Contractor Records
Home › Missoula › Roofing

Roofing permits in the City of Missoula, MT

Data through September 2026 · updated 19 Oct 2026

1,857 roofing permits were issued in the City of Missoula, October 2024 through September 2026: about 928 a year and 18% of all permits. 777 roofing permits in the last 12 months (Oct 2025–Sep 2026), 28% fewer than the 1,080 in the 12 months before. The busiest month is October. 59801 has the most, 776.

1,857permits issued
777last 12 months
Octbusiest month
84%finished
Sep 2026records through

Roofing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 172Oct2024Nov 2024: 76Dec 2024: 30Jan 2025: 30Jan2025Feb 2025: 23Mar 2025: 139Apr 2025: 114May 2025: 84Jun 2025: 83Jul 2025: 146JulAug 2025: 90Sep 2025: 93Oct 2025: 69Nov 2025: 54Dec 2025: 19Jan 2026: 37Jan2026Feb 2026: 34Mar 2026: 68Apr 2026: 92May 2026: 86Jun 2026: 80Jul 2026: 75JulAug 2026: 87Sep 2026: 76
The same numbers as a table
MonthPermits
Oct 2024172
Nov 202476
Dec 202430
Jan 202530
Feb 202523
Mar 2025139
Apr 2025114
May 202584
Jun 202583
Jul 2025146
Aug 202590
Sep 202593
Oct 202569
Nov 202554
Dec 202519
Jan 202637
Feb 202634
Mar 202668
Apr 202692
May 202686
Jun 202680
Jul 202675
Aug 202687
Sep 202676

Download this table (CSV)

When roofing permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (156), December the quietest (32). A busy month at the permit counter usually means a longer wait for a contractor.

January: 43 (100 = an average month)February: 37 (100 = an average month)March: 134 (100 = an average month)April: 133 (100 = an average month)May: 110 (100 = an average month)June: 105 (100 = an average month)July: 143 (100 = an average month)August: 114 (100 = an average month)September: 109 (100 = an average month)October: 156 (100 = an average month)156November: 84 (100 = an average month)December: 32 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January43
February37
March134
April133
May110
June105
July143
August114
September109
October156
November84
December32

Download this table (CSV)

How many roofing permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 20251,080
Finished84.4%
Expired15.4%

Download this table (CSV)

ZIP codes with the most roofing permits

Counted at the property's ZIP code. Share is the part of the city's 1,857 roofing permits.

ZIP codePermitsShare
5980177642%
5980344324%
5980233318%
5980825914%
59804231%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential Construction1,00354%
Roofing74740%
Commercial Construction1076%

Download this table (CSV)

How Missoula compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Missoula, AddressesWithPermits_mso (ArcGIS Online layer of the city's Accela permit records), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Missoula's building division issues: residential and commercial construction, electrical, mechanical, plumbing, re-roofing, fence and demolition permits. Engineering records in the same system (sewer and water service, utility excavation, paving, right-of-way, ADA ramps), permit revisions and planning cases are left out. Lolo, Frenchtown, Bonner, Seeley Lake and the rest of Missoula County outside the city's building jurisdiction permit through Missoula County and are not in this file.

  • The city's permit layer names no contractor, so there are no contractor lists, rankings or firm pages for Missoula.
  • The layer has no issue date, so a permit is dated by the day its application was filed; applications still in review, approved but not yet issued, or waiting on fees are not counted.
  • Applications for long-review work such as new homes are counted only once issued, so the last few months of the window undercount them until those permits are issued.
  • The layer has no job value, so we show no costs.
  • Because permits are dated by application, we don't show how long they take from issue to final. The finished share comes from the city's status: Final, Inspections Complete, Certificate of Occupancy or Closed. Expired means the permit lapsed without a final.
  • Kinds of building work (new homes, re-roofs, additions, garages) and homes versus other buildings are read from the city's own work description; trade permits count as homes when the description names a house, townhouse, duplex or mobile home.
  • ZIP codes come from the Montana Cadastral parcel record at the permit's address.
  • Re-roofing permits surged after a 2024 storm (August to October 2024), and solar permits peaked in autumn 2025 before the federal residential solar tax credit ended that December, so both fall in the last 12 months against the 12 before.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Roofing permits in the City of Missoula, MT", https://contractorrecords.com/missoula/roofing-permits, data through September 2026, from the City of Missoula Community Planning, Development & Innovation building-permit records.

Link to a table: By month · Season · How many get finished · By ZIP code · Permit types.

Download the tables (CSV): Roofing permits by month · Roofing permits by calendar month (index) · Roofing permits: finished share · Roofing permits by ZIP code · Roofing permits by permit type.

Common questions

  • How many roofing permits does Missoula issue a year?About 928 a year in the City of Missoula: 1,857 permits issued October 2024 through September 2026, 777 of them in the last 12 months.
  • When do people in Missoula file the most roofing permits?October (156 against an average month of 100); December is the quietest (32). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most roofing permits in Missoula?59801, with 776 of the 1,857 (42%); then 59803 (443).