Contractor Records
Home › Missoula › Electrical

Electrical permits in the City of Missoula, MT

Data through September 2026 · updated 19 Oct 2026

2,044 electrical permits were issued in the City of Missoula, October 2024 through September 2026: about 1,022 a year and 20% of all permits. 984 electrical permits in the last 12 months (Oct 2025–Sep 2026), 7% fewer than the 1,060 in the 12 months before. The busiest month is July. 59801 has the most, 833.

2,044permits issued
984last 12 months
Julbusiest month
85%finished
Sep 2026records through

Electrical permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 99Oct2024Nov 2024: 74Dec 2024: 87Jan 2025: 73Jan2025Feb 2025: 54Mar 2025: 67Apr 2025: 85May 2025: 92Jun 2025: 118Jul 2025: 121JulAug 2025: 93Sep 2025: 97Oct 2025: 76Nov 2025: 81Dec 2025: 77Jan 2026: 52Jan2026Feb 2026: 55Mar 2026: 79Apr 2026: 92May 2026: 96Jun 2026: 97Jul 2026: 97JulAug 2026: 109Sep 2026: 73
The same numbers as a table
MonthPermits
Oct 202499
Nov 202474
Dec 202487
Jan 202573
Feb 202554
Mar 202567
Apr 202585
May 202592
Jun 2025118
Jul 2025121
Aug 202593
Sep 202597
Oct 202576
Nov 202581
Dec 202577
Jan 202652
Feb 202655
Mar 202679
Apr 202692
May 202696
Jun 202697
Jul 202697
Aug 2026109
Sep 202673

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (128), February the quietest (64). A busy month at the permit counter usually means a longer wait for a contractor.

January: 73 (100 = an average month)February: 64 (100 = an average month)March: 86 (100 = an average month)April: 104 (100 = an average month)May: 110 (100 = an average month)June: 126 (100 = an average month)July: 128 (100 = an average month)128August: 119 (100 = an average month)September: 100 (100 = an average month)October: 103 (100 = an average month)November: 91 (100 = an average month)December: 96 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January73
February64
March86
April104
May110
June126
July128
August119
September100
October103
November91
December96

Download this table (CSV)

How many electrical permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 20251,060
Finished85.4%
Expired11.3%

Download this table (CSV)

ZIP codes with the most electrical permits

Counted at the property's ZIP code. Share is the part of the city's 2,044 electrical permits.

ZIP codePermitsShare
5980183341%
5980241120%
5980836318%
5980332916%
5980413under 1%
598122under 1%

Download this table (CSV)

How Missoula compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Missoula, AddressesWithPermits_mso (ArcGIS Online layer of the city's Accela permit records), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Missoula's building division issues: residential and commercial construction, electrical, mechanical, plumbing, re-roofing, fence and demolition permits. Engineering records in the same system (sewer and water service, utility excavation, paving, right-of-way, ADA ramps), permit revisions and planning cases are left out. Lolo, Frenchtown, Bonner, Seeley Lake and the rest of Missoula County outside the city's building jurisdiction permit through Missoula County and are not in this file.

  • The city's permit layer names no contractor, so there are no contractor lists, rankings or firm pages for Missoula.
  • The layer has no issue date, so a permit is dated by the day its application was filed; applications still in review, approved but not yet issued, or waiting on fees are not counted.
  • Applications for long-review work such as new homes are counted only once issued, so the last few months of the window undercount them until those permits are issued.
  • The layer has no job value, so we show no costs.
  • Because permits are dated by application, we don't show how long they take from issue to final. The finished share comes from the city's status: Final, Inspections Complete, Certificate of Occupancy or Closed. Expired means the permit lapsed without a final.
  • Kinds of building work (new homes, re-roofs, additions, garages) and homes versus other buildings are read from the city's own work description; trade permits count as homes when the description names a house, townhouse, duplex or mobile home.
  • ZIP codes come from the Montana Cadastral parcel record at the permit's address.
  • Re-roofing permits surged after a 2024 storm (August to October 2024), and solar permits peaked in autumn 2025 before the federal residential solar tax credit ended that December, so both fall in the last 12 months against the 12 before.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in the City of Missoula, MT", https://contractorrecords.com/missoula/electrical-permits, data through September 2026, from the City of Missoula Community Planning, Development & Innovation building-permit records.

Link to a table: By month · Season · How many get finished · By ZIP code.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: finished share · Electrical permits by ZIP code.

Common questions

  • How many electrical permits does Missoula issue a year?About 1,022 a year in the City of Missoula: 2,044 permits issued October 2024 through September 2026, 984 of them in the last 12 months.
  • When do people in Missoula file the most electrical permits?July (128 against an average month of 100); February is the quietest (64). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most electrical permits in Missoula?59801, with 833 of the 2,044 (41%); then 59802 (411).