Contractor Records
Home › Missoula › New homes

New home permits in the City of Missoula, MT

Data through September 2026 · updated 19 Oct 2026

233 new home permits were issued in the City of Missoula, October 2024 through September 2026: about 116 a year and 2% of all permits. 108 new home permits in the last 12 months (Oct 2025–Sep 2026), 14% fewer than the 125 in the 12 months before. The busiest month is February. 59803 has the most, 82.

233permits issued
108last 12 months
Febbusiest month
67%finished
Sep 2026records through

New home permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 16Oct2024Nov 2024: 12Dec 2024: 5Jan 2025: 10Jan2025Feb 2025: 13Mar 2025: 14Apr 2025: 9May 2025: 19Jun 2025: 9Jul 2025: 9JulAug 2025: 7Sep 2025: 2Oct 2025: 7Nov 2025: 6Dec 2025: 12Jan 2026: 11Jan2026Feb 2026: 18Mar 2026: 13Apr 2026: 7May 2026: 12Jun 2026: 12Jul 2026: 9JulAug 2026: 1Sep 2026: 0
The same numbers as a table
MonthPermits
Oct 202416
Nov 202412
Dec 20245
Jan 202510
Feb 202513
Mar 202514
Apr 20259
May 202519
Jun 20259
Jul 20259
Aug 20257
Sep 20252
Oct 20257
Nov 20256
Dec 202512
Jan 202611
Feb 202618
Mar 202613
Apr 20267
May 202612
Jun 202612
Jul 20269
Aug 20261
Sep 20260

Download this table (CSV)

When new home permits are filed

By calendar month, 100 = an average month (the thin line). February is the busiest (160), September the quietest (10). A busy month at the permit counter usually means a longer wait for a contractor.

January: 108 (100 = an average month)February: 160 (100 = an average month)160March: 139 (100 = an average month)April: 82 (100 = an average month)May: 160 (100 = an average month)June: 108 (100 = an average month)July: 93 (100 = an average month)August: 41 (100 = an average month)September: 10 (100 = an average month)October: 118 (100 = an average month)November: 93 (100 = an average month)December: 88 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January108
February160
March139
April82
May160
June108
July93
August41
September10
October118
November93
December88

Download this table (CSV)

How many new home permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025125
Finished67.2%
Expired4.8%

Download this table (CSV)

ZIP codes with the most new home permits

Counted at the property's ZIP code. Share is the part of the city's 233 new home permits.

ZIP codePermitsShare
598038235%
598085825%
598023013%
59801156%

Download this table (CSV)

How Missoula compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Missoula, AddressesWithPermits_mso (ArcGIS Online layer of the city's Accela permit records), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Missoula's building division issues: residential and commercial construction, electrical, mechanical, plumbing, re-roofing, fence and demolition permits. Engineering records in the same system (sewer and water service, utility excavation, paving, right-of-way, ADA ramps), permit revisions and planning cases are left out. Lolo, Frenchtown, Bonner, Seeley Lake and the rest of Missoula County outside the city's building jurisdiction permit through Missoula County and are not in this file.

  • The city's permit layer names no contractor, so there are no contractor lists, rankings or firm pages for Missoula.
  • The layer has no issue date, so a permit is dated by the day its application was filed; applications still in review, approved but not yet issued, or waiting on fees are not counted.
  • Applications for long-review work such as new homes are counted only once issued, so the last few months of the window undercount them until those permits are issued.
  • The layer has no job value, so we show no costs.
  • Because permits are dated by application, we don't show how long they take from issue to final. The finished share comes from the city's status: Final, Inspections Complete, Certificate of Occupancy or Closed. Expired means the permit lapsed without a final.
  • Kinds of building work (new homes, re-roofs, additions, garages) and homes versus other buildings are read from the city's own work description; trade permits count as homes when the description names a house, townhouse, duplex or mobile home.
  • ZIP codes come from the Montana Cadastral parcel record at the permit's address.
  • Re-roofing permits surged after a 2024 storm (August to October 2024), and solar permits peaked in autumn 2025 before the federal residential solar tax credit ended that December, so both fall in the last 12 months against the 12 before.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "New home permits in the City of Missoula, MT", https://contractorrecords.com/missoula/new-home-permits, data through September 2026, from the City of Missoula Community Planning, Development & Innovation building-permit records.

Link to a table: By month · Season · How many get finished · By ZIP code.

Download the tables (CSV): New homes permits by month · New homes permits by calendar month (index) · New homes permits: finished share · New homes permits by ZIP code.

Common questions

  • How many new home permits does Missoula issue a year?About 116 a year in the City of Missoula: 233 permits issued October 2024 through September 2026, 108 of them in the last 12 months.
  • When do people in Missoula file the most new home permits?February (160 against an average month of 100); September is the quietest (10). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most new home permits in Missoula?59803, with 82 of the 233 (35%); then 59808 (58).