Contractor Records
Home › Missoula › Remodels & repairs

Remodel and repair permits in the City of Missoula, MT

Data through September 2026 · updated 19 Oct 2026

206 remodel and repair permits were issued in the City of Missoula, October 2024 through September 2026: about 103 a year and 2% of all permits. 104 remodel and repair permits in the last 12 months (Oct 2025–Sep 2026), about the same as the 102 in the 12 months before. The busiest month is March. 59801 has the most, 103.

206permits issued
104last 12 months
Marbusiest month
62%finished
Sep 2026records through

Remodel and repair permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 6Oct2024Nov 2024: 6Dec 2024: 8Jan 2025: 8Jan2025Feb 2025: 2Mar 2025: 17Apr 2025: 10May 2025: 14Jun 2025: 6Jul 2025: 7JulAug 2025: 8Sep 2025: 10Oct 2025: 10Nov 2025: 5Dec 2025: 11Jan 2026: 8Jan2026Feb 2026: 12Mar 2026: 13Apr 2026: 15May 2026: 10Jun 2026: 10Jul 2026: 6JulAug 2026: 3Sep 2026: 1
The same numbers as a table
MonthPermits
Oct 20246
Nov 20246
Dec 20248
Jan 20258
Feb 20252
Mar 202517
Apr 202510
May 202514
Jun 20256
Jul 20257
Aug 20258
Sep 202510
Oct 202510
Nov 20255
Dec 202511
Jan 20268
Feb 202612
Mar 202613
Apr 202615
May 202610
Jun 202610
Jul 20266
Aug 20263
Sep 20261

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). March is the busiest (175), August the quietest (64). A busy month at the permit counter usually means a longer wait for a contractor.

January: 93 (100 = an average month)February: 82 (100 = an average month)March: 175 (100 = an average month)175April: 146 (100 = an average month)May: 140 (100 = an average month)June: 93 (100 = an average month)July: 76 (100 = an average month)August: 64 (100 = an average month)September: 64 (100 = an average month)October: 93 (100 = an average month)November: 64 (100 = an average month)December: 111 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January93
February82
March175
April146
May140
June93
July76
August64
September64
October93
November64
December111

Download this table (CSV)

How many remodel and repair permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025102
Finished61.8%
Expired28.4%

Download this table (CSV)

ZIP codes with the most remodel and repair permits

Counted at the property's ZIP code. Share is the part of the city's 206 remodel and repair permits.

ZIP codePermitsShare
5980110350%
598034924%
598023517%
59808157%
598041under 1%

Download this table (CSV)

How Missoula compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Missoula, AddressesWithPermits_mso (ArcGIS Online layer of the city's Accela permit records), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Missoula's building division issues: residential and commercial construction, electrical, mechanical, plumbing, re-roofing, fence and demolition permits. Engineering records in the same system (sewer and water service, utility excavation, paving, right-of-way, ADA ramps), permit revisions and planning cases are left out. Lolo, Frenchtown, Bonner, Seeley Lake and the rest of Missoula County outside the city's building jurisdiction permit through Missoula County and are not in this file.

  • The city's permit layer names no contractor, so there are no contractor lists, rankings or firm pages for Missoula.
  • The layer has no issue date, so a permit is dated by the day its application was filed; applications still in review, approved but not yet issued, or waiting on fees are not counted.
  • Applications for long-review work such as new homes are counted only once issued, so the last few months of the window undercount them until those permits are issued.
  • The layer has no job value, so we show no costs.
  • Because permits are dated by application, we don't show how long they take from issue to final. The finished share comes from the city's status: Final, Inspections Complete, Certificate of Occupancy or Closed. Expired means the permit lapsed without a final.
  • Kinds of building work (new homes, re-roofs, additions, garages) and homes versus other buildings are read from the city's own work description; trade permits count as homes when the description names a house, townhouse, duplex or mobile home.
  • ZIP codes come from the Montana Cadastral parcel record at the permit's address.
  • Re-roofing permits surged after a 2024 storm (August to October 2024), and solar permits peaked in autumn 2025 before the federal residential solar tax credit ended that December, so both fall in the last 12 months against the 12 before.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in the City of Missoula, MT", https://contractorrecords.com/missoula/remodel-permits, data through September 2026, from the City of Missoula Community Planning, Development & Innovation building-permit records.

Link to a table: By month · Season · How many get finished · By ZIP code.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: finished share · Remodels & repairs permits by ZIP code.

Common questions

  • How many remodel and repair permits does Missoula issue a year?About 103 a year in the City of Missoula: 206 permits issued October 2024 through September 2026, 104 of them in the last 12 months.
  • When do people in Missoula file the most remodel and repair permits?March (175 against an average month of 100); August is the quietest (64). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most remodel and repair permits in Missoula?59801, with 103 of the 206 (50%); then 59803 (49).