HVAC permits in the City of Missoula, MT

Data through September 2026 · updated 19 Oct 2026

2,420 HVAC permits were issued in the City of Missoula, October 2024 through September 2026: about 1,210 a year and 23% of all permits. 1,175 HVAC permits in the last 12 months (Oct 2025–Sep 2026), 6% fewer than the 1,245 in the 12 months before. The busiest month is June. 59801 has the most, 870.

2,420permits issued
1,175last 12 months
Junbusiest month
92%finished
Sep 2026records through

HVAC permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 112Oct2024Nov 2024: 99Dec 2024: 111Jan 2025: 95Jan2025Feb 2025: 74Mar 2025: 110Apr 2025: 118May 2025: 79Jun 2025: 131Jul 2025: 123JulAug 2025: 103Sep 2025: 90Oct 2025: 108Nov 2025: 91Dec 2025: 87Jan 2026: 86Jan2026Feb 2026: 92Mar 2026: 98Apr 2026: 87May 2026: 101Jun 2026: 118Jul 2026: 105JulAug 2026: 88Sep 2026: 114
The same numbers as a table
MonthPermits
Oct 2024112
Nov 202499
Dec 2024111
Jan 202595
Feb 202574
Mar 2025110
Apr 2025118
May 202579
Jun 2025131
Jul 2025123
Aug 2025103
Sep 202590
Oct 2025108
Nov 202591
Dec 202587
Jan 202686
Feb 202692
Mar 202698
Apr 202687
May 2026101
Jun 2026118
Jul 2026105
Aug 202688
Sep 2026114

Download this table (CSV)

When HVAC permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (123), February the quietest (82). A busy month at the permit counter usually means a longer wait for a contractor.

January: 90 (100 = an average month)February: 82 (100 = an average month)March: 103 (100 = an average month)April: 102 (100 = an average month)May: 89 (100 = an average month)June: 123 (100 = an average month)123July: 113 (100 = an average month)August: 95 (100 = an average month)September: 101 (100 = an average month)October: 109 (100 = an average month)November: 94 (100 = an average month)December: 98 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January90
February82
March103
April102
May89
June123
July113
August95
September101
October109
November94
December98

Download this table (CSV)

How many HVAC permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 20251,245
Finished92.1%
Expired6.7%

Download this table (CSV)

ZIP codes with the most HVAC permits

Counted at the property's ZIP code. Share is the part of the city's 2,420 HVAC permits.

ZIP codePermitsShare
5980187036%
5980850021%
5980248320%
5980346519%
5980416under 1%
598122under 1%

Download this table (CSV)

How Missoula compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Missoula, AddressesWithPermits_mso (ArcGIS Online layer of the city's Accela permit records), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Missoula's building division issues: residential and commercial construction, electrical, mechanical, plumbing, re-roofing, fence and demolition permits. Engineering records in the same system (sewer and water service, utility excavation, paving, right-of-way, ADA ramps), permit revisions and planning cases are left out. Lolo, Frenchtown, Bonner, Seeley Lake and the rest of Missoula County outside the city's building jurisdiction permit through Missoula County and are not in this file.

  • The city's permit layer names no contractor, so there are no contractor lists, rankings or firm pages for Missoula.
  • The layer has no issue date, so a permit is dated by the day its application was filed; applications still in review, approved but not yet issued, or waiting on fees are not counted.
  • Applications for long-review work such as new homes are counted only once issued, so the last few months of the window undercount them until those permits are issued.
  • The layer has no job value, so we show no costs.
  • Because permits are dated by application, we don't show how long they take from issue to final. The finished share comes from the city's status: Final, Inspections Complete, Certificate of Occupancy or Closed. Expired means the permit lapsed without a final.
  • Kinds of building work (new homes, re-roofs, additions, garages) and homes versus other buildings are read from the city's own work description; trade permits count as homes when the description names a house, townhouse, duplex or mobile home.
  • ZIP codes come from the Montana Cadastral parcel record at the permit's address.
  • Re-roofing permits surged after a 2024 storm (August to October 2024), and solar permits peaked in autumn 2025 before the federal residential solar tax credit ended that December, so both fall in the last 12 months against the 12 before.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "HVAC permits in the City of Missoula, MT", https://contractorrecords.com/missoula/hvac-permits, data through September 2026, from the City of Missoula Community Planning, Development & Innovation building-permit records.

Link to a table: By month · Season · How many get finished · By ZIP code.

Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index) · HVAC permits: finished share · HVAC permits by ZIP code.

Common questions

  • How many HVAC permits does Missoula issue a year?About 1,210 a year in the City of Missoula: 2,420 permits issued October 2024 through September 2026, 1,175 of them in the last 12 months.
  • When do people in Missoula file the most HVAC permits?June (123 against an average month of 100); February is the quietest (82). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most HVAC permits in Missoula?59801, with 870 of the 2,420 (36%); then 59808 (500).