: By kind of work · By year · How permits finish.

Download the tables (CSV): Permits in 33141 by kind of work · Permits in 33141 by year · Permits in 33141: finished and days to final.

Common questions

  • How many building permits were issued in 33141?4,111 permits issued by the city in ZIP code 33141, October 2024 through September 2026: 795 electrical, 652 plumbing, 551 remodels & repairs. 2,120 were in the last 12 months.
  • What is built most in 33141?Electrical: 795 of the 4,111 permits (19%), against 20% citywide.
  • How long does a permit take in 33141?The usual permit issued here Oct 2024–Sep 2025 took 111 days from issue to final (1,573 permits with a final date), against 118 days citywide.
  • Who did the work in 33141?The city's file doesn't name contractors, so we can't say. Ask a contractor for the permit numbers of past jobs and check them with the city.