Solar permits in the City of Missoula, MT

Data through September 2026 · updated 19 Oct 2026

815 solar permits were issued in the City of Missoula, October 2024 through September 2026: about 408 a year and 8% of all permits. 343 solar permits in the last 12 months (Oct 2025–Sep 2026), 27% fewer than the 472 in the 12 months before. The busiest month is October. 59801 has the most, 322.

815permits issued
343last 12 months
Octbusiest month
97%finished
Sep 2026records through

Solar permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 48Oct2024Nov 2024: 25Dec 2024: 37Jan 2025: 16Jan2025Feb 2025: 23Mar 2025: 29Apr 2025: 37May 2025: 48Jun 2025: 34Jul 2025: 45JulAug 2025: 54Sep 2025: 76Oct 2025: 119Nov 2025: 49Dec 2025: 22Jan 2026: 11Jan2026Feb 2026: 9Mar 2026: 13Apr 2026: 19May 2026: 14Jun 2026: 20Jul 2026: 21JulAug 2026: 24Sep 2026: 22
The same numbers as a table
MonthPermits
Oct 202448
Nov 202425
Dec 202437
Jan 202516
Feb 202523
Mar 202529
Apr 202537
May 202548
Jun 202534
Jul 202545
Aug 202554
Sep 202576
Oct 2025119
Nov 202549
Dec 202522
Jan 202611
Feb 20269
Mar 202613
Apr 202619
May 202614
Jun 202620
Jul 202621
Aug 202624
Sep 202622

Download this table (CSV)

When solar permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (246), January the quietest (40). A busy month at the permit counter usually means a longer wait for a contractor.

January: 40 (100 = an average month)February: 47 (100 = an average month)March: 62 (100 = an average month)April: 82 (100 = an average month)May: 91 (100 = an average month)June: 80 (100 = an average month)July: 97 (100 = an average month)August: 115 (100 = an average month)September: 144 (100 = an average month)October: 246 (100 = an average month)246November: 109 (100 = an average month)December: 87 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January40
February47
March62
April82
May91
June80
July97
August115
September144
October246
November109
December87

Download this table (CSV)

How many solar permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025472
Finished97.0%
Expired3.0%

Download this table (CSV)

ZIP codes with the most solar permits

Counted at the property's ZIP code. Share is the part of the city's 815 solar permits.

ZIP codePermitsShare
5980132240%
5980322628%
5980219023%
59808628%
59804121%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Electrical79798%
Residential Construction142%
Commercial Construction4under 1%

Download this table (CSV)

How Missoula compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Missoula, AddressesWithPermits_mso (ArcGIS Online layer of the city's Accela permit records), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Missoula's building division issues: residential and commercial construction, electrical, mechanical, plumbing, re-roofing, fence and demolition permits. Engineering records in the same system (sewer and water service, utility excavation, paving, right-of-way, ADA ramps), permit revisions and planning cases are left out. Lolo, Frenchtown, Bonner, Seeley Lake and the rest of Missoula County outside the city's building jurisdiction permit through Missoula County and are not in this file.

  • The city's permit layer names no contractor, so there are no contractor lists, rankings or firm pages for Missoula.
  • The layer has no issue date, so a permit is dated by the day its application was filed; applications still in review, approved but not yet issued, or waiting on fees are not counted.
  • Applications for long-review work such as new homes are counted only once issued, so the last few months of the window undercount them until those permits are issued.
  • The layer has no job value, so we show no costs.
  • Because permits are dated by application, we don't show how long they take from issue to final. The finished share comes from the city's status: Final, Inspections Complete, Certificate of Occupancy or Closed. Expired means the permit lapsed without a final.
  • Kinds of building work (new homes, re-roofs, additions, garages) and homes versus other buildings are read from the city's own work description; trade permits count as homes when the description names a house, townhouse, duplex or mobile home.
  • ZIP codes come from the Montana Cadastral parcel record at the permit's address.
  • Re-roofing permits surged after a 2024 storm (August to October 2024), and solar permits peaked in autumn 2025 before the federal residential solar tax credit ended that December, so both fall in the last 12 months against the 12 before.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Solar permits in the City of Missoula, MT", https://contractorrecords.com/missoula/solar-permits, data through September 2026, from the City of Missoula Community Planning, Development & Innovation building-permit records.

Link to a table: By month · Season · How many get finished · By ZIP code · Permit types.

Download the tables (CSV): Solar permits by month · Solar permits by calendar month (index) · Solar permits: finished share · Solar permits by ZIP code · Solar permits by permit type.

Common questions

  • How many solar permits does Missoula issue a year?About 408 a year in the City of Missoula: 815 permits issued October 2024 through September 2026, 343 of them in the last 12 months.
  • When do people in Missoula file the most solar permits?October (246 against an average month of 100); January is the quietest (40). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most solar permits in Missoula?59801, with 322 of the 815 (40%); then 59803 (226).