Electrical permits in New Braunfels, TX

Data through September 2026 · updated 19 Oct 2026

1,363 electrical permits were issued in New Braunfels, October 2024 through September 2026: about 682 a year and 10% of all permits. 584 electrical permits in the last 12 months (Oct 2025–Sep 2026), 25% fewer than the 779 in the 12 months before. The busiest month is October. The usual one took 84 days from issue to the city's final. 78130 has the most, 752.

1,363permits issued
584last 12 months
Octbusiest month
84days, usual issue to final
59%finished
Sep 2026records through

Electrical permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 80Oct2024Nov 2024: 66Dec 2024: 62Jan 2025: 71Jan2025Feb 2025: 71Mar 2025: 71Apr 2025: 63May 2025: 60Jun 2025: 71Jul 2025: 69JulAug 2025: 50Sep 2025: 45Oct 2025: 80Nov 2025: 37Dec 2025: 35Jan 2026: 27Jan2026Feb 2026: 38Mar 2026: 51Apr 2026: 50May 2026: 50Jun 2026: 55Jul 2026: 52JulAug 2026: 62Sep 2026: 47
The same numbers as a table
MonthPermits
Oct 202480
Nov 202466
Dec 202462
Jan 202571
Feb 202571
Mar 202571
Apr 202563
May 202560
Jun 202571
Jul 202569
Aug 202550
Sep 202545
Oct 202580
Nov 202537
Dec 202535
Jan 202627
Feb 202638
Mar 202651
Apr 202650
May 202650
Jun 202655
Jul 202652
Aug 202662
Sep 202647

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (141), September the quietest (81). A busy month at the permit counter usually means a longer wait for a contractor.

January: 86 (100 = an average month)February: 96 (100 = an average month)March: 107 (100 = an average month)April: 99 (100 = an average month)May: 97 (100 = an average month)June: 111 (100 = an average month)July: 107 (100 = an average month)August: 99 (100 = an average month)September: 81 (100 = an average month)October: 141 (100 = an average month)141November: 91 (100 = an average month)December: 85 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January86
February96
March107
April99
May97
June111
July107
August99
September81
October141
November91
December85

Download this table (CSV)

How long an electrical permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 457 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025779
Finished58.7%
Expired0.0%
Usual days, issue to final84
Middle half, days41–164

Download this table (CSV)

ZIP codes with the most electrical permits

Counted at the property's ZIP code. Share is the part of the city's 1,363 electrical permits.

ZIP codePermitsShare
7813075255%
7813213510%
781241under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential - Electrical93769%
Commercial - Electrical42631%

Download this table (CSV)

Most active contractors by permits filed

The contractors named on the most electrical permits in the City of New Braunfels Open Data file, October 2024 through September 2026, with 5 or more each. Share is the part of all 1,363 electrical permits; 97% of them name a contractor we can show. This is volume, not quality: more permits doesn't mean better work. Individuals' names, owner-builders and blanks are left out.

ContractorPermitsShare
Allen Bebee Electric987%
Freedom Forever Texas LLC433%
Zellner Electric LLC423%
Boost Electric LLC373%
NB Electric LLC353%
Greenstar Power LLC342%
Keith Zars Pools Ltd282%
Bethea Electric LLC262%
TX Electric NB Inc222%
Gvec Home Services201%

Download this table (CSV)

How New Braunfels compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Electrical permits for other places in Austin and San Antonio. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of New Braunfels Open Data, OpenData/PlanningZoning MapServer layer 10 (Permits), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, electrical, plumbing, mechanical, irrigation, roofing and other construction permits the City of New Braunfels Development Services issues inside city limits, in both Comal and Guadalupe counties. Planning, platting, engineering, floodplain and inspection-request records are not counted.

  • The city's file lists the contractor on most permits. The contractor table counts permits filed per firm; it does not rate, rank or compare their work, and there are no firm pages for New Braunfels.
  • The file has no declared job value, so we show no costs.
  • A final date is the date the city closed the permit. A permit the city left at Issued counts as open.
  • Lawn-irrigation permits, driveways, flatwork and signs count as other. Foundation repairs count as remodels and repairs.
  • The file has no ZIP column; ZIP codes come from the address where it ends in one (about 60% of permits).

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in New Braunfels, TX", https://contractorrecords.com/new-braunfels/electrical-permits, data through September 2026, from City of New Braunfels Development Services building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types · Most active contractors by permits filed.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: days to final · Electrical permits by ZIP code · Electrical permits by permit type · Most active contractors by permits filed.

Common questions

  • How many electrical permits does New Braunfels issue a year?About 682 a year in New Braunfels: 1,363 permits issued October 2024 through September 2026, 584 of them in the last 12 months.
  • How long does an electrical permit take in New Braunfels?The usual one took 84 days from issue to the city's final inspection, and the middle half took 41 to 164 days (457 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in New Braunfels file the most electrical permits?October (141 against an average month of 100); September is the quietest (81). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most electrical permits in New Braunfels?78130, with 752 of the 1,363 (55%); then 78132 (135).