255 fence and wall permits were issued in the City of Missoula, October 2024 through September 2026: about 128 a year and 2% of all permits. 145 fence and wall permits in the last 12 months (Oct 2025–Sep 2026), 32% more than the 110 in the 12 months before. The busiest month is July. 59801 has the most, 107.

255permits issued
145last 12 months
Julbusiest month
17%finished
Sep 2026records through

Fence and wall permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 9Oct2024Nov 2024: 3Dec 2024: 4Jan 2025: 1Jan2025Feb 2025: 2Mar 2025: 11Apr 2025: 14May 2025: 11Jun 2025: 14Jul 2025: 14JulAug 2025: 12Sep 2025: 15Oct 2025: 18Nov 2025: 8Dec 2025: 11Jan 2026: 3Jan2026Feb 2026: 6Mar 2026: 6Apr 2026: 16May 2026: 14Jun 2026: 16Jul 2026: 18JulAug 2026: 15Sep 2026: 14
The same numbers as a table
MonthPermits
Oct 20249
Nov 20243
Dec 20244
Jan 20251
Feb 20252
Mar 202511
Apr 202514
May 202511
Jun 202514
Jul 202514
Aug 202512
Sep 202515
Oct 202518
Nov 20258
Dec 202511
Jan 20263
Feb 20266
Mar 20266
Apr 202616
May 202614
Jun 202616
Jul 202618
Aug 202615
Sep 202614

Download this table (CSV)

When fence and wall permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (151), January the quietest (19). A busy month at the permit counter usually means a longer wait for a contractor.

January: 19 (100 = an average month)February: 38 (100 = an average month)March: 80 (100 = an average month)April: 141 (100 = an average month)May: 118 (100 = an average month)June: 141 (100 = an average month)July: 151 (100 = an average month)151August: 127 (100 = an average month)September: 136 (100 = an average month)October: 127 (100 = an average month)November: 52 (100 = an average month)December: 71 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January19
February38
March80
April141
May118
June141
July151
August127
September136
October127
November52
December71

Download this table (CSV)

How many fence and wall permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025110
Finished17.3%
Expired0.0%

Download this table (CSV)

ZIP codes with the most fence and wall permits

Counted at the property's ZIP code. Share is the part of the city's 255 fence and wall permits.

ZIP codePermitsShare
5980110742%
598036124%
598024216%
598084016%
598042under 1%

Download this table (CSV)

How these numbers are made

Source: City of Missoula, AddressesWithPermits_mso (ArcGIS Online layer of the city's Accela permit records), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Missoula's building division issues: residential and commercial construction, electrical, mechanical, plumbing, re-roofing, fence and demolition permits. Engineering records in the same system (sewer and water service, utility excavation, paving, right-of-way, ADA ramps), permit revisions and planning cases are left out. Lolo, Frenchtown, Bonner, Seeley Lake and the rest of Missoula County outside the city's building jurisdiction permit through Missoula County and are not in this file.

  • The city's permit layer names no contractor, so there are no contractor lists, rankings or firm pages for Missoula.
  • The layer has no issue date, so a permit is dated by the day its application was filed; applications still in review, approved but not yet issued, or waiting on fees are not counted.
  • Applications for long-review work such as new homes are counted only once issued, so the last few months of the window undercount them until those permits are issued.
  • The layer has no job value, so we show no costs.
  • Because permits are dated by application, we don't show how long they take from issue to final. The finished share comes from the city's status: Final, Inspections Complete, Certificate of Occupancy or Closed. Expired means the permit lapsed without a final.
  • Kinds of building work (new homes, re-roofs, additions, garages) and homes versus other buildings are read from the city's own work description; trade permits count as homes when the description names a house, townhouse, duplex or mobile home.
  • ZIP codes come from the Montana Cadastral parcel record at the permit's address.
  • Re-roofing permits surged after a 2024 storm (August to October 2024), and solar permits peaked in autumn 2025 before the federal residential solar tax credit ended that December, so both fall in the last 12 months against the 12 before.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Fence and wall permits in the City of Missoula, MT", https://contractorrecords.com/missoula/fence-permits, data through September 2026, from the City of Missoula Community Planning, Development & Innovation building-permit records.

Link to a table: By month · Season · How many get finished · By ZIP code.

Download the tables (CSV): Fences & walls permits by month · Fences & walls permits by calendar month (index) · Fences & walls permits: finished share · Fences & walls permits by ZIP code.

Common questions

  • How many fence and wall permits does Missoula issue a year?About 128 a year in the City of Missoula: 255 permits issued October 2024 through September 2026, 145 of them in the last 12 months.
  • When do people in Missoula file the most fence and wall permits?July (151 against an average month of 100); January is the quietest (19). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most fence and wall permits in Missoula?59801, with 107 of the 255 (42%); then 59803 (61).