HVAC permits in New Braunfels, TX

Data through September 2026 · updated 19 Oct 2026

1,382 HVAC permits were issued in New Braunfels, October 2024 through September 2026: about 691 a year and 10% of all permits. 640 HVAC permits in the last 12 months (Oct 2025–Sep 2026), 14% fewer than the 742 in the 12 months before. The busiest month is June. The usual one took 76 days from issue to the city's final. 78130 has the most, 694.

1,382permits issued
640last 12 months
Junbusiest month
76days, usual issue to final
41%finished
Sep 2026records through

HVAC permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 56Oct2024Nov 2024: 51Dec 2024: 61Jan 2025: 63Jan2025Feb 2025: 48Mar 2025: 64Apr 2025: 86May 2025: 66Jun 2025: 62Jul 2025: 72JulAug 2025: 62Sep 2025: 51Oct 2025: 54Nov 2025: 38Dec 2025: 43Jan 2026: 32Jan2026Feb 2026: 36Mar 2026: 40Apr 2026: 42May 2026: 58Jun 2026: 86Jul 2026: 71JulAug 2026: 67Sep 2026: 73
The same numbers as a table
MonthPermits
Oct 202456
Nov 202451
Dec 202461
Jan 202563
Feb 202548
Mar 202564
Apr 202586
May 202566
Jun 202562
Jul 202572
Aug 202562
Sep 202551
Oct 202554
Nov 202538
Dec 202543
Jan 202632
Feb 202636
Mar 202640
Apr 202642
May 202658
Jun 202686
Jul 202671
Aug 202667
Sep 202673

Download this table (CSV)

When HVAC permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (129), February the quietest (73). A busy month at the permit counter usually means a longer wait for a contractor.

January: 82 (100 = an average month)February: 73 (100 = an average month)March: 90 (100 = an average month)April: 111 (100 = an average month)May: 108 (100 = an average month)June: 129 (100 = an average month)129July: 124 (100 = an average month)August: 112 (100 = an average month)September: 108 (100 = an average month)October: 96 (100 = an average month)November: 77 (100 = an average month)December: 90 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January82
February73
March90
April111
May108
June129
July124
August112
September108
October96
November77
December90

Download this table (CSV)

How long an HVAC permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 302 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025742
Finished40.7%
Expired0.1%
Usual days, issue to final76
Middle half, days28–179

Download this table (CSV)

ZIP codes with the most HVAC permits

Counted at the property's ZIP code. Share is the part of the city's 1,382 HVAC permits.

ZIP codePermitsShare
7813069450%
781321189%
782131under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential - Mechanical1,13282%
Commercial - Mechanical25018%

Download this table (CSV)

Most active contractors by permits filed

The contractors named on the most HVAC permits in the City of New Braunfels Open Data file, October 2024 through September 2026, with 5 or more each. Share is the part of all 1,382 HVAC permits; 98% of them name a contractor we can show. This is volume, not quality: more permits doesn't mean better work. Individuals' names, owner-builders and blanks are left out.

ContractorPermitsShare
Legacy Heating & Air Conditioning Services LLC15111%
Meyer Heating and Air Conditioning1199%
Classic Services LLC866%
Will Fix It American Residential Services LLC776%
Jon Wayne Heating & Air755%
Airtron Inc584%
AC State Air Inc524%
Komfort King Heating and Air Conditioning443%
Statewide Service Company393%
Beyer AC & Heating373%

Download this table (CSV)

How New Braunfels compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

HVAC permits for other places in Austin and San Antonio. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of New Braunfels Open Data, OpenData/PlanningZoning MapServer layer 10 (Permits), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, electrical, plumbing, mechanical, irrigation, roofing and other construction permits the City of New Braunfels Development Services issues inside city limits, in both Comal and Guadalupe counties. Planning, platting, engineering, floodplain and inspection-request records are not counted.

  • The city's file lists the contractor on most permits. The contractor table counts permits filed per firm; it does not rate, rank or compare their work, and there are no firm pages for New Braunfels.
  • The file has no declared job value, so we show no costs.
  • A final date is the date the city closed the permit. A permit the city left at Issued counts as open.
  • Lawn-irrigation permits, driveways, flatwork and signs count as other. Foundation repairs count as remodels and repairs.
  • The file has no ZIP column; ZIP codes come from the address where it ends in one (about 60% of permits).

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "HVAC permits in New Braunfels, TX", https://contractorrecords.com/new-braunfels/hvac-permits, data through September 2026, from City of New Braunfels Development Services building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types · Most active contractors by permits filed.

Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index) · HVAC permits: days to final · HVAC permits by ZIP code · HVAC permits by permit type · Most active contractors by permits filed.

Common questions

  • How many HVAC permits does New Braunfels issue a year?About 691 a year in New Braunfels: 1,382 permits issued October 2024 through September 2026, 640 of them in the last 12 months.
  • How long does an HVAC permit take in New Braunfels?The usual one took 76 days from issue to the city's final inspection, and the middle half took 28 to 179 days (302 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in New Braunfels file the most HVAC permits?June (129 against an average month of 100); February is the quietest (73). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most HVAC permits in New Braunfels?78130, with 694 of the 1,382 (50%); then 78132 (118).